Federal contract award

47PC0225F0017

THE CONSTRUCTION TASK ORDER AWARD TO SJ THOMAS FOR THE AERIAL WALKWAY BRIDGE REPAIRS AND REPLACEMENT- CONSTRUCTION PROJECT LOCATED IN ALBANY, NY IS FOR A TOTAL OF $2,615,800.00 WITH THE PERIOD OF PERFORMANCE OF 5/27/25 TO 3/3/26.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R2 REPAIR AND ALTERATIONS BRANCH
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS
Parent award / vehicle47PC0220D0003
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$3.0M
Current contract value$3.0M
Potential contract value / ceiling$3.0M
Start dateMay 27, 2025
Current end dateFeb 26, 2027
Potential end dateMar 28, 2027
Latest award activityJul 2, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 2, 2026PC0006$414.3KTHIS UNILATERAL MOD FOR THE AERIAL WALKWAY BRIDGE REPAIRS AND REPLACEMENT- CONSTRUCTION PROJECT IS INCORPORATE THE ATTACHED SOW DATED 2/17/26, INCREASE THE CONTRACT AWARD TOTAL TO $2,977,222.74, EXTEND THE POP COMPLETION DATE FROM 4/29/26 TO 2/26/27.
Jul 1, 2026PS0005$13.4KTHIS MODIFICATION IS TO INCORPORATE THE ATTACHED SOW DATED 11/06/25, AND INCREASE THE CONTRACT AWARD BY $13,421.13. THIS MOD ONLY ADDRESSES THE "ADDITIVE WORK: ADDITIONAL ELECTRICAL WORK" SECTION OF THE SOW. ALL OTHER TERMS AND CONDITIONS REMAIN
Jun 3, 2026PS0004$-3.9KTHIS MOD FOR THE AERIAL WALKWAY BRIDGE REPAIRS AND REPLACEMENT- CONSTRUCTION PROJECT IS TO DESCOPE THE WORK DESCRIBED IN THE SOW DATED 11/06/2025 AND TO DECREASE THE CONTRACT AWARD BY $3,872.00. ONLY ADDRESSES THE CHANGES TO ALUMINUM ENTRANCE DOORS
May 20, 2026PC0003$-76.7KTHIS UNILATERAL MOD FOR THE AERIAL WALKWAY BRIDGE REPAIRS AND REPLACEMENT- CONSTRUCTION PROJECT IS TO DESCOPE THE WORK DESCRIBED IN THE ATTACHED SOW DATED 11/06/2025, AND TO DECREASE THE CONTRACT AWARD TOTAL FROM $2,630,059.60 TO $2,553,325.18
Aug 26, 2025PS0002$14.3KTHE MODIFICATION IS TO INCORPORATE THE ATTACHMENTS, "RFP TEMPORARY FENCE" AND "RFI #001." THIS MOD INCREASES THE AWARD TOTAL TO $2,630,059.60, EXTENDS THE POP COMPLETION DATE TO 4/29/26 AND EXTENDS THE CLOSEOUT COMPLETION DATE FROM 5/29/26
Jul 23, 2025PS0001$0THIS CONTRACT MOD IS TO ISSUE THE ATTACHED NOTICE TO PROCEED DOCUMENT DATED 7/23/25. THIS MOD EXTENDS THE PERIOD OF PERFORMANCE COMPLETION DATE FROM 3/03/26 TO 4/28/26 AND TO EXTEND THE ULTIMATE ESTIMATED COMPLETION DATE FROM 5/03/26 TO 5/28/26
May 28, 20250$2.6MTHE CONSTRUCTION TASK ORDER AWARD TO SJ THOMAS FOR THE AERIAL WALKWAY BRIDGE REPAIRS AND REPLACEMENT- CONSTRUCTION PROJECT LOCATED IN ALBANY, NY IS FOR A TOTAL OF $2,615,800.00 WITH THE PERIOD OF PERFORMANCE OF 5/27/25 TO 3/3/26.

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2027-03-28 (147 days from calculation)
+35 points
95 historical awards in this buyer and category group
+15 points
7 recorded award transactions
+10 points
Latest award action: 2026-07-02
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Check the stated set-aside against the solicitation and current certifications.
  5. Review the award scope and buyer evidence before making a bid/no-bid decision.