Federal contract award

36C77621C0114

THE CONTRACTOR IS TO PROVIDE DESIGN AND CONSTRUCTION SERVICES TO COMPLETE THE FRESNO EHRM INFRASTRUCTURE UPGRADES PROJECT IN ACCORDANCE WITH THE EHRM NARRATIVE, SPECIFICATIONS, AND ALL APPLICABLE ATTACHMENTS.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Veterans Affairs
OfficePCAC (36C776)
NAICS236220 — Commercial and Institutional Building Construction
PSCY1BG — CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES
Parent award / vehicleNot reported
Set-asideSERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Pricing typeFIRM FIXED PRICE
Obligations$15.8M
Current contract value$15.8M
Potential contract value / ceiling$15.8M
Start dateSep 30, 2021
Current end dateDec 28, 2026
Potential end dateDec 28, 2026
Latest award activitySep 1, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Sep 1, 2026P00015$550.0KTHE PURPOSE OF THIS MOD IS TO MEMORIALIZE THE CO DIRECTIVE TO DEMOLISH & INFILL THE DUMBWAITER SHAFT IN BUILDING 1, WITH A CEILING PRICE OF $555,000.00.
Jun 23, 2026P00014$0THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO EXTEND THE CONTRACT COMPLETION DATE 180 CALENDAR DAYS
Jun 15, 2026P00013$19.1KTHE PURPOSE OF THIS MODIFICATION IS TO INCORPORATE THE BUILDING 28, ROOM 1E17 FLOOR REPAIR, ELECTRICAL PANELS CHANGE, AND TO ADD NEW CLAUSE 52.222-90 (EO 14398) .
Mar 23, 2026P00012$0THE PURPOSE OF THIS MODIFICATION IS TO UNILATERALLY EXTEND THE CONTRACT COMPLETION DATE TO 7-1-26
Jan 2, 2026P00011$0THE PURPOSE OF THIS MODIFICATION IS TO ADD A PNEUMATIC TUBE STATION AND RELOCATE A PNEUMATIC TUBE STATION.
Nov 25, 2025P00010$22.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD A PNEUMATIC TUBE STATION AND RELOCATE A PNEUMATIC TUBE STATION.
Oct 31, 2025P00009$27.9KTHE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE MODIFICATION P00007 AND RFP 04 RELOCATION CREDIT. THEN ADDITIONAL ADD FUNDS FOR PNEUMATIC TUBE.
Aug 11, 2025P00008$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO CHANGE THE PO# IN MOD 07 TO PO# 570C14034.
Jun 13, 2025P00007$65.5KTHE PURPOSE OF THIS MODIFICATION IS TO FORMALIZE THE CONTRACTING OFFICER DIRECTIVE 01, ISSUED JUNE 6, 2025.
Mar 25, 2025P00006$1.2MCHANGES PER 95% DESIGN REVIEW IN ACCORDANCE WITH RFP 003 SECTION 2.A. FIBER PATHWAY REPAIR.
Feb 26, 2025P00005$180.7KDESIGN AND BUILDOUT OF A NEW TR (TELECOM ROOM) WITHIN THE BASEMENT OF BUILDING 32, LOCATED ON THE CAMPUS OF THE VACCHCS
Nov 18, 2024P00004$0UNILATERAL TIME EXTENSION WHILE REQUIRED CHANGES ARE NEGOTIATED.
Aug 9, 2024P00003$097-DAY TIME EXTENSION AT NO COST.
Mar 22, 2023P00002$4.2MTHE CONTRACTOR IS TO PROVIDE DESIGN AND CONSTRUCTION SERVICES TO COMPLETE THE FRESNO EHRM INFRASTRUCTURE UPGRADES PROJECT IN ACCORDANCE WITH THE EHRM NARRATIVE, SPECIFICATIONS, AND ALL APPLICABLE ATTACHMENTS.
Sep 30, 20210$9.6MTHE CONTRACTOR IS TO PROVIDE DESIGN AND CONSTRUCTION SERVICES TO COMPLETE THE FRESNO EHRM INFRASTRUCTURE UPGRADES PROJECT IN ACCORDANCE WITH THE EHRM NARRATIVE, SPECIFICATIONS, AND ALL APPLICABLE ATTACHMENTS.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-12-28 (57 days from calculation)
+35 points
18 historical awards in this buyer and category group
+15 points
15 recorded award transactions
+10 points
Latest award action: 2026-09-01
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Bailey E DonatoContract Specialistbailey.donato@va.govSourceAug 3, 2021
Bailey E DonatoContract Specialistbailey.donato@va.govSourceJul 29, 2021
Bailey E DonatoContract Specialistbailey.donato@va.govSourceJul 8, 2021
bailey.donato@va.govBailey Donatobailey.donato@va.gov
216-447-8300
SourceMay 10, 2021

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.