Federal contract award

2032H823F00211

THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of the Treasury
OfficeOPERATION SERVICES
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2JZ — REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS
Parent award / vehicle2032H823A00010
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$2.5M
Current contract value$2.6M
Potential contract value / ceiling$2.6M
Start dateSep 29, 2023
Current end dateMar 31, 2025
Potential end dateMar 31, 2025
Latest award activityOct 23, 2025
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Oct 23, 2025P00005$-56.6KREPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS (PDUS) AND INSTALL NEW PDUS AND REMOTE POWER PANELS; AND UPDATE THE EXISTING SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM AT IRS ECC MARTINSBURG WV. P00004 IS TO UPDATE THE FPDS DESCRIPTION FIELD.
Apr 23, 2025P00004$0REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS (PDUS) AND INSTALL NEW PDUS AND REMOTE POWER PANELS; AND UPDATE THE EXISTING SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM AT IRS ECC MARTINSBURG WV. P00004 IS TO UPDATE THE FPDS DESCRIPTION FIELD.
Mar 4, 2025P00003$0THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL
Jan 31, 2025P00002$0THIS PROJECT IS TO REPLACE THE OLD EXISTING POWER DISTRIBUTION UNITS PDUS AND REMOVE UNNEEDED CABLE-WHIPS INSTALL NEW PDUS AND RPPS COMPLETE WITH SEISMIC STANDS AND ASSOCIATED RAISED FLOOR SYSTEM MODIFICATIONS AND GROUNDING INSTALL NECESSARY UNDER-FL

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.