Federal contract award

47PH0424F0007

PROVIDE COMPLETE DESIGN TO GUT AND RENOVATE KENNELS. THIS ENTAILS DESIGN OF A NEW INTERIOR FLOORPLAN WHICH INCLUDES INCREASED NUMBER OF KENNELS, A REDUCTION IN RESTROOM SPACE AND AN INCREASE IN OFFICE SPACE LOCATED AT 9901 S CAGE BLVD PHARR, TX 78577

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R7 NON-PROSPECTUS - BORDER
NAICS541310 — Architectural Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicle47PH0822D0008
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$189.4K
Current contract value$189.4K
Potential contract value / ceiling$189.4K
Start dateDec 5, 2023
Current end dateApr 10, 2026
Potential end dateApr 10, 2026
Latest award activityFeb 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Feb 27, 2026PS0006$0MODIFICATION IS TO EXTEND TASK ORDERS COMPLETION DATE. NO OTHER CHANGES.
Mar 18, 2025PS0005$34.5KMODIFICATION PS0005 FOR THE PHARR LAND PORT OF ENTRY KENNELS RENOVATION IS TO INCORPORATE REVISED SOW DATED 02/20/2025. THE TASK ORDER WILL BE EXTENDED FROM 04/03/2025 TO 09/30/2025.
Nov 20, 2024PA0004$0MODIFICATION IS TO EXTEND COMPLETION DATE AND TO ADD AND ADJUST ACCOUNTING STRINGS. THIS IS A NO COST MODIFICATION.
Jul 23, 2024PS0003$7.8KEXTENDED FROM 11/15/24 - 12/06/24. INCREASED BY $7,830.00, WHICH INCREASED THE CONTRACT VALUE FROM $147,106.98 TO $154,936.98TO IDENTIFY CONDITION AND DETERMINE COST-EFFECTIVE MEANS OF ADDRESSING THE PLUMBING ISSUE AT9901 S CAGE BLVD PHARR, TX 78577.
Jun 6, 2024PS0002$17.7KREVISED SOW IS TO ADD SCOPING THE SANITARY PIPE AND INSPECT/TEST THE GRINDING SYSTEM. EXTENDED FROM 09/16/24 - 11/15/224, INCREASED BY $17,718.00, WHICH INCREASED VALUE FROM $129,388.98 TO $147,106.98, 9901 S CAGE BLVD. PHARR, TX 78577.
Jan 3, 2024PS0001$0EXTEND THE COMPLETION DATE DUE COORDINATING AROUND THE HOLIDAY SEASON. THE CONTRACT COMPLETION DATE IS BEING EXTENDED FROM 08/09/24 - 09/16/24. ALSO SERVES AS THE NOTICE TO PROCEED AS OF 12/21/23 LOCATED AT 9901 S CAGE BLVD. PHARR, TX 78577.
Dec 6, 20230$129.4KPROVIDE COMPLETE DESIGN TO GUT AND RENOVATE KENNELS. THIS ENTAILS DESIGN OF A NEW INTERIOR FLOORPLAN WHICH INCLUDES INCREASED NUMBER OF KENNELS, A REDUCTION IN RESTROOM SPACE AND AN INCREASE IN OFFICE SPACE LOCATED AT 9901 S CAGE BLVD PHARR, TX 78577

Research next steps

  1. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  2. Review the award scope and buyer evidence before making a bid/no-bid decision.