Federal contract award

47PE0324F0012

HURRICANE REPAIR PROJECT, GEORGE C YOUNG FB & CH, 400 W. WASHINGTON ST., ORLANDO, FL 32801 & ANNEX U.S. CH, 401 W. CENTRAL BLVD., ORLANDO, FL 32801 ORLANDO ANNEX U.S. COURTHOUSE (FL0025ZZ) BUILDING ADDRESS: 401 WEST WASHINGTON ST., ORLANDO FL 32801

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R4 AMD CAPITAL/AE BRANCH
NAICS541310 — Architectural Services
PSCC213 — A&E Inspection Services (non-construction)
Parent award / vehicle47PF0023D0004
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.9M
Current contract value$2.9M
Potential contract value / ceiling$2.9M
Start dateAug 19, 2024
Current end dateNov 30, 2026
Potential end dateDec 31, 2026
Latest award activityMay 20, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 20, 2026PS0007$481.2KMODIFICATION TO ADD PACKAGE B WATER INTRUSION REPAIRS TO THE BUILDING ENVELOPE CONSTRUCTION DESIGN DOCUMENTS TO THE DESIGNER OF RECORD CONTRACT AWARD FORTHE GEORGE C. YOUNG FB ABD COURTHOUSE LOCATED AT 400 W. WASHINGTON STREET, ORLANDO, FL 32801.
Mar 13, 2026PS0006$253.7KARCHITECTURE AND ENGINEERING SERVICES FOR THE GEORGE C YOUNG US COURTHOUSE & ANNEX HURRICANE REPAIR PROJECT LOCATED IN ORLANDO, FL MODIFICATION FOR PROFESSIONAL DESIGN SERVICES TO DEVELOP CONSTRUCTION DOCUMENTS.
Sep 18, 2025PS0005$209.4KMODIFICATION FOR DEVELOPMENT OF PROGRAM OF REQUIREMENTS FOR WATER INTRUSION IN TO THE GEORGE C. YOUNG COURTHOUSE AND ANNEX LOCATED AT 401 W. CENTRAL BLVD ORLANDO, FL 32801-0401
Aug 27, 2025PS0004$0MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE BY 60 CALENDAR DAYS FOR DESIGN SERVICES IN THE GEORGE C. YOUNG U.S. COURTHOUSE LOCATED IN ORLANDO FL.
Apr 9, 2025PA0003$0MODIFICATION TO CHANGE CONTRACTING OFFICER TO JOSEPH ARDOIN AND EXTEND PERIOD OF PERFORMANCE TO 8/29/2025 FOR THE ORLANDO CRTHS ANNEX LOCATED AT 401 W CENTRAL BLVD ORLANDO, FL 32801-0401
Mar 25, 2025PS0002$0TO EXTEND THE PERFORMANCE PERIOD DUE TO LACK OF TECHNICAL GOVERNMENT REVIEW OF SUBMITTALS/DRAWINGS.
Oct 9, 2024PA0001$0CHANGE CONTRACTING OFFICER ASSIGNMENT. HURRICANE REPAIR PROJECT, GEORGE C. YOUNG FB & CH 400 W. WASHINGTON ST., ORLANDO, FL 32801 AND ORLANDO COURTHOUSE ANNEX 401 WEST CENTRAL BLVD., ORLANDO, FL 32801

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
1 historical awards in this buyer and category group
+0 points
7 recorded award transactions
+10 points
Latest award action: 2026-05-20
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Verify whether remaining options may extend performance beyond the current end date.
  3. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  4. Review the award scope and buyer evidence before making a bid/no-bid decision.