Federal contract award

2031ZA25F00167

THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Treasury
OfficeOFFICE OF THE CHIEF PROCUREMENT OFFICER
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2EC — REPAIR OR ALTERATION OF PRODUCTION BUILDINGS
Parent award / vehicle2031ZA24D00006
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$5.9M
Current contract value$5.9M
Potential contract value / ceiling$5.9M
Start dateJan 22, 2025
Current end dateNov 13, 2026
Potential end dateNov 13, 2026
Latest award activitySep 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 11, 2026P00007$146.6KSITE PREPARATION FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY. MOD P00007 - INCORPORATED THE FOLLOWING ADDITIONAL WORK WITHIN SCOPE: COMPRESSED AIR CONDENSATE DRAIN AND SCREEN PRESS CONTROLS INTEGRATION.
Mar 17, 2026P00006$0DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX. MOD P00006 - INCORPORATED THE MONTHLY WORKFORCE REPORT IN ACCORDANCE WI
Feb 25, 2026P00005$402.8KDESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX. MOD P00005 - INCORPORATED ADDITIONAL WORK WITHIN SCOPE.
Jan 12, 2026P00004$0DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX. MOD P00004 - EXTENDS THE CONTRACT COMPLETION DATE TO APRIL 1, 2026.
Oct 6, 2025P00003$0EXTENDED THE CONTRACT COMPLETION DATE TO NOVEMBER 28, 2025.
Sep 11, 2025P00002$1.1MINCORPORATED ADDITIONAL WORK WITHIN SCOPE.
Jan 8, 2025P00001$0THE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.
Dec 19, 20240$4.3MTHE CONTRACTOR SHALL PROVIDE ALL DESIGN, LABOR, TOOLS, EQUIPMENT, AND MATERIALS TO PREPARE THE SITES FOR OFFSET, FOIL, AND SCREEN PRESSES FOR THE THE WESTERN CURRENCY FACILITY (WCF) IN FORT WORTH, TX.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2026-11-13 (12 days from calculation)
+35 points
3 historical awards in this buyer and category group
+10 points
8 recorded award transactions
+10 points
Latest award action: 2026-09-11
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.