Federal contract award
47PB0023F0042
PRE-DESIGN PHASE ARCHITECT ENGINEER SERVICES FOR THE NORTON, VT BIL LPOE
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R1 ACQ MANAGEMENT DIVISION |
| NAICS | 541310 — Architectural Services |
| PSC | C1AA — ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS |
| Parent award / vehicle | 47PC0321D0006 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.7M |
| Current contract value | $6.7M |
| Potential contract value / ceiling | $6.7M |
| Start date | Mar 20, 2023 |
| Current end date | Sep 30, 2028 |
| Potential end date | Sep 30, 2028 |
| Latest award activity | Sep 3, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 3, 2026 | PS0015 | $156.4K | THIS MOD INCLUDES THE GEOTECH REMOBILIZATION, TNC WATER SOURCE PERMIT AND ALTA NPS SURVEY FOR THE A/E DESIGN, NORTON LPOE, VERMONT. |
| Jun 24, 2026 | PA0014 | $-693.4K | THIS ADMINISTRATIVE MOD PA0014 IS THE LAST AND FINAL STEP (WHICH ALSO INCLUDES ADMINISTRATIVE MOD PA0012) IN THIS COST TRANSFER PROCESS. |
| Jun 5, 2026 | PA0013 | $0 | THIS ADMIN MOD IS TO ASSIGN THE CONTRACTING OFFICER |
| Jun 4, 2026 | PA0012 | $689.9K | THIS IS A COST TRANSFER FROM IRA TO IIJA FUNDS. |
| Feb 20, 2026 | PS0009 | $41.3K | PROVIDE SERVICES RELATED WETLAND DELINEATION AND PERMITS |
| Sep 30, 2025 | PS0008 | $1.3M | PROVIDE DESIGN SERVICES FOR THE DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENT PHASE. |
| Jun 20, 2025 | PS0007 | $522.5K | THIS MODIFICATION IS TO FINALIZE THE DESIGN OPTIONS AND CORE BLDG STANDARDS AT MORTON LPOE, VT |
| Jan 10, 2025 | PS0006 | $3.7M | PROVIDE A/E SERVICES TO PROVIDE CONCEPT, DESIGN DEVELOPMENT, AND CONSTRUCTION DOCUMENTS. |
| Oct 4, 2024 | PS0005 | $67.8K | PROVIDE FLOOD ASSESSMENT AT NORTON LPOE VT |
| Feb 5, 2024 | PS0004 | $57.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE BUDGET ALIGNMENT SERVICES FOR THE NORTON, VT LPOE AS SPECIFIED IN CLIN 0010, "ESTIMATING SERVICES." THE TOTAL AMOUNT OF THIS MODIFICATION IS $57,280.17. |
| Sep 29, 2023 | PS0003 | $100.4K | EXECUTES WITHIN SCOPE LAND SURVEY AND OTHER NO COST POP EXTENSIONS. |
| Jun 22, 2023 | PS0002 | $4.3K | WITHIN SCOPE MODIFICATION FOR ADDITIONAL TRAVEL COSTS ASSOCIATED WITH DESIGN CHARRETTE PEER REVIEW DATE CHANGE. |
| May 26, 2023 | PS0001 | $8.9K | ADD HISTORIC PRESERVATION ARCHITECT SERVICES TO THE PRE-DESIGN PHASE. |
| Mar 20, 2023 | 0 | $734.1K | PRE-DESIGN PHASE ARCHITECT ENGINEER SERVICES FOR THE NORTON, VT BIL LPOE |
Estimated positioning window
Sep 30, 2027 – Mar 30, 2028
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2028-09-30 (706 days from calculation)
- +25 points
- 6 historical awards in this buyer and category group
- +15 points
- 14 recorded award transactions
- +10 points
- Latest award action: 2026-09-03
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.