Federal contract award
47PH0825F0006
DESIGN BUILD CONSTRUCTION FOR GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TX.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS PROJECT DELIVERY CAPITAL CONSTRUCTION - BRANCH CENTRAL |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | 47PH0821D0004 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $264.8M |
| Current contract value | $264.8M |
| Potential contract value / ceiling | $272.0M |
| Start date | Dec 13, 2024 |
| Current end date | Mar 6, 2029 |
| Potential end date | Jun 5, 2029 |
| Latest award activity | Sep 2, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 18 of 18 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 2, 2026 | PS0017 | $365.9K | THIS MODIFICATION IS TO UPDATE THE DETENTION SUITE WALL MATERIAL AND TO DEFINITIZE PC0012 ASBESTOS CONTAINING MATERIAL AT THE LOADING DOCK BUILDING FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Aug 27, 2026 | PC0016 | $100.0K | THIS UNILATERAL MODIFICATION IS TO ALLOW THE CONTRACTOR TO PROCEED WITH RESOLVING UNFORESEEN SOIL CONDITIONS DISCOVERED AT THE JOBSITE DURING EXCAVATION FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Aug 12, 2026 | PS0015 | $240.7K | THIS MODIFICATION IS FOR ACQUISITION OF A NEW INCINERATOR FOR THE BROWNSVILLE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT IN BROWNSVILLE, TX. |
| Jun 30, 2026 | PC0014 | $50.0K | MODIFICATION PC0014 IS TO ALLOW THE CONTRACTOR TO PROCEED WITH RESOLVING UNFORESEEN CONDITIONS DISCOVERED AT THE JOBSITE DURING DEMOLITION/UNDERGROUND UTILITY DEMOLITION FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Jun 16, 2026 | PS0013 | $555.4K | THIS MODIFICATION IS FOR ADDITIONAL SCOPE FOR SUBMETERING, OPERATIONS AND MAINTENANCE SPACE BUILD OUT, AND AT&T TELEPHONE LINE FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TEXAS. |
| Jun 8, 2026 | PC0012 | $100.0K | THIS PRICE DETERMINED LATER MODIFICATION IS TO ALLOW THE CONTRACTOR TO PROCEED WITH ASBESTOS CONTAINING MATERIAL (ACM) ABATEMENT AT THE LOADING DOCK FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION, BROWNSVILLE, TEXAS. |
| Apr 8, 2026 | PS0011 | $149.4K | THIS MODIFICATION IS FOR ASBESTOS RECONCILIATION, HSDN ROOM UPDATES, AND PERSONNEL CHANGES FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Feb 12, 2026 | PS0010 | $153.9K | THIS MODIFICATION IS TO INCORPORATE MISCELLANEOUS DESIGN CHANGES TO INCLUDE ADDITIONAL BOLLARDS, HOSE BIBS AND VEHICLE ACCESS GATE FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION IN BROWNSVILLE, TEXAS. |
| Feb 6, 2026 | PS0009 | $175.1K | THIS MODIFICATION IS TO ENHANCE THE SECURITY MEASURES PROVIDED AROUND THE TEMPORARY PARKING FACILITIES PROVIDED FOR THE PROJECT DURING CONSTRUCTION FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TEXAS |
| Oct 30, 2025 | PS0008 | $-782.2K | RESCISSION OF PBS P100 FACILITIES STANDARDS, AND ISSUANCE OF PBS INTERIM CORE BUILDING STANDARDS FOR THE GATEWAY LAND PORT OF ENTRY MODERNIZATION, BROWNSVILLE, TEXAS |
| Sep 25, 2025 | PS0007 | $0 | THIS MODIFICATION IS TO INCORPORATE THE NO COST PROGRAM CHANGES FROM THE DESIGN PHASE ITEM CHANGE (DPIC) - 008 INTO THE GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TEXAS. |
| Jul 24, 2025 | PS0006 | $-262.5K | THIS MODIFICATION IS TO PROVIDE THE GOVERNMENT WITH A CREDIT FOR Z-PORTAL DELETION AND REMOVAL OF OFFICE OF FEDERAL CONTRACT COMPLIANCE PROGRAMS (OFCCP) COORDINATION FROM THE GATEWAY LAND PORT OF ENTRY (LPOE) MODERNIZATION PROJECT IN BROWNSVILLE, TX. |
| May 29, 2025 | PS0005 | $1.8K | THIS MODIFICATION IS TO DEFINITIZE PC0002 AND PC0003 FOR DESIGN BUILDING CONSTRUCTION OF THE BROWNSVILLE GATEWAY MODERNIZATION PROJECT IN BROWNSVILLE, TX |
| Apr 30, 2025 | PS0004 | $0 | THIS MODIFICATION IS TO INCORPORATE THE CBP NO COST IMPACT ITEMS INTO THE BROWNSVILLE GATEWAY TASK ORDER. THE TASK ORDER IS FOR DESIGN BUILD SERVICES FOR COMPLETE MODERNIZATION OF THE GATEWAY LAND PORT OF ENTRY IN BROWNSVILLE, TEXAS. |
| Mar 19, 2025 | PC0003 | $1.4K | MODIFICATION IS FOR THE DESIGN BUILD CONTRACTOR TO EXTEND THE TIME FOR A LICENSED ARCHEOLOGIST TO PERFORM MONITORING DURING GEOTECHNICAL INVESTIGATIONS FOR THE GATEWAY BROWNSVILLE MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Mar 11, 2025 | PC0002 | $10.5K | MODIFICATION IS FOR THE DESIGN BUILD CONTRACTOR TO HIRE A LICENSED ARCHEOLOGIST TO PERFORM MONITORING DURING GEOTECHNICAL INVESTIGATIONS FOR THE GATEWAY BROWNSVILLE MODERNIZATION PROJECT IN BROWNSVILLE, TEXAS. |
| Feb 19, 2025 | PS0001 | $0 | MODIFICATION TO ISSUE NOTICE TO PROCEED FOR THE DESIGN BUILD CONSTRUCTION MODERNIZATION OF THE GATEWAY LAND PORT OF ENTRY, BROWNSVILLE, TEXAS. |
| Dec 13, 2024 | 0 | $263.9M | DESIGN BUILD CONSTRUCTION FOR GATEWAY LAND PORT OF ENTRY MODERNIZATION PROJECT, BROWNSVILLE, TX. |
Estimated positioning window
Jun 5, 2028 – Dec 5, 2028
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2029-06-05 (954 days from calculation)
- +15 points
- 4 historical awards in this buyer and category group
- +15 points
- 18 recorded award transactions
- +10 points
- Latest award action: 2026-09-02
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.