Federal contract award
47PM0225C0011
THE DEPARTMENT OF LABOR, REQUESTS THE REPAIR/REPLACE OF LEANING LIMESTONE OUTER PANEL ON THE 2ND ST. SIDE AS PER THE SCOPE OF WORK DATED MARCH 18,2025 LOCATED AT 200 CONSTITUTION AVE. NW WASHINGTON DC 20210
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R11 CONSTRUCTION SERVICES DIVSION CTR 2 |
| NAICS | 236220 — Commercial and Institutional Building Construction |
| PSC | Z2AA — REPAIR OR ALTERATION OF OFFICE BUILDINGS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $135.5K |
| Current contract value | $135.5K |
| Potential contract value / ceiling | $135.5K |
| Start date | May 2, 2025 |
| Current end date | Dec 8, 2025 |
| Potential end date | Jan 8, 2026 |
| Latest award activity | Jul 7, 2025 |
| Source loaded | Aug 15, 2026 |
Funding and modification history
Showing the latest 2 of 2 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 7, 2025 | PS0002 | $15.6K | DRAINAGE PIPE INSTALLATION BEHIND LIMESTONE WALL IS REQUIRED FOR INTEGRITY OF STRUCTURE. |
| May 5, 2025 | 0 | $119.9K | THE DEPARTMENT OF LABOR, REQUESTS THE REPAIR/REPLACE OF LEANING LIMESTONE OUTER PANEL ON THE 2ND ST. SIDE AS PER THE SCOPE OF WORK DATED MARCH 18,2025 LOCATED AT 200 CONSTITUTION AVE. NW WASHINGTON DC 20210 |
Research next steps
- Verify whether remaining options may extend performance beyond the current end date.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.