Federal contract award
36C10F19C3371
CONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) |
| NAICS | 237990 — Other Heavy and Civil Engineering Construction |
| PSC | Y1PC — CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND) |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $68.6M |
| Current contract value | $68.6M |
| Potential contract value / ceiling | $68.6M |
| Start date | Oct 29, 2018 |
| Current end date | Feb 1, 2026 |
| Potential end date | Feb 1, 2026 |
| Latest award activity | Sep 26, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 116 of 116 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 26, 2025 | P00120 | $17.1K | UNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B |
| Aug 12, 2025 | P00119 | $6.5M | UNFORESEEN SITE CONDITION - CAVE REDESIGN, COMPENSATION ASSOCIATED WITH LOST TIME AND OVERHEAD |
| Jul 21, 2025 | P00118 | $36.3K | WELL PUMP SHED, CHAIN LINK FENCE DELETION AND IT DEFINITIZATION |
| Apr 14, 2025 | P00116 | $3.2K | UNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B |
| Nov 20, 2024 | P00110 | $5.9M | UNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B |
| Oct 18, 2024 | P00102 | $0 | SEVERE WEATHER TIME EXTENSION |
| Sep 27, 2024 | P00111 | $3.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 27, 2024 | P00113 | $5.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 27, 2024 | P00114 | $2.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 26, 2024 | P00109 | $3.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 5, 2024 | P00108 | $25.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 29, 2024 | P00107 | $5.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 14, 2024 | P00106 | $8.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 17, 2024 | P00105 | $104.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 8, 2024 | P00104 | $4.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 22, 2024 | P00103 | $8.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 16, 2024 | P00101 | $30.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 25, 2024 | P00099 | $12.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 25, 2024 | P00100 | $28.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 10, 2024 | P00097 | $3.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 10, 2024 | P00098 | $93.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 13, 2023 | P00096 | $209 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 28, 2023 | P00087 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 28, 2023 | P00088 | $397.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 28, 2023 | P00093 | $2.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 28, 2023 | P00094 | $41.5K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 27, 2023 | P00092 | $11.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 2, 2023 | P00091 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 2, 2023 | P0091A | $5.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 12, 2023 | P00089 | $22.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 5, 2023 | P00090 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION - PO CHANGE |
| May 11, 2023 | P00086 | $2.2M | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 9, 2023 | P00085 | $249.8K | DEFINITIZATION OF P00065 GEOWEB INSTALLATION |
| Mar 21, 2023 | P00084 | $83.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 2, 2023 | P00081 | $370.7K | CONSTRUCT GABION WALL AT RETENTION POND 8 |
| Jan 24, 2023 | P00080 | $216.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 13, 2023 | P00083 | $33.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 28, 2022 | P00082 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 20, 2022 | P00079 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 15, 2022 | P00078 | $22.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 29, 2022 | P00077 | $207.1K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 16, 2022 | P00075 | $23.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 16, 2022 | P00076 | $51.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 7, 2022 | P00074 | $10.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 1, 2022 | P00073 | $107 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 14, 2022 | P00069 | $169.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 14, 2022 | P00071 | $4.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 13, 2022 | P00072 | $32.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 9, 2022 | P00070 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 13, 2022 | P00068 | $9.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 2, 2022 | P00067 | $35.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Apr 26, 2022 | P00066 | $13.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 21, 2022 | P00065 | $489.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 2, 2022 | P00063 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 11, 2022 | P00064 | $5.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 31, 2022 | P00062 | $22.1K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 27, 2021 | P00061 | $26.1K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 30, 2021 | P00056 | $4.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 30, 2021 | P00060 | $6.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 26, 2021 | P00035 | $12.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 15, 2021 | P00059 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 6, 2021 | P00058 | $28.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 1, 2021 | P00057 | $4.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 30, 2021 | P00055 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 5, 2021 | P00053 | $100.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 23, 2021 | P00054 | $11.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 19, 2021 | P00051 | $1.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 14, 2021 | P00052 | $35.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 26, 2021 | P00050 | $24.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Apr 26, 2021 | P00049 | $675 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 11, 2021 | P00038 | $117.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 11, 2021 | P00048 | $10.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 25, 2021 | P00047 | $39.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 29, 2021 | P00045 | $4.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 29, 2021 | P00046 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 28, 2021 | P00044 | $12.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 25, 2021 | P00043 | $23.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 14, 2021 | P00042 | $7.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 5, 2021 | P00041 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 23, 2020 | P00040 | $6.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 21, 2020 | P00039 | $4.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 20, 2020 | P00037 | $10.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 16, 2020 | P00036 | $11.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 11, 2020 | P00034 | $9.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 10, 2020 | P00033 | $40.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 4, 2020 | P00032 | $41.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 3, 2020 | P00030 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Aug 28, 2020 | P00031 | $6.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 10, 2020 | P00029 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 8, 2020 | P00027 | $8.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jun 22, 2020 | P00025 | $230.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| May 5, 2020 | P00024 | $9.5K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Mar 27, 2020 | P00026 | $97.4K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 25, 2020 | P00023 | $18.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 21, 2020 | P00022 | $26.8K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Feb 4, 2020 | P00021 | $30.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 30, 2020 | P00019 | $30.1K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 30, 2020 | P00020 | $18.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jan 10, 2020 | P00018 | $30.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 23, 2019 | P00016 | $30.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 23, 2019 | P00017 | $6.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Dec 19, 2019 | P00015 | $32.6K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 26, 2019 | P00014 | $83.0K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 21, 2019 | P00013 | $20.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Nov 4, 2019 | P00012 | $19.5K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 31, 2019 | P00011 | $73.9K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 28, 2019 | P00010 | $64.3K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Oct 18, 2019 | P00009 | $12.2K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 26, 2019 | P00008 | $32.7K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 23, 2019 | P00007 | $19.5K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Sep 4, 2019 | P00006 | $46.1K | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 30, 2019 | P00004 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION |
| Jul 25, 2019 | P00005 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY |
| Apr 23, 2019 | P00003 | $15.0K | THIS CO IS FOR THE CONTRACTOR TO HIRE THE SERVICES OF A SUBJECT MATTER EXPERT TO INVESTIGATE, REPORT AND REMEDIATE THE SINKHOLE FOUND AT GRADE LEVEL IN THE MOROVIS NATIONAL CEMETERY PROJECT MAIN ENTRANCE. |
| Nov 6, 2018 | P00001 | $0 | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF |
| Oct 29, 2018 | 0 | $49.5M | CONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF |