47PG0222C0001
WHITTAKER US COURTHOUSE, KANSAS CITY, MO THIS PROJECT WILL REPLACE THE BUILDING FACADE.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R6 CONSTRUCTION ACQUISITION BRANCH |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $110.9M |
| Current contract value | $110.9M |
| Potential contract value / ceiling | $110.9M |
| Start date | May 5, 2022 |
| Current end date | Dec 31, 2026 |
| Potential end date | Jun 30, 2027 |
| Latest award activity | Aug 25, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 64 of 64 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 25, 2026 | PS0064 | $3.3M | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THE MODIFICATION PROVIDES FOR APPLICATION OF EXTERIOR SEALANTS OF THE BUILDING. |
| Aug 4, 2026 | PS0063 | $11.2K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR UPDATES TO UNITED STATE MARSHALL SERVICE ELECTRICAL AND FINISHES. |
| Jul 7, 2026 | PS0062 | $0 | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. INCORPORATING DEI CLAUSE UNDER EO 14398 |
| Jun 16, 2026 | PS0061 | $10.8K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR USMS FURNITURE COORDINATION AND RFI 0375 SOUTH ROOF EXISTING CONDITIONS AT PRECAST JOINTS. |
| May 13, 2026 | PS0060 | $4.5K | CHARLES EVAN WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR USMS - FINAL CLEANING, INSTALLING NEW CARPET AND MEDALLION FLOORING, AND NEW ELECTRICAL AND LIGHTING CONTROLS. |
| Apr 30, 2026 | PS0059 | $0 | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION DOCUMENTS COST SAVINGS (BUYOUT SAVINGS) AND CREDITS (CREDITIVE ITEMS) GENERATED DURING THE PROJECT. |
| Apr 16, 2026 | PS0058 | $96.9K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. MODIFICATION PROVIDES IMPROVEMENTS/REPAIRS EAST & WEST JAMB SOFFIT TRANSITION, AREA INSULATION CLARIFICATION, REPAIR 14 ROOF DRAINS, AREA 11 EXISTING PRECAST SEALANT JOINTS & FIRESTOPPING |
| Feb 21, 2026 | PS0057 | $122.6K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR MULTIPLE CHANGES 10TH FLOOR AREAS C & D DUCT LINE LOCATION ISSUES, CW02 ITEMS, AREA 13 CW05 EXIST CONDITIONS, A13 L3 PRECAST JOINT FAILURE REPLACEMENT |
| Dec 29, 2025 | PS0056 | $84.6K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. AREA 4 SERVICE LEVEL SILL CONDITIONS, GAPS IN STONE AT EXISTING KNIFE PLATES, EXISTING SLAB SUPPORT FOR REVOLVING DOOR, LEVEL 3 FLASHING AND EXPANSION JOINT, MISCELLANEOUS FLOORING ITEMS |
| Nov 6, 2025 | PS0055 | $435.1K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. PROVIDES FOR MULTIPLE CHANGES FAILED INTERNAL GUTTER PIPING FOR 10TH FLOOR COURTROOM, MEGA COPING, SF03 AND SF04 STEEL, MISSING 5TH FLOOR FINISH PLANS, COURTROOM 8C CEILING TILES |
| Oct 14, 2025 | PS0054 | $461.5K | CHARLES WHITTAKER COURTHOUSE, KANSAS CITY, MO. MOTORIZED SHADES - CONTROLLER REPLACEMENT, SOUTH ROOF DRAINAGE PIPING-8TH FLOOR, MULLIONS, TOUCH UP PAINT IN 6, 7, AND 8 E CHAMBERS, STEEL CONFLICTS, AREA 7, LEVELS 6-8 CORRIDOR BASE HEIGHT ISSUE |
| Sep 15, 2025 | PS0053 | $933.0K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. CHANGES TO WORK AREA 7 TIME EXTENSION, CRUCIFORM SHIMMING, SOUTH TOWER CRANE, AND AREA 15 EXISTING STEEL |
| Aug 29, 2025 | PS0052 | $240.9K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR UNFORESEEN CONDITION CORRECTIONS NON CW01 SLAB EDGE, CW02 LINEAR DIFFUSERS AND FLOOR LEVELING, AREA 7, LEVEL 8 PW03 AREA 7, PW02 SILL AND HEAD SUPPORT STEEL |
| Aug 12, 2025 | PS0051 | $49.1K | CHARLES WHITTAKER UNITED STATES FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR UNITED STATES DISCTRICT COURT TRAINING ROOM HALLWAY CARPET AND LIGHTBULB REPLACEMENT FOR AREA 1. |
| Jun 25, 2025 | PS0050 | $164.6K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR THREE CHANGES, HEAT TRACE AT ROOF GUTTER, UNFORESEEN CONDITIONS AT CW02, AND CW02 STRUCTURAL STEEL CHANGES. |
| Jun 17, 2025 | PS0049 | $2.1M | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR IMPROVEMENTS AND STUDY OF THE NORTH ROOF. |
| May 28, 2025 | PS0048 | $34.9K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR WEATHER WALL FINISH FOR AREAS 9 AND 10. |
| May 13, 2025 | PO0047 | $560.0K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION IS ISSUED TO ACCOUNT FOR IDENTIFIED PROJECT SCHEDULE CHANGES. |
| May 7, 2025 | PS0046 | $0 | WHITTAKER COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS46 IS ISSUED TO UPDATE THE DAILY RATE ASSOCIATED WITH COMPENSABLE DELAYS TO $10,132. |
| Apr 29, 2025 | PS0045 | $82.8K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR RESOLING CW01 AREAS 1D & 1E SLAB EDGE ISSUES. |
| Apr 14, 2025 | PS0044 | $114.7K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR OOR HARDWARE REVISIONS |
| Apr 7, 2025 | PS0043 | $20.7K | CHARLES WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR WALL COVERINGS FOR ROOMS 418, 420, & P451B |
| Apr 3, 2025 | PS0042 | $0 | IMPLEMENTATION OF CDS AND DRONES CLAUSE |
| Mar 26, 2025 | PS0041 | $595.2K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. UNITED STATES MARSHALL SERVICE CARPET & PAINT REFRESH MOVE MANAGEMENT |
| Mar 17, 2025 | PS0040 | $416.2K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION IS FOR EXTENDED NORTH ROOF SCOPE PIPE WORK |
| Mar 11, 2025 | PS0039 | $362.8K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. WHITTAKER FACADE REPLACEMENT PROJECT. THIS MODIFICATION PROVIDES FOR REPLACEMENT AND COMPLETION OF FIN TUBE SYSTEM |
| Mar 3, 2025 | PS0038 | $349.9K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, FACADE REPLACEMENT PROJECT, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR USMS RWA CARPET, LIGHTING AND LIGHTING CONTROLS. |
| Feb 27, 2025 | PS0037 | $197.1K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR CORRECTIONS TO CURTAIN WALL AREA 1A-1C SLAB EDGE |
| Feb 14, 2025 | PS0036 | $37.7K | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR MOTION SENSORS NEAR THE FRONT GLAZING. |
| Feb 11, 2025 | PS0035 | $17.2K | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION IS ISSUED TO PROVIDE FOR ADDITIONAL FRONT ENTRY SECURITY ITEMS. |
| Dec 31, 2024 | PS0034 | $122.3K | CHARLES EVANS WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MISSOURI THIS MODIFICATION IS ISSUED TO PROVIDE FOR CONSTRUCTION DRAWING SET CHANGES, CARPET, C&C VAV CONTROLS, AND FINISHES UPDATES |
| Dec 20, 2024 | PS0033 | $176.1K | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION ISSUED FOR THE RELOCATION OF CAMERAS IMPACTED BY CONSTRUCTIONS ACTIVITIES. |
| Nov 26, 2024 | PS0032 | $13.0K | CHARLES EVANS WHITTAKER CTHS, 400 E 9TH ST, KANSAS CITY, MO. PS32 IS ISSUED TO FUND FURNITURE MOVE ON BEHALF OF A FIELD OFFICE PROJECT RELATED TO WATER DAMAGE. |
