Federal contract award
47PH0424F0018
THE ARCHITECT-ENGINEER (A/E) FIRM SHALL DESIGN, DEVELOP, AND PROVIDE DESIGN CONTRACT DOCUMENTS TO RENOVATE THE INTERIOR SPACES WITHIN BUILDING A, B AND C OF THE BORDER PATROL ANNEX LOCATED AT 2301 SOUTH MAIN ST, MCALLEN, TEXAS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R7 NON-PROSPECTUS - BORDER |
| NAICS | 541310 — Architectural Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | 47PH0822D0008 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $181.5K |
| Current contract value | $181.5K |
| Potential contract value / ceiling | $181.5K |
| Start date | Mar 27, 2024 |
| Current end date | Sep 30, 2025 |
| Potential end date | Sep 30, 2025 |
| Latest award activity | Jun 26, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 26, 2025 | PS0003 | $0 | THE PURPOSE OF THIS MODIFICATION (PS0003) TO TASK ORDER 47PH0424F0018 FOR THE MCALLEN ANNEX BORDER PATROL STATION, 2301 SOUTH MAIN STREET, MCALLEN, TEXAS 78503, IS TO PROVIDE A TIME EXTENSION OF 133 DAYS TO COVER TIME LOST DUE TO CUSTOMER CHANGES. |
| Feb 14, 2025 | PS0002 | $66.0K | THIS MODIFICATION IS TO ADJUST THE ESTIMATED COST OF CONSTRUCTION AT AWARD (ECCA) FROM $967,690 TO $2,354,557.93 FOR THE DESIGN SERVICES FOR THE BORDER PATROL ANNEX BUILDING IN MCALLEN, TEXAS. |
| Nov 8, 2024 | PS0001 | $24.6K | THE MODIFICATION IS FOR THE ADDITIONAL SITE VISIT REQUIRED BY RICHTER AND THEIR CONSULTANTS TO SURVEY AND VERIFY EXISTING CONDITIONS FOR THE THREE BUILDINGS FOR THE DESIGN SERVICES FOR THE BP ANNEX IN MCALLEN, TEXAS. |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.