Federal contract award
28321323FA0010199
REGION 5 PS5 INSTALLATION FOR 10 DESIGN BUILD SITES TO INCLUDE DESIGN, SECURITY EQUIPMENT UPGRADES FOR THE OFFICE'S VIDEO SURVEILLANCE SYSTEM (VSS), INTRUSION DETECTION SYSTEM (IDS), DURESS ALARMS AND PHYSICAL ACCESS CONTROL SYSTEM (PACS).
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Social Security Administration |
| Office | SSA OFC OF ACQUISITION GRANTS |
| NAICS | 541330 — Engineering Services |
| PSC | N063 — Installation of Equipment: Alarm, Signal, and Security Detection Systems |
| Parent award / vehicle | 28321320A00040037 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.8M |
| Current contract value | $1.8M |
| Potential contract value / ceiling | $1.8M |
| Start date | Sep 25, 2023 |
| Current end date | Sep 30, 2025 |
| Potential end date | Sep 30, 2025 |
| Latest award activity | Mar 26, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Mar 26, 2026 | P00004 | $-28.3K | REGION 5 PS5 INSTALLATION FOR 10 DESIGN BUILD SITES TO INCLUDE DESIGN, SECURITY EQUIPMENT UPGRADES FOR THE OFFICE'S VIDEO SURVEILLANCE SYSTEM (VSS), INTRUSION DETECTION SYSTEM (IDS), DURESS ALARMS AND PHYSICAL ACCESS CONTROL SYSTEM (PACS). THE P |
| Aug 19, 2025 | P00003 | $0 | REGION 5 PS5 INSTALLATION FOR 10 DESIGN BUILD SITES TO INCLUDE DESIGN, SECURITY EQUIPMENT UPGRADES FOR THE OFFICE'S VIDEO SURVEILLANCE SYSTEM (VSS), INTRUSION DETECTION SYSTEM (IDS), DURESS ALARMS AND PHYSICAL ACCESS CONTROL SYSTEM (PACS). THE P |
| Jan 24, 2025 | P00002 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PERIOD OF PERFORMANCE END DATE FROM 12/31/2024 TO 04/30/2025 FOR REGION 5 PS5 INSTALLATION FOR 10 DESIGN BUILD SITES. |
| Aug 29, 2024 | P00001 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND PERIOD OF PERFORMANCE FOR REGION FIVE (5) SITES DESIGN BUILD. DUE TO ONGOING DELAYS IN THE RENOVATION AT THE GRAND RAPIDS, MI OFFICE THE PS5 INSTALLATION WILL BE DELAYED. THE CALL ORDER EXTENDS THE PERIOD |
| Sep 25, 2023 | 0 | $1.8M | REGION 5 PS5 INSTALLATION FOR 10 DESIGN BUILD SITES TO INCLUDE DESIGN, SECURITY EQUIPMENT UPGRADES FOR THE OFFICE'S VIDEO SURVEILLANCE SYSTEM (VSS), INTRUSION DETECTION SYSTEM (IDS), DURESS ALARMS AND PHYSICAL ACCESS CONTROL SYSTEM (PACS). |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.