Federal contract award
47PK1725F0025
DESIGN BUILD R9 IDIQ REPAIR AND ALTERATION PROJECT - DELLUMS PIPE FITTING REPLACEMENT TO BE PERFORMED AT RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE 1301 CLAY ST, OAKLAND, CA 94612
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R9 AMD FIELD PROJECTS |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Y1AZ — CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| Parent award / vehicle | 47PK0121D0061 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.4M |
| Current contract value | $1.4M |
| Potential contract value / ceiling | $1.4M |
| Start date | Sep 16, 2025 |
| Current end date | Aug 27, 2026 |
| Potential end date | Oct 26, 2026 |
| Latest award activity | Jul 10, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 10, 2026 | PS0004 | $96.8K | MODIFICATION PS0004 IS TO ADD ADDITIONAL COUPLING REPLACEMENT WORK FOR THE PIPE FITTING REPLACEMENT PROJECT AT RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE, 1301 CLAY ST, OAKLAND, CA 94612. |
| Apr 8, 2026 | PS0003 | $0 | MODIFICATION PS0003 IS TO ISSUE THE ON-SITE NOTICE TO PROCEED FOR FULL CONSTRUCTION OF THE DELLUMS PIPE FITTING REPLACEMENT PROJECT AT 1301 CLAY ST, OAKLAND, CA 94612. |
| Mar 27, 2026 | PS0002 | $0 | MODIFICATION PS0002 IS TO ISSUE A NO COST TIME EXTENSION TO ALLOW FOR PROJECT CONTINUATION FOR THE DELLUMS PIPE FITTING REPLACEMENT AT RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE, 1301 CLAY ST, OAKLAND, CA 94612. |
| Jan 14, 2026 | PS0001 | $0 | MODIFICATION PS0001 IS TO ISSUE A PARTIAL ON-SITE NTP TO ALLOW CONTRACTOR TO VERIFY THE QUANTITY OF COUPLINGS/VALVES TO BE REPLACED SO MATERIALS CAN BE ORDERED FOR THE DELLUMS PIPE FITTING REPLACEMENT PROJECT AT 1301 CLAY ST, OAKLAND, CA 94612 |
| Sep 16, 2025 | 0 | $1.3M | DESIGN BUILD R9 IDIQ REPAIR AND ALTERATION PROJECT - DELLUMS PIPE FITTING REPLACEMENT TO BE PERFORMED AT RONALD V. DELLUMS FEDERAL BUILDING AND U.S. COURTHOUSE 1301 CLAY ST, OAKLAND, CA 94612 |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2026-10-26 (1 days from calculation)
- +35 points
- 27 historical awards in this buyer and category group
- +15 points
- 5 recorded award transactions
- +10 points
- Latest award action: 2026-07-10
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Verify whether remaining options may extend performance beyond the current end date.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.