Federal contract award

36C26324N0770

656-19-309 CONSTRUCT/REPLACE B50 MEP SYSTEMS BASEMENT-STC

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Veterans Affairs
OfficeNETWORK CONTRACT OFFICE 23 (36C263)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1DA — CONSTRUCTION OF HOSPITALS AND INFIRMARIES
Parent award / vehicle36C26319D0094
Set-asideSERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Pricing typeFIRM FIXED PRICE
Obligations$6.1M
Current contract value$6.1M
Potential contract value / ceiling$6.1M
Start dateAug 20, 2024
Current end dateNov 2, 2026
Potential end dateNov 2, 2026
Latest award activitySep 1, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 1, 2026P00005$1.0MMODIFICATION 005 FOR CHANGES TO ASI#6 DRAWINGS AND SPECS AND THE OPERATIONAL REQUIREMENTS OF BUILDING 50. MODIFICATION ALSO EXTENDS THE PERIOD OF PERFORMANCE FROM JULY 1, 2026, TO NOVEMBER 2, 2026.
May 28, 2026P00004$38.7KMODIFICATION 3 DUE TO NUMEROUS CONSTRUCTION DRAWING AND DESIGN ERRORS, IN REFERENCE TO REQUEST FOR INFORMATION (RFL'S) 43,44,45, AND 46. THE PERIOD OF PERFORMANCE WILL ADD 150 CALENDAR DAYS, CHANGING FROM FEBRUARY 1, 2026, TO JULY 1, 2026.
Apr 13, 2026P00003$63.9KMODIFICATION 3 DUE TO NUMEROUS CONSTRUCTION DRAWING AND DESIGN ERRORS, IN REFERENCE TO REQUEST FOR INFORMATION (RFL'S) 43,44,45, AND 46. THE PERIOD OF PERFORMANCE WILL ADD 150 CALENDAR DAYS, CHANGING FROM FEBRUARY 1, 2026, TO JULY 1, 2026.
Dec 9, 2025P00002$0656-19-309 CONSTRUCT/REPLACE B50 MEP SYSTEMS BASEMENT-STC MODIFICATION 2 IS A NO COST TIME EXTENSION OF 279 CALENDAR DAYS CHANGING THE CONTRACT COMPLETION DATE FROM JULY 29, 2025, TO FEBRUARY 1, 2026.
Sep 26, 2025P00001$-18.7K656-19-309 CONSTRUCT/REPLACE B50 MEP SYSTEMS BASEMENT-STC MODIFICATION 1 WILL INCORPORATE PROPOSAL RFP 01, RFP 03, RFP 04, ASI 04 WHICH INCLUDES BOTH CREDIT AND ADDED COST ITEMS TO THE CONTRACT VALUE.
Aug 21, 20240$5.0M656-19-309 CONSTRUCT/REPLACE B50 MEP SYSTEMS BASEMENT-STC

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-11-02 (1 days from calculation)
+35 points
17 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-09-01
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.