Federal contract award
47PM0324F0011
THIS IS A DESIGN-BID-BUILD PROJECT FOR THE HERBERT C. HOOVER BUILDING (HCHB) TO CONVERT 33,209SF OF THE BASEMENT, AN UNCONDITIONED SHELL, INTO A CONSOLIDATED SCIF (TO INCLUDE IT, SECURITY SYSTEMS, EQUIPMENT, FURNITURE, AND AUDIO VISUAL).
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | PBS R11 CONSTRUCTION SERVICES DIVSION CENTER 3 |
| NAICS | 541310 — Architectural Services |
| PSC | C211 — Architect - Engineer Services (including landscaping, interior layout, and designing) |
| Parent award / vehicle | 47PF0023D0003 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.8M |
| Current contract value | $1.8M |
| Potential contract value / ceiling | $1.8M |
| Start date | May 29, 2024 |
| Current end date | Nov 30, 2027 |
| Potential end date | Nov 30, 2027 |
| Latest award activity | Aug 26, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 26, 2026 | PS0005 | $49.0K | ARCHITECT AND ENGINEERING SERVICES FOR THE DEPARTMENT OF COMMERCE CONSOLIDATED SCIF PROJECT, AT THE HOOVER FEDERAL BUILDING AT 1401 CONSTITUTION AVENUE. NW, WASHINGTON, DC 20230-0001. THIS MODIFICATION COVERS ADDITIONAL DESIGN SERVICES. |
| Jun 24, 2026 | PS0004 | $0 | TIME EXTENSION MODIFICATION FOR THE HCHB DEPARTMENT OF COMMERCE CONSOLIDATED SCIF AE DESIGN SERVICES IN WASHINGTON, DC. |
| Jul 8, 2025 | PS0003 | $254.8K | MODIFY CONTRACT FOR ADDITIONAL WORK ITEMS 1 AND 2 TO BE COMPLETED AND EXTEND PERIOD OF PERFORMANCE 90 CALENDAR DAYS FOR CONSOLIDATED SCIF AE DESIGN SERVICES GEOTECHNICAL & ADDITIONAL DESIGN SERVICES AT 301 7TH ST SW WASHINGTON, DC 20407 |
| Aug 28, 2024 | PA0001 | $0 | PA MODIFICATION TO CHANGE THE CO PERSONNEL. MODIFIED TO CHANGE THE CONTRACTING OFFICER FROM NICOLE DENT TO HARVELLE FULLER, EFFECTIVE PER THE DATE OF THIS MODIFICATION. |
| May 24, 2024 | 0 | $1.5M | THIS IS A DESIGN-BID-BUILD PROJECT FOR THE HERBERT C. HOOVER BUILDING (HCHB) TO CONVERT 33,209SF OF THE BASEMENT, AN UNCONDITIONED SHELL, INTO A CONSOