Federal contract award

47PM0324F0011

THIS IS A DESIGN-BID-BUILD PROJECT FOR THE HERBERT C. HOOVER BUILDING (HCHB) TO CONVERT 33,209SF OF THE BASEMENT, AN UNCONDITIONED SHELL, INTO A CONSOLIDATED SCIF (TO INCLUDE IT, SECURITY SYSTEMS, EQUIPMENT, FURNITURE, AND AUDIO VISUAL).

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyGeneral Services Administration
OfficePBS R11 CONSTRUCTION SERVICES DIVSION CENTER 3
NAICS541310 — Architectural Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicle47PF0023D0003
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.8M
Current contract value$1.8M
Potential contract value / ceiling$1.8M
Start dateMay 29, 2024
Current end dateNov 30, 2027
Potential end dateNov 30, 2027
Latest award activityAug 26, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 26, 2026PS0005$49.0KARCHITECT AND ENGINEERING SERVICES FOR THE DEPARTMENT OF COMMERCE CONSOLIDATED SCIF PROJECT, AT THE HOOVER FEDERAL BUILDING AT 1401 CONSTITUTION AVENUE. NW, WASHINGTON, DC 20230-0001. THIS MODIFICATION COVERS ADDITIONAL DESIGN SERVICES.
Jun 24, 2026PS0004$0TIME EXTENSION MODIFICATION FOR THE HCHB DEPARTMENT OF COMMERCE CONSOLIDATED SCIF AE DESIGN SERVICES IN WASHINGTON, DC.
Jul 8, 2025PS0003$254.8KMODIFY CONTRACT FOR ADDITIONAL WORK ITEMS 1 AND 2 TO BE COMPLETED AND EXTEND PERIOD OF PERFORMANCE 90 CALENDAR DAYS FOR CONSOLIDATED SCIF AE DESIGN SERVICES GEOTECHNICAL & ADDITIONAL DESIGN SERVICES AT 301 7TH ST SW WASHINGTON, DC 20407
Aug 28, 2024PA0001$0PA MODIFICATION TO CHANGE THE CO PERSONNEL. MODIFIED TO CHANGE THE CONTRACTING OFFICER FROM NICOLE DENT TO HARVELLE FULLER, EFFECTIVE PER THE DATE OF THIS MODIFICATION.
May 24, 20240$1.5MTHIS IS A DESIGN-BID-BUILD PROJECT FOR THE HERBERT C. HOOVER BUILDING (HCHB) TO CONVERT 33,209SF OF THE BASEMENT, AN UNCONDITIONED SHELL, INTO A CONSOLIDATED SCIF (TO INCLUDE IT, SECURITY SYSTEMS, EQUIPMENT, FURNITURE, AND AUDIO VISUAL).

Estimated positioning window

Nov 30, 2026 – May 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-11-30 (401 days from calculation)
+25 points
5 historical awards in this buyer and category group
+15 points
5 recorded award transactions
+10 points
Latest award action: 2026-08-26
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.