Federal contract award

47PH0822F0016

CONSTRUCTION OF A NEW US COURTHOUSE IN GREENVILLE, MS

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R7 PROG SUPPORT - CAPITAL AND IDIQ
NAICS236220 — Commercial and Institutional Building Construction
PSCZ2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS
Parent award / vehicle47PH0821D0009
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$49.6M
Current contract value$49.6M
Potential contract value / ceiling$49.6M
Start dateMar 29, 2022
Current end dateMar 27, 2026
Potential end dateJun 25, 2026
Latest award activityMay 14, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 17 of 17 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 14, 2026PC0033$0THIS MODIFICATION DEFINITIZES PDL MODIFICATION PC0027. THE SCOPE OF WORK TO BE PERFORMED WAS TO INSTALL SMOKE DETECTORS IN THE ELEVATOR PITS AT THE CONSTRUCTION PROJECT.
May 13, 2026PC0032$40.0KMODIFICATION PC0032 IS FOR WORK NECESSARY TO COMPLETE THE CONSTRUCTION OF THE NEW U. S. COURTHOUSE IN GREENVILLE, MS AS IT PERTAINS TO ADDITIONAL HARDWARE FOR MEANS OF EGRESS AND SECURITY FUNCTIONALITY.
Apr 23, 2026PC0031$-805THIS MOD DEFINITIZES MOD PC0030 PDL FOR DUCT DETECTORS AND SMOKE BEAM WORK IN THE GREENVILLE COURTHOUSE, MS.
Mar 17, 2026PC0030$55.3KPDL MOD TO PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TRANSPORTATION, AND SUPERVISION NECESSARY TO PERFORM THE WORK IN BULLETIN 36 REVISED (WORK ASSOCIATED WITH LOBBY BEAN DETECTOR RELOCATION) AND BULLETIN 40 (DUCT DETECTORS)
Feb 10, 2026PC0029$196.5KDEFINITIZE PDL MOD PC0026 FOR BULLETIN 37 SCOPE REQUIREMENTS
Feb 2, 2026PC0028$174.4KTHE WORK INCLUDES CLEANING AFTER INTERIOR AND EXTERIOR WORK, CIVIL, CONCRETE AND SOD WORK, LOWERING THE GATES, INSTALL OF METAL HANDRAILS, CARPENTRY, METAL SHELVING, PAINTING, PLUMBING, ELECTRICAL WORK, AND LABOR FOR INSTALLING NETWORK SWITCHES.
Jan 27, 2026PC0027$52.9KADD SMOKE DETECTORS TO THE ELEVATOR PITS
Dec 11, 2025PC0026$244.3KPARTIAL SOW TO BE PERFORMED FROM BULLETIN 37 RELATED TO ROOFING, DOORS AND HARDWARE (DOORS 246 AND 255), MECHANICAL WORK AND ELECTRICAL WORK
Sep 25, 2025PC0025$107.7KREMOVAL OF PLYWOOD AND INSTALLATION OF GYPSUM BOARD EXTENDING 1 INCH TO 7 INCH DOWN FROM THE SOFFITS AT THE PERIMETER OF 2ND AND 3RD FLOOR COURTROOMS FOLLOWING PARTIAL REMOVAL OF SLATS.
Sep 17, 2025PC0024$134.3KMODIFICATION TO ADD VARIOUS PCOS 27 -31, 33-34, AND 37 CONSTRUCTION SIGNAGE, GREENVILLE, MS
Aug 13, 2025PC0023$286.2KADD VARIOUS PROPOSED CHANGES AS IT RELATES TO BULLETIN 36, GREENVILLE COURTHOUSE, GREENVILLE, MS
Jul 24, 2025PC0022$386.0KADD BULLETIN 35 FOR COURT EAGLE SIGNAGE, EXTERIOR EMBLEM PCO 27 BULLETIN 35 SIGNAGE CHANGE, SWITCHES AND USDC AV, AND ELEVATOR A.17 REQUIREMENTS RFI 741, ETC TO THE SCOPE OF WORK TO BE PERFORMED.
Jun 26, 2025PC0021$72.8KADD PCO 032 OVERHEAD DOOR REQUIREMENT, GREENVILLE, MS COURTHOUSE
Jun 17, 2025PC0020$246.4KPROVIDE CONSTRUCTION EFFORT REQUIRED TO INCORPORATE THE CUSTOM FENCE CORRUGATED PANELS, ELECTRICAL CHANGES RELATED TO RFI-564, RFI-565, RFI-594, RFI-604, RFI-644, RFI-662 AND BULLETIN 30 (PCO 046), AND PATCHING AT HVAC DAMPER CONTROL.
Mar 25, 2025PC0019$0NO COST TIME EXTENSION OF CONTRACT FOR THE NEW US COURTHOUSE IN GREENVILLE, MS.
Dec 20, 2024PS0018$246.4KBULLETIN 34 (MISCELLANEOUS CHANGES) & STRUCTURED CABLING CLARIFICATIONS FOR THE NEW US COURTHOUSE IN GREENVILLE, MS
Dec 4, 2024PC0017$0NO COST TIME EXTENSION OF CONTRACT TO 06/26/2025 FOR THE NEW US COURTHOUSE IN GREENVILLE, MS.

Research next steps

  1. Verify whether remaining options may extend performance beyond the current end date.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.