Federal contract award

33330220CF0010073

TO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencySmithsonian Institution
OfficeSMITHSONIAN INSTITUTION
NAICS541310 — Architectural Services
PSCC1JA — ARCHITECT AND ENGINEERING- CONSTRUCTION: MUSEUMS AND EXHIBITION BUILDINGS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$47.4M
Current contract value$47.5M
Potential contract value / ceiling$47.5M
Start dateAug 17, 2020
Current end dateMar 8, 2028
Potential end dateMar 8, 2028
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026P00040$0TO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
May 14, 2026P00038$22.1KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Apr 7, 2026P00036$0TO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Apr 7, 2026P00037$36.2KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Jan 7, 2026P00035$43.6KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Aug 21, 2025P00031$7.3KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Aug 21, 2025P00032$0TO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
May 20, 2025P00030$5.0KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
May 6, 2025P00029$0TO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Mar 3, 2025P00028$6.0KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Feb 25, 2025P00027$59.1KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Oct 30, 2024P00026$18.2KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Oct 23, 2024P00025$86.7KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI
Oct 21, 2024P00024$40.0KTO PROVIDE DESIGN SERVICES FOR SIB AND AIB FOR THEIR COMPLETE REHABILITATION. THE PROJECT INCLUDES HISTORIC PRESERVATION, TOTAL REPLACEMENT OF ALL BUILDING SYSTEMS, HAZMAT ABATEMENT, BLAST AND CBR MITIGATION, ENVELOPE IMPROVEMENTS INCLUDING REMEDIATI

Estimated positioning window

Mar 8, 2027 – Sep 8, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-03-08 (500 days from calculation)
+25 points
167 historical awards in this buyer and category group
+15 points
14 recorded award transactions
+10 points
Latest award action: 2026-05-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.