Department of the Treasury$2.4K obligationsEnds Dec 11, 2025
Federal contract award
2031ZA17C00174
DESIGN, FABRICATION, ASSEMBLY, INTEGRATION, DELIVERY, INSTALLATION, SET-UP, TESTING AND TRAINING OF THREE (3) NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES WITH OPTION FOR THREE ADDITIONAL NS-LEPE.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of the Treasury |
| Office | OFFICE OF THE CHIEF PROCUREMENT OFFICER |
| NAICS | 333244 |
| PSC | 3610 — Printing, Duplicating, and Bookbinding Equipment |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $128.5M |
| Current contract value | $128.5M |
| Potential contract value / ceiling | $147.7M |
| Start date | Sep 28, 2017 |
| Current end date | Nov 29, 2027 |
| Potential end date | Nov 29, 2027 |
| Latest award activity | May 28, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 26 of 26 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| May 28, 2026 | P00025 | $0 | NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES. MOD P00025 - THE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE CLAUSE 52.222-90. |
| Apr 13, 2026 | P00024 | $0 | ESIGN, FABRICATION, ASSEMBLY, INTEGRATION, DELIVERY, INSTALLATION, SET-UP, TESTING AND TRAINING OF NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES. MOD P00024 - MODIFICATION TO UPDATE ATTACHMENT C - STATEMENT OF NEED |
| Nov 19, 2025 | P00023 | $2.6M | DESIGN, FABRICATION, ASSEMBLY, INTEGRATION, DELIVERY, INSTALLATION, SET-UP, TESTING AND TRAINING OF NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES. MOD P00023 - MODIFICATION TO ADD CLIN 0293 FOR TARIFF COST FOR NS |
| Nov 6, 2025 | P00022 | $698.6K | DESIGN, FABRICATION, ASSEMBLY, INTEGRATION, DELIVERY, INSTALLATION, SET-UP, TESTING AND TRAINING OF NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES. MOD P00022 - MODIFICATION TO EXERCISE OPTION CLINS 0118 - 0292. |
| Oct 29, 2025 | P00021 | $0 | NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES. MOD P00021 - MODIFICATION TO ADD INDIVIDUAL OPTION LINES FOR SPARE PARTS AND REMOVE CURRENT OPTION CLIN FOR SPARE PARTS |
| Sep 16, 2025 | P00020 | $2.6M | MODIFICATION TO ADD CLIN 0117 FOR IMPOSED TARIFFS |
| Jul 24, 2025 | P00019 | $0 | NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT - MOD P00019 REVISES THE OPTION TIME DATES FOR CLINS 0020, 0027, 0034, 0045, 0057, AND 0071 |
| Mar 19, 2025 | P00018 | $0 | THE PURPOSE OF MODIFICATION P00018 IS TO EXTEND THE WARRANTY PERIOD FOR THE NS-LEPE SYSTEM #1 TO 01 JULY 2026. |
| Feb 14, 2025 | P00017 | $0 | MODIFICATION TO ADD FAR CLAUSE 52.229-3 |
| Dec 19, 2024 | P00016 | $240.1K | MODIFICATION TO ADD CLINS 0109-0116. |
| Jul 26, 2024 | P00015 | $0 | ADMINISTRATIVE MODIFICATION TO REVISE THE QUANTITY AND UNIT PRICE FOR CLINS 0065 AND 0076. |
| Nov 30, 2023 | P00014 | $0 | EXTEND PERIOD OF PERFORMANCE. |
| Sep 15, 2023 | P00013 | $39.6M | EXERCISE OPTION ON OPTIONAL 5TH AND 6TH MACHINES |
| Aug 30, 2023 | P00012 | $23.9K | TPIS-L UPGRADES |
| Aug 29, 2023 | P00011 | $106.8K | AFX II TRAINING |
| Nov 17, 2022 | P00010 | $19.2K | SOFTWARE UPDATE |
| May 27, 2022 | P00009 | $18.5M | MOD TO ADD FUNDING |
| Apr 29, 2022 | P00008 | $-18.5M | ADMIN MOD |
| Mar 21, 2022 | P00007 | $0 | ADMIN MOD |
| Jan 14, 2022 | P00006 | $593.6K | DEMONSTRATION MATERIALS |
| Sep 30, 2021 | P00005 | $23.4M | DIRIS NS-LEPE |
| Sep 15, 2020 | P00004 | $554.0K | NS-LEPE |
| Jun 11, 2019 | P00003 | $324.8K | DEMONSTRATION MATERIAL |
| May 9, 2018 | P00002 | $349.8K | OPTION FOR INCREASED QUANTITY SEPARATELY PRICED LINE ITEM DEMONSTRATION MATERIAL. |
| Feb 27, 2018 | P00001 | $0 | NBX CHANGE |
| Sep 27, 2017 | 0 | $57.4M | DESIGN, FABRICATION, ASSEMBLY, INTEGRATION, DELIVERY, INSTALLATION, SET-UP, TESTING AND TRAINING OF THREE (3) NON-SEQUENTIAL LARGE EXAMINING AND PRINTING EQUIPMENT (NS-LEPE) MACHINES WITH OPTION FOR THREE ADDITIONAL NS-LEPE. |
Estimated positioning window
Nov 29, 2026 – May 29, 2027
Recompete signal: . Rule-based research score; positioning dates are estimates.
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-11-29 (393 days from calculation)
- +25 points
- 143 historical awards in this buyer and category group
- +15 points
- 26 recorded award transactions
- +10 points
- Latest award action: 2026-05-28
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.