Federal contract award
2031JG23F00373
TASK ORDER2031JG23D00020-2031JG23F00373 VAULT D (B48) RM240 RENOVATION
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Treasury |
| Office | US MINT HEADQUARTERS |
| NAICS | 236210 — Industrial Building Construction |
| PSC | Z2EC — REPAIR OR ALTERATION OF PRODUCTION BUILDINGS |
| Parent award / vehicle | 2031JG23D00020 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $3.1M |
| Current contract value | $3.1M |
| Potential contract value / ceiling | $3.1M |
| Start date | Sep 27, 2023 |
| Current end date | Sep 14, 2028 |
| Potential end date | Sep 14, 2028 |
| Latest award activity | Mar 13, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 13, 2026 | P00016 | $5.7K | VAULT D (B48) RM240 RENOVATION THIS MODIFICATION IS TO REPAIR THE FAN COIL UNIT (FCU-1) IN THE VAULT. |
| Mar 10, 2026 | P00015 | $8.0K | VAULT D (B48) RM240 RENOVATION THIS MODIFICATION IS FOR A BACKDRAFT DAMPER INSTALLATION TO ADDRESS PRESSURIZATION IN THE VAULT. |
| Jul 23, 2025 | P00014 | $130.9K | VAULT D (B48) RM240 RENOVATION THIS MODIFICATION IS TO RESURFACE THE FLOOR IN THE LOADING DOCK AREA. |
| Jun 24, 2025 | P00013 | $16.1K | VAULT D (B48) RM240 RENOVATION THIS MODIFICATION IS FOR HEAT DETECTORS TO BE INSTALLED IN THE VAULT FOR THE FIRE DETECTION SYSTEM. |
| May 12, 2025 | P00012 | $-4.5K | THE PURPOSE OF THIS MODIFICATION IS TO DE-OBLIGATE THE REMAINING FUNDING ON THIS ORDER TO ALLOW FOR THE REMAINING FUNDING TO BE INCLUDED ON THE DUPLICATE TASK ORDER WITH THE UPDATED VENDOR IN ACCORDANCE WITH THE NOVATION AGREEMENT. |
| Mar 26, 2025 | P00011 | $4.5K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 13 FROM THE RIFF GROUP FOR LOCKOUT TAGOUT PLACARDS. |
| Feb 13, 2025 | P00010 | $33.2K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 12 FROM THE RIFF GROUP FOR UNEXPECTED REPAIRS TO DOOR FRAME AND CAGING PLUS REINFORCEMENTS. |
| Nov 21, 2024 | P00009 | $65.5K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 11 FROM THE RIFF GROUP FOR EPOXY COATING IN HERITAGE ASSET SPACE AND EMERGENCY LIGHTING. |
| Aug 22, 2024 | P00008 | $56.3K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 10 FROM THE RIFF GROUP. |
| Aug 14, 2024 | P00007 | $255.7K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 9 FROM THE RIFF GROUP. |
| Jul 18, 2024 | P00006 | $14.5K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 8 FROM THE RIFF GROUP. |
| Jul 2, 2024 | P00005 | $179.5K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 7 FROM THE RIFF GROUP. |
| May 23, 2024 | P00004 | $46.5K | THIS MODIFICATION IS TO INCORPORATE CHANGE ORDER REQUEST # 6 FROM THE RIFF GROUP. |
| Mar 27, 2024 | P00003 | $67.8K | MODIFICATION 2031JG23D00020-2031JG23F00373 P00003- D-VAULT -RM 240 480/240 PANEL AND NEUTRAL |
| Mar 20, 2024 | P00002 | $81.1K | MODIFICATION 2031JG23D00020-2031JG23F00373 P00002- REPAIRS FOR BUILT-UP EPOXY FLOORING IN B48D + B48E AND RM 240 SMOKE DETECTION/HUMP IN FLOOR/ELECTRICAL DEMOLITION. |
| Feb 29, 2024 | P00001 | $181.4K | MODIFICATION 2031JG23D00020-2031JG23F00373 P00001- FIRE PANEL DISABLE/ENABLE AND ADDING SECURITY, ACCESS CONTROLS, AND CAMERAS. |
| Sep 27, 2023 | 0 | $2.0M | TASK ORDER2031JG23D00020-2031JG23F00373 VAULT D (B48) RM240 RENOVATION |
Estimated positioning window
Sep 14, 2027 – Mar 14, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-09-14 (683 days from calculation)
- +25 points
- 59 historical awards in this buyer and category group
- +15 points
- 17 recorded award transactions
- +10 points
- Latest award action: 2026-03-13
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.