Federal contract award

47PB0024F0014

A/E SERVICES FOR THE BIL BEEBE PLAIN, VT LPOE REPAIR AND ALTERATIONS PROJECT.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R1 ACQ MANAGEMENT DIVISION
NAICS541310 — Architectural Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicle47PF0023D0008
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.5M
Current contract value$1.5M
Potential contract value / ceiling$1.5M
Start dateOct 23, 2023
Current end dateSep 30, 2026
Potential end dateOct 31, 2026
Latest award activityJun 29, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 12 of 12 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 29, 2026PS0015$0MODIFICATION PS0015 FOR DESIGN SERVICES FOR THE BEEBE PLAIN LAND PORT OF ENTRY (LPOE) RENOVATIONS IN DERBY, VT
May 14, 2026PA0014$-71.9KMODIFICATION PA0014 FOR DESIGN SERVICES FOR THE BEEBE PLAIN LAND PORT OF ENTRY (LPOE) RENOVATIONS IN DERBY, VT
Apr 13, 2026PA0013$71.9KMODIFICATION PA0013 FOR DESIGN SERVICES FOR THE BEEBE PLAIN LAND PORT OF ENTRY (LPOE) RENOVATIONS IN DERBY, VT
Apr 3, 2026PS0012$0DESIGN SERVICES FOR THE BEEBE PLAIN LAND PORT OF ENTRY (LPOE) RENOVATIONS IN DERBY, VT
Oct 29, 2025PA0011$0PA0011 IS AN ADMINISTRATIVE MODIFICATION DUE TO AN ADMINISTRATIVE ERROR. THE MODIFICATION CORRECTS THE COMPLETION DATE FROM 03/31/0225 TO 03/31/2026. ALL OTHER TERMS REMAIN UNCHANGED.
Oct 23, 2025PS0010$40.6KPS0010 INCREASES THE CONTRACT VALUE BY $40,617.09 FOR ADDITIONAL WORK WHICH INCLUDES: THE ENTRY CANOPY, RECONCILIATION COSTS FOR CD AND DD, AND FALL PROTECTION. THE TASK ORDER IS ALSO EXTENDED TO 03/31/25. ALL OTHER TERMS REMAIN UNCHANGED.
Oct 14, 2025PS0009$63.6KTHIS MODIFICATION INCREASED THE COST OF THE BEEBE PLAIN LPOE DESIGN PROJECT IN BEEBE PLAIN VERMONT BY 63,580.46. THE INCREASED COST IS FOR THE GEOTHERMAL TEST. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Jun 3, 2025PS0008$44.8KPS0008 ADDS $44,804.39 TO THE BEEBE PLAIN LPOE R&A DESIGN PROJECT FOR THE REVIEW OF THE NEW CORE BUILDING STANDARDS AND ACM TESTING. THE PROJECT IS ALSO EXTENDED TO 12/31/2025. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
Feb 4, 2025PA0007$0THIS CONTRACT ACTION CHANGES IS CONTRACTING OFFICER
Jan 15, 2025PS0006$7.1KPARTNERING SESSION IN BOSTON MA.
Dec 4, 2024PS0005$53.1KPROVIDE LABOR AND MATERIALS FOR SITE SURVEY INVESTIGATION AND TESTING
Oct 21, 2024PS0004$120.2KTHIS CONTRACT ACTIONS IDENTIFIES IRA ES&T AND IRA LEC COMPONENTS FOR BEEBE PLAINS LPOE VT.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2026-10-31 (6 days from calculation)
+35 points
9 historical awards in this buyer and category group
+15 points
12 recorded award transactions
+10 points
Latest award action: 2026-06-29
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.