Federal contract award

36C10F19C3371

CONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Veterans Affairs
OfficeOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)
NAICS237990 — Other Heavy and Civil Engineering Construction
PSCY1PC — CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$68.6M
Current contract value$68.6M
Potential contract value / ceiling$68.6M
Start dateOct 29, 2018
Current end dateFeb 1, 2026
Potential end dateFeb 1, 2026
Latest award activitySep 26, 2025
Source loadedAug 15, 2026

Funding and modification history

Showing the latest 116 of 116 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 26, 2025P00120$17.1KUNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B
Aug 12, 2025P00119$6.5MUNFORESEEN SITE CONDITION - CAVE REDESIGN, COMPENSATION ASSOCIATED WITH LOST TIME AND OVERHEAD
Jul 21, 2025P00118$36.3KWELL PUMP SHED, CHAIN LINK FENCE DELETION AND IT DEFINITIZATION
Apr 14, 2025P00116$3.2KUNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B
Nov 20, 2024P00110$5.9MUNFORESEEN SITE CONDITION - SUBSURFACE ROCK REMOVAL PH 1A & 1B
Oct 18, 2024P00102$0SEVERE WEATHER TIME EXTENSION
Sep 27, 2024P00111$3.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 27, 2024P00113$5.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 27, 2024P00114$2.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 26, 2024P00109$3.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 5, 2024P00108$25.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 29, 2024P00107$5.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 14, 2024P00106$8.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 17, 2024P00105$104.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 8, 2024P00104$4.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 22, 2024P00103$8.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 16, 2024P00101$30.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 25, 2024P00099$12.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 25, 2024P00100$28.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 10, 2024P00097$3.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 10, 2024P00098$93.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 13, 2023P00096$209CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 28, 2023P00087$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 28, 2023P00088$397.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 28, 2023P00093$2.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 28, 2023P00094$41.5KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 27, 2023P00092$11.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 2, 2023P00091$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 2, 2023P0091A$5.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 12, 2023P00089$22.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 5, 2023P00090$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION - PO CHANGE
May 11, 2023P00086$2.2MCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 9, 2023P00085$249.8KDEFINITIZATION OF P00065 GEOWEB INSTALLATION
Mar 21, 2023P00084$83.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 2, 2023P00081$370.7KCONSTRUCT GABION WALL AT RETENTION POND 8
Jan 24, 2023P00080$216.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 13, 2023P00083$33.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 28, 2022P00082$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 20, 2022P00079$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 15, 2022P00078$22.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 29, 2022P00077$207.1KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 16, 2022P00075$23.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 16, 2022P00076$51.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 7, 2022P00074$10.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 1, 2022P00073$107CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 14, 2022P00069$169.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 14, 2022P00071$4.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 13, 2022P00072$32.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 9, 2022P00070$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 13, 2022P00068$9.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 2, 2022P00067$35.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Apr 26, 2022P00066$13.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 21, 2022P00065$489.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 2, 2022P00063$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 11, 2022P00064$5.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 31, 2022P00062$22.1KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 27, 2021P00061$26.1KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 30, 2021P00056$4.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 30, 2021P00060$6.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 26, 2021P00035$12.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 15, 2021P00059$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 6, 2021P00058$28.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 1, 2021P00057$4.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 30, 2021P00055$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 5, 2021P00053$100.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 23, 2021P00054$11.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 19, 2021P00051$1.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 14, 2021P00052$35.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 26, 2021P00050$24.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Apr 26, 2021P00049$675CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 11, 2021P00038$117.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 11, 2021P00048$10.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 25, 2021P00047$39.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 29, 2021P00045$4.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 29, 2021P00046$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 28, 2021P00044$12.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 25, 2021P00043$23.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 14, 2021P00042$7.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 5, 2021P00041$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 23, 2020P00040$6.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 21, 2020P00039$4.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 20, 2020P00037$10.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 16, 2020P00036$11.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 11, 2020P00034$9.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 10, 2020P00033$40.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 4, 2020P00032$41.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 3, 2020P00030$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Aug 28, 2020P00031$6.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 10, 2020P00029$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 8, 2020P00027$8.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jun 22, 2020P00025$230.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
May 5, 2020P00024$9.5KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Mar 27, 2020P00026$97.4KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 25, 2020P00023$18.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 21, 2020P00022$26.8KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Feb 4, 2020P00021$30.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 30, 2020P00019$30.1KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 30, 2020P00020$18.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jan 10, 2020P00018$30.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 23, 2019P00016$30.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 23, 2019P00017$6.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Dec 19, 2019P00015$32.6KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 26, 2019P00014$83.0KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 21, 2019P00013$20.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Nov 4, 2019P00012$19.5KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 31, 2019P00011$73.9KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 28, 2019P00010$64.3KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Oct 18, 2019P00009$12.2KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 26, 2019P00008$32.7KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 23, 2019P00007$19.5KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Sep 4, 2019P00006$46.1KCONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 30, 2019P00004$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY-ADMINISTRATIVE MODIFICATION
Jul 25, 2019P00005$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY
Apr 23, 2019P00003$15.0KTHIS CO IS FOR THE CONTRACTOR TO HIRE THE SERVICES OF A SUBJECT MATTER EXPERT TO INVESTIGATE, REPORT AND REMEDIATE THE SINKHOLE FOUND AT GRADE LEVEL IN THE MOROVIS NATIONAL CEMETERY PROJECT MAIN ENTRANCE.
Nov 6, 2018P00001$0CONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF
Oct 29, 20180$49.5MCONSTRUCTION OF MOROVIS NATIONAL CEMETERY IGF::OT::IGF

Research next steps

  1. Check the stated set-aside against the solicitation and current certifications.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.