| Oct 22, 2024 | PS0030 | $874 | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. MODIFICATION ISSUED TO PROVIDE FOR UPDATES IN ACCORDANCE WITH RFI 112, AREA 12 - SERVICE LEVEL EXISTING AREAWAY CONDITION |
| Sep 23, 2024 | PS0029 | $32.5K | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION IS TO PROVIDE NORTH ROOD PIPE TESTING. |
| Sep 11, 2024 | PS0028 | $4.0K | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR UPDATES TO 10TH FLOOR BOOKCASES AND THE USMS WEIGHT ROOM. |
| Aug 7, 2024 | PS0027 | $661.1K | CHARLES E WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR AN ACCELERATED SOUTH ROOF SCOPE |
| Jul 12, 2024 | PS0026 | $2.8M | CHARLES E WHITTAKER FEDERAL COURTHOUSE, KANSAS CITY, MO. THIS IS A FUNDING STRING CHANGE FOR MOVE MANAGEMENT. MOVE MANAGEMENT IS A NECESSARY EXPENSE. CONTRACTOR AND SUB CONTRACTOR WILL BE PERFORMING THIS WITHIN THE GENERAL SCOPE OF THE CONTRACT. |
| Mar 18, 2024 | PS0025 | $575.6K | CHARLES WHITTAKER UNITED STATE COURTHOUSE, KANSAS CITY, MISSOURI. PROVIDE ROOF INVESTIGATION TO EXISTING CONDITIONS TO PINPOINT ACTIVE LEAKS BUILDBACK OF THE AREAS REMOVED FOR ROOF INVESTIGATION DOES NOT INCLUDE ROOF DRAIN WATER TESTING. |
| Feb 8, 2024 | PO0024 | $0 | CHARLES E WHITTAKER US FEDERAL COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MISSOURI 64106. THE MODIFICATION IS ISSUED TO DOCUMENT NOTICE TO PROCEED WITH CONSTRUCTION SERVICES. |
| Jan 25, 2024 | PA0023 | $3.3M | CHARLES EVANS WHITTAKER CTHS, 400 E 9TH ST, KANSAS CITY, MO. PA23 IS ISSUED TO RE-OBLIGATE BA55 FUNDS TO VMO00248 ROOF SCOPE. AFTER PA22 AND PA23, THE OVERALL VALUE OF THE CONTRACT REMAINS UNCHANGED. |
| Jan 24, 2024 | PA0022 | $-3.3M | CHARLES EVANS WHITTAKER CTHS, 400 E 9TH ST, KANSAS CITY, MO. PA22 DE-OBLIGATES FUNDS FROM THE PIID VMO00246. FUNDS WILL BE RE-OBLIGATED WITH PA23. |
| Jan 22, 2024 | PA0021 | $8.7K | CHARLES EVANS WHITTAKER CTHS, 400 E 9TH ST. KANSAS CITY, MO.PA21 IS ISSUED TO RE-OBLIGATE FUNDS FOR IRA SIGNAGE TO BA55. PA20 DE-OBLIGATED SAME FUNDS FROM BA24. OVERALL VALUE OF THE CONTRACT REMAINS UNCHANGED. |
| Jan 19, 2024 | PA0020 | $-8.7K | CHARLES EVANS WHITTAKER CTHS, 400 E 9TH ST, KANSAS CITY, MO. PA20 IS ISSUED TO DE-OBLIGATE FUNDS INAPPROPRIATELY OBLIGATED TO IRA BA24. FUNDS WILL BE RE-OBLIGATED TO BA55 WITH PA21. |
| Jan 9, 2024 | PS0019 | $65.7M | CHARLES E WHITTAKER UNITED STATES COURTHOUSE, 400 EAST 9TH STREET, KANSAS CITY, MISSOURI 64106. FACADE REPLACEMENT PROJECT. THIS MODIFICATION IS ISSUED TO DOCUMENT AND EXERCISE THE GUARANTEED MAXIMUM PRICE OPTION. |
| Nov 28, 2023 | PS0018 | $6.2M | CHARLES WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION PROVIDES FOR STOREFRONT, CW03, & SKYLIGHT MATERIAL AND TRANSPORT |
| Oct 16, 2023 | PS0017 | $6.5M | CHARLES E. WHITTAKER US COURTHOUSE, 400 EAST NINTH STREET, KANSAS CITY, MISSOURI, 64106. THIS MODIFICATION IS ISSUED FOR CONSTRUCTION SITE SIGNAGE TO BE CREATED, INSTALLED, AND REMOVED UPON COMPLETION OF THE PROJECT. |
| Oct 4, 2023 | PA0016 | $-6.5M | CHARLES WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. THIS MODIFICATION IS TO CORRECT THE PROJECT ACCOUNTING RECORD TO INCLUDE SUBCATEGORY CODES IN ACCORDANCE WITH INFLATION REDUCTION ACT REQUIREMENTS. THIS IS A NO COST MODIFICATION. |
