Federal contract award
36C77624C0199
THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE, INSTALL, AND REPLACE EXISTING FIBER CABLES, COPPER CABLES, AND CONDUITS ON SOUTH COLUMBIAN WAY, CONNECTING TO SEATTLE VAMC, IN ACCORDANCE WITH ALL SPECS AND SUPPORTING DOCS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Veterans Affairs |
| Office | PCAC (36C776) |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1DZ — CONSTRUCTION OF OTHER HOSPITAL BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $3.1M |
| Current contract value | $3.1M |
| Potential contract value / ceiling | $3.1M |
| Start date | Sep 18, 2024 |
| Current end date | Jun 3, 2026 |
| Potential end date | Jun 3, 2026 |
| Latest award activity | Nov 12, 2025 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Nov 12, 2025 | P00003 | $0 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE, INSTALL, AND REPLACE EXISTING FIBER CABLES, COPPER CABLES, AND CONDUITS ON SOUTH COLUMBIAN WAY, CONNECTING TO SEATTLE VAMC, IN ACCORDANCE WITH ALL SPECS AND SUPPORTING DOCS. |
| Jul 15, 2025 | P00002 | $184.1K | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE, INSTALL, AND REPLACE EXISTING FIBER CABLES, COPPER CABLES, AND CONDUITS ON SOUTH COLUMBIAN WAY, CONNECTING TO SEATTLE VAMC, IN ACCORDANCE WITH ALL SPECS AND SUPPORTING DOCS. |
| Nov 18, 2024 | P00001 | $0 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE, INSTALL, AND REPLACE EXISTING FIBER CABLES, COPPER CABLES, AND CONDUITS ON SOUTH COLUMBIAN WAY, CONNECTING TO SEATTLE VAMC, IN ACCORDANCE WITH ALL SPECS AND SUPPORTING DOCS. |
Research next steps
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.