Federal contract award
47PB0023F0129
PROVIDE AE SERVICES AT HOULTON ME LPOE SPONSORED BY THE (BIL)
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R1 ACQ MANAGEMENT DIVISION |
| NAICS | 541310 — Architectural Services |
| PSC | C1AA — ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS |
| Parent award / vehicle | 47PC0321D0005 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.9M |
| Current contract value | $4.9M |
| Potential contract value / ceiling | $4.9M |
| Start date | Jun 12, 2023 |
| Current end date | Dec 17, 2027 |
| Potential end date | Dec 17, 2027 |
| Latest award activity | Aug 12, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 10 of 10 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 12, 2026 | PS0009 | $394.4K | THIS MOD ADDS GEO TECHNICAL AND VALUE ENGINEERING TO THIS CONTRACT, FOR 394357.94. |
| Jul 3, 2025 | PS0008 | $3.1M | THIS MOD PS0008 IS TO COMPLETE THE A/E DESIGN SERVICES (DD, CD AND AD) AT HOULTON LPOE, MAINE |
| May 28, 2025 | PS0007 | $270.5K | A/E DESIGN AT HOULTON LPOE, MAINE, THIS MODIFICATION INCORPORATES IRA LEC MATERIALS AND EXTENSES THE CONCEPT DESIGN SCHEDULE TO SUPPOR THE PROJECT AND PREPARATION FOR THE COMMISSIONERS PRESENTATION. |
| Mar 13, 2025 | PA0006 | $0 | THIS MODIFICATION PA0006 IS TO EXTEND THE CONTRACT COMPLETION DATE TO 6/30/2025. |
| Feb 13, 2025 | PA0005 | $0 | ADMINISTRATIVE CONTRACT MODIFICATION TO EXTEND THE CONTRACT 30 DAYS. |
| May 3, 2024 | PS0004 | $168.7K | SCOPE REVISIONS AND REQUEST FOR EQUITABLE ADJUSTMENT |
| Mar 14, 2024 | PS0003 | $78.3K | SITE HYDROLOGIC AND HYDRAULIC STUDY |
| Nov 16, 2023 | PS0002 | $13.1K | 47PB0023F0129, A/E DESIGN AT HOULTON LPOE IS HEREBY MODIFIED IN ACCORDANCE TO THE ATTACHED SCHEDULE. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT PRICE IS INCREASED BY $13,146 FROM $836,846.62 TO 849,992.62. |
| Nov 3, 2023 | PS0001 | $164.7K | 47PB0023F0129, A/E DESIGN AT HOULTON LPOE IS HEREBY MODIFIED IN ACCORDANCE TO THE ATTACHED SCHEDULE. AS A RESULT OF THIS MODIFICATION, THE TOTAL CONTRACT PRICE IS INCREASED BY $164,665 FROM $672,181.62 TO $836,846.62. |
| Jun 1, 2023 | 0 | $672.2K | PROVIDE AE SERVICES AT HOULTON ME LPOE SPONSORED BY THE (BIL) |
Estimated positioning window
Dec 17, 2026 – Jun 17, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-12-17 (411 days from calculation)
- +25 points
- 6 historical awards in this buyer and category group
- +15 points
- 10 recorded award transactions
- +10 points
- Latest award action: 2026-08-12
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.