| Sep 25, 2023 | PA0015 | $0 | PA15 IS A MODIFICATION AGAINST THIS CONTRACT ADDING AN ACCOUNTING LINE. IT IS CURRENTLY A $0 DOLLAR LINE BUT WILL BE REQUESTING A COST TRANSFER TO MOVE FUNDS FROM ACCOUNTING LINE 11 TO ACCOUNTING LINE 12 TO ALIGN WITH IRA REQUIREMENTS. |
| Aug 31, 2023 | PS0014 | $12.6M | CHARLES WHITTAKER US COURTHOUSE, KANSAS CITY, MISSOURI. FACADE REPLACEMENT PROJECT, MATERIALS AND TRANSPORTATION FOR CURTAINWALL SYSTEMS |
| Aug 30, 2023 | PS0013 | $6.5M | CHARLES EVANS WHITTAKER CTHS 400 E 9TH ST KANSAS CITY, MO 64106-2607 PS13 IS ISSUED TO STRUCTURAL STEEL PRECONSTRUCTION SERVICES AND CONSTRUCTION FOR THE WHITTAKER FACADE REPLACEMENT |
| Aug 16, 2023 | PO0012 | $0 | MO0050ZZ CHARLES EVANS WHITTAKER CTHS 400 E 9TH ST KANSAS CITY, MO 64106-2607 GMP RESET DUE TO IRA FUNDING |
| May 10, 2023 | PS0011 | $87.8K | CHARLES WHITTAKER COURTHOUSE KANSAS CITY MO PHYSICAL MOVE MANAGEMENT SERVICES |
| Apr 13, 2023 | PS0010 | $706.0K | WHITTAKER COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS10 IS ISSUED TO EXTEND GENERAL CONTRACTOR (JE DUNN) PRECONSTRUCTION SERVICES. |
| Apr 12, 2023 | PS0009 | $1.4M | WHITTAKER FEDERAL COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS09 IS ISSUED TO CONSTRUCTION OF A GLAZING MOCK-UP AND A PERFORMANCE MOCK-UP IN SUPPORT OF THE PROSPECTUS PROJECT AT THE WHITTAKER COURTHOUSE. |
| Mar 28, 2023 | PS0008 | $468.4K | WHITTAKER FEDERAL COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS08 IS ISSUED FOR DRAFTING SERVICES, SHOP DRAWINGS, AND FABRICATION DRAWINGS FOR CW01 AND CW02. |
| Mar 23, 2023 | PS0007 | $103.3K | WHITTAKER COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS07 IS ISSUED TO PROVIDE INVESTIGATIVE SELECTIVE DEMOLITION TO EIGHT (8) PORTIONS OF THE BUILDING EXTERIOR CURTAIN WALL SYSTEM. |
| Mar 9, 2023 | PS0006 | $713.4K | CHARLES E. WHITTAKER U.S. COURTHOUSE, KANSAS CITY, MO. THIS MODIFICATION IS ISSUED FOR DESIGN ASSISTANCE ON THIS PROJECT. |
| Mar 3, 2023 | PS0005 | $-20.0K | CHARLES EVANS WHITTAKER COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PS05 DEFINITIZING PDL PC04 FROM NTE $25K TO $5042 FOR A TOTAL DEDUCT OF $19,985. NEW CONTRACT VALUE WILL BE $1,301,479 |
| Jan 30, 2023 | PC0004 | $25.0K | CHARLES EVANS WHITTAKER COURTHOUSE, 400 E 9TH ST, KANSAS CITY, MO. PC04 IS A PRICE DETERMINED LATER MODIFICATION TO FUND INVESTIGATIVE DEMOLITION LIMITED TO ONE ROOM WITH A PRICE NOT TO EXCEED $25,000. |
| Nov 8, 2022 | PA0003 | $0 | CHARLES E. WHITTAKER US COURTHOUSE, KANSAS CITY, MO THIS ADMINISTRATIVE MODIFICATION IS BEING ISSUED TO CORRECT THE CONTRACTOR'S UEI. |
| Jul 20, 2022 | PS0002 | $400.0K | CHARLES EVANS WHITTAKER CTHS 400 E 9TH ST KANSAS CITY, MO 64106-2607 PS02 OBLIGATES FUNDS FOR MANAGEMENT OF THE MOVE MANAGEMENT TEAM ASSOCIATED WITH THE WHITTAKER FACADE PROSPECTUS. |
| Jun 2, 2022 | PO0001 | $0 | WHITTAKER US COURTHOUSE, KANSAS CITY, MO GOVERNMENT ISSUES DESIGN PHASE NOTICE TO PROCEED (NTP) WITH THIS FULLY EXECUTED MODIFICATION. |
| May 5, 2022 | 0 | $896.4K | WHITTAKER US COURTHOUSE, KANSAS CITY, MO THIS PROJECT WILL REPLACE THE BUILDING FACADE. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-06-30 (241 days from calculation)
- +35 points
- 67 historical awards in this buyer and category group
- +15 points
- 64 recorded award transactions
- +10 points
- Latest award action: 2026-08-25
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.