Federal contract award
47PB0023F0183
PRE-DESIGN PHASE SERVICES FOR THE RICHFORD, VT BIL LPOE PROJECT. INCLUDES UNPRICED OPTION CLINS FOR DESIGN AND CONSTRUCTION SERVICES.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH EAST |
| NAICS | 541310 — Architectural Services |
| PSC | C1AA — ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS |
| Parent award / vehicle | 47PC0321D0002 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.3M |
| Current contract value | $6.3M |
| Potential contract value / ceiling | $6.3M |
| Start date | Jul 20, 2023 |
| Current end date | Nov 8, 2028 |
| Potential end date | Nov 8, 2028 |
| Latest award activity | Sep 4, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 16 of 16 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 11, 2026 | PS0015 | $228.6K | PROVIDE FF&E DESIGN SERVICES |
| Sep 4, 2026 | PS0014 | $55.8K | THIS MOD PS0014 FOR RFP# 12 ALTA TITLE SERVICES AND RFP# 13 GEO TECH AT T HE RICHMOND LPOE, VERMONT. |
| May 12, 2026 | PS0013 | $164.9K | MODIFICATION PS13 ISSUED FOR ADDITIONAL CONSTRUCTION PHASE DESIGN DEVELOPMENT TIME FOR THE LAND PORT OF ENTRY PROJECT IN RICHFORD, VT. |
| May 13, 2025 | PS0012 | $14.1K | THIS MODIFICATION IS TO INCORPORATE THE PBS CORE BUILDING STANDARDS AND REPLACE THE P100 FACILITIES STANDARDS. THIS CHANGE IS IN THE AMOUNT OF $14,067.50. |
| Mar 19, 2025 | PS0011 | $4.2M | ADDING ADDITIONAL SCOPE OF WORK (DESIGN THROUGH PCCS) WITH CCD EXTENSION TO ASSIST WITH LPOE PROJECT |
| Mar 17, 2025 | PS0008 | $130.0K | PROVIDE A/E SERVICES FOR WIND ENGINEERING AND VERTICAL TRANSPORTATION CONSULTING. |
| Mar 5, 2025 | PS0010 | $0 | CONCEPT DESIGN PHASE A/E SERVICES FOR THE RICHFORD, VT LPOE. $0 EXTENSION MOD TO EXTEND POP END DATE TO OCTOBER 8, 2025, AND THE ULTIMATE COMPLETION DATE TO NOVEMBER 8, 2025. |
| Feb 5, 2025 | PA0009 | $0 | THIS CONTRACT ACTION CHANGES THE CONTRACTING OFFICER |
| Oct 21, 2024 | PA0007 | $0 | THIS ADMINISTRATIVE MOD PA007 CORRECTS THE COMPLETION DATE FOR THE CONCEPT SCHEMES. |
| Oct 3, 2024 | PS0006 | $1.0M | PROVIDED THREE CONCEPT DESIGN SCHEMES FOR RICHFORD LPOE VT |
| Jun 17, 2024 | PS0005 | $84.6K | THIS MODIFICATION INCORPORATES CBP DESIGN STANDARD AND PROVIDES ADDITION AL TESTING |
| Feb 26, 2024 | PS0004 | $33.7K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE STRUCTURAL CORING, TESTING, AND PATCHING OF THE RICHFORD, VT LPOE BUILDING AS SPECIFIED IN CLIN 0014, "STRUCTURAL CORING, TESTING, & PATCHING." |
| Jan 5, 2024 | PS0003 | $81.3K | THE PURPOSE OF THIS MODIFICATION IS TO PROVIDE STRUCTURAL ANALYSIS OF THE RICHFORD, VT LPOE BUILDING WITH FOCUS ON THE CONCRETE FOUNDATION AND STRUCTURAL INTEGRITY OF THE BUILDING AS SPECIFIED IN CLIN 0013, "STRUCTURAL STUDY." |
| Oct 16, 2023 | PS0002 | $8.5K | BASED ON THE MOST RECENT ROE AND SCHEME UPDATES, THE CONTRACTOR SHALL SURVEY AN ADDITIONAL AREA, TO INCLUDE TOPOGRAPHIC AND BOUNDARY SURVEYS, AS PROPOSED ON OCTOBER 5TH, 2023. THE PERIOD OF PERFORMANCE REMAINS UNCHANGED. |
| Aug 9, 2023 | PA0001 | $0 | THIS ADMINISTRATIVE MODIFICATION CHANGES THE CONTRACTING OFFICER FROM BLAKE ROBBINS TO EMILY JACKSON. THERE IS NO ADDITIONAL COST FOR THIS CHANGE. ALL OTHER TERMS AND CONDITIONS OF THE CONTRACT REMAIN UNCHANGED. |
| Jul 19, 2023 | 0 | $448.2K | PRE-DESIGN PHASE SERVICES FOR THE RICHFORD, VT BIL LPOE PROJECT. INCLUDES UNPRICED OPTION CLINS FOR DESIGN AND CONSTRUCTION SERVICES. |
Estimated positioning window
Nov 8, 2027 – May 8, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2028-11-08 (745 days from calculation)
- +15 points
- 10 historical awards in this buyer and category group
- +15 points
- 16 recorded award transactions
- +10 points
- Latest award action: 2026-09-04
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.