Federal contract award
47PK0724C0022
THIS PROJECT IS TO USE ENGINEERING AND FEASIBILITY STUDIES PERFORMED POST CONSTRUCTION FOR THE CHILLED WATER AND MBR/RECLAIMED WATER SYSTEMS TO CORRECT PREVIOUS DESIGNS, SO THAT EACH SYSTEM CAN FULLY SERVICE AND SUPPORT SAN YSIDRO LPOE, SAN YSIDRO CA
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R9 AMD SAT SAN DIEGO SUPPORT SECTION |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AA — CONSTRUCTION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.7M |
| Current contract value | $1.7M |
| Potential contract value / ceiling | $1.7M |
| Start date | Aug 30, 2024 |
| Current end date | Nov 20, 2026 |
| Potential end date | Jan 19, 2027 |
| Latest award activity | Jul 24, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 24, 2026 | PS0006 | $0 | INCORPORATING DEI CLAUSE UNDER EO 14398 |
| Nov 14, 2025 | PS0005 | $0 | MODIFICATION PS0005 IS TO ISSUE A NO COST ON-SITE NOTICE TO PROCEED FOR CONSTRUCTION AND TO ADJUST THE COMPLETION DATES ACCORDINGLY FOR THE SYLPOE NB HEADHOUSE CHILLER AND MBR UPGRADES AT THE SAN YSIDRO LAND PORT OF ENTRY. |
| Sep 26, 2025 | PS0004 | $0 | MODIFICATION PS0004 IS TO ISSUE A NO COST TIME EXTENSION TO ALLOW FOR PROJECT CONTINUATION FOR SYLPOE NB HEADHOUSE CHILLER AND MBR UPGRADES AT THE SAN YSIDRO LAND PORT OF ENTRY. |
| Apr 2, 2025 | PS0003 | $0 | MODIFICATION TO ADD CLASS DEVIATIONS & CLAUSE FAR 52.240-1 "PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE-ACT COVERED FOREIGN ENTITIES," (NOV 2024) FOR SYLPOE MBR UPGRADES CONTRACT |
| Mar 25, 2025 | PS0002 | $0 | MODIFICATION RESCINDS P-100 BUILDING STANDARDS AND REPLACES IT WITH THE PBS CORE BUILDING STANDARDS FOR THE SYLPOE NB HEADHOUSE CHILLER AND MBR UPGRADES PROJECT. |
| Feb 26, 2025 | PA0001 | $0 | ADMIN MOD TO CHANGE CO FROM PATRICK HARVEY TO ANTONIO HEREDIA, SAN YSIDRO LAND PORT OF ENTRY MECHANICAL UPGRADES AND CORRECTIONS, SAN YSIDRO, CA |
| Aug 30, 2024 | 0 | $1.7M | THIS PROJECT IS TO USE ENGINEERING AND FEASIBILITY STUDIES PERFORMED POST CONSTRUCTION FOR THE CHILLED WATER AND MBR/RECLAIMED WATER SYSTEMS TO CORRECT PREVIOUS DESIGNS, SO THAT EACH SYSTEM CAN FULLY SERVICE AND SUPPORT SAN YSIDRO LPOE, SAN YSIDRO CA |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
65/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 65/100. Available recorded signals: 60 points.
- Contract end 2027-01-19 (86 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-07-24
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.