Federal contract award
47PC0225C0003
DESIGN/BUILD SERVICES CONTRACT IN THE AMOUNT OF $2,162,337.72 FOR THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPAIRS PROJECT LOCATED AT THE RON DE LUGO FB AND CH, ST THOMAS, USVI.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS PROJECT DELIVERY EAST - BRANCH C |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $3.4M |
| Current contract value | $3.4M |
| Potential contract value / ceiling | $3.4M |
| Start date | Dec 16, 2024 |
| Current end date | Mar 2, 2027 |
| Potential end date | Apr 1, 2027 |
| Latest award activity | Jun 24, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 24, 2026 | PS0005 | $0 | MODIFICATION TO UPDATE THE CONTRACT TO INCORPORATE FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (GSA CLASS DEVIATION RFO-2025-22). RON DE LUGO ATRIUM RENOVATION & SEWER LINES REPLACEMENT DB PROJECT, STT, USVI. |
| Jun 22, 2026 | PS0004 | $0 | NO-COST TIME EXTENSION ADDING 156 DAYS PER TIA AND 150 DAYS FOR WORK INCORPORATED IN MOD PS0003. SUBST DATE FROM 4/30/2026 TO 3/2/2027, AND THE ULTI DATE FROM 5/30/2026 TO 4/1/2027. EVERYTHING ELSE UNCHANGED. RON DE LUGO ATRIUM AND SEWER, STT, USVI. |
| Apr 6, 2026 | PS0003 | $1.2M | CLIN 0003 REPLACE SANITARY PIPING. FOR $1,205,670.72 AMOUNT FROM $2,162,337.72 TO $3,368,008.44. POP REMAINS 4/30/2026 AND 5/30/2026. A FOLLOW ON MOD FOR POP CHANGE WILL BE ISSUED. EVERYTHING ELSE UNCHANGED. RON DE LUGO FOB & USCH, STT, USVI. |
| Jul 8, 2025 | PS0002 | $0 | IMPLEMENTATION OF CDS AND DRONES CLAUSE ON THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPLACEMENT DESIGN-BUILD SERVICES CONTRACT IN SAINT THOMAS, U.S. VIRGIN ISLANDS. |
| Feb 3, 2025 | PA0001 | $0 | TO ISSUE NTP AND UPDATE PROJECT COMPLETION DATES. RON DE LUGO FOB ATRIUM AND SEWERS PROJECT, ST. THOMAS, USVI |
| Dec 5, 2024 | 0 | $2.2M | DESIGN/BUILD SERVICES CONTRACT IN THE AMOUNT OF $2,162,337.72 FOR THE RON DE LUGO ATRIUM RENOVATION AND SEWER LINES REPAIRS PROJECT LOCATED AT THE RON DE LUGO FB AND CH, ST THOMAS, USVI. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-04-01 (158 days from calculation)
- +35 points
- 33 historical awards in this buyer and category group
- +15 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2026-06-24
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.