Federal contract award

47PC0225C0003

DESIGN/BUILD SERVICES CONTRACT IN THE AMOUNT OF $2,162,337.72 FOR THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPAIRS PROJECT LOCATED AT THE RON DE LUGO FB AND CH, ST THOMAS, USVI.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS PROJECT DELIVERY EAST - BRANCH C
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS
Parent award / vehicleNot reported
Set-aside8(A) SOLE SOURCE
Pricing typeFIRM FIXED PRICE
Obligations$3.4M
Current contract value$3.4M
Potential contract value / ceiling$3.4M
Start dateDec 16, 2024
Current end dateMar 2, 2027
Potential end dateApr 1, 2027
Latest award activityJun 24, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 24, 2026PS0005$0MODIFICATION TO UPDATE THE CONTRACT TO INCORPORATE FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (GSA CLASS DEVIATION RFO-2025-22). RON DE LUGO ATRIUM RENOVATION & SEWER LINES REPLACEMENT DB PROJECT, STT, USVI.
Jun 22, 2026PS0004$0NO-COST TIME EXTENSION ADDING 156 DAYS PER TIA AND 150 DAYS FOR WORK INCORPORATED IN MOD PS0003. SUBST DATE FROM 4/30/2026 TO 3/2/2027, AND THE ULTI DATE FROM 5/30/2026 TO 4/1/2027. EVERYTHING ELSE UNCHANGED. RON DE LUGO ATRIUM AND SEWER, STT, USVI.
Apr 6, 2026PS0003$1.2MCLIN 0003 REPLACE SANITARY PIPING. FOR $1,205,670.72 AMOUNT FROM $2,162,337.72 TO $3,368,008.44. POP REMAINS 4/30/2026 AND 5/30/2026. A FOLLOW ON MOD FOR POP CHANGE WILL BE ISSUED. EVERYTHING ELSE UNCHANGED. RON DE LUGO FOB & USCH, STT, USVI.
Jul 8, 2025PS0002$0IMPLEMENTATION OF CDS AND DRONES CLAUSE ON THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPLACEMENT DESIGN-BUILD SERVICES CONTRACT IN SAINT THOMAS, U.S. VIRGIN ISLANDS.
Feb 3, 2025PA0001$0TO ISSUE NTP AND UPDATE PROJECT COMPLETION DATES. RON DE LUGO FOB ATRIUM AND SEWERS PROJECT, ST. THOMAS, USVI
Dec 5, 20240$2.2MDESIGN/BUILD SERVICES CONTRACT IN THE AMOUNT OF $2,162,337.72 FOR THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPAIRS PROJECT LOCATED AT THE RON DE LUGO FB AND CH, ST THOMAS, USVI.

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2027-04-01 (158 days from calculation)
+35 points
33 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2026-06-24
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Check the stated set-aside against the solicitation and current certifications.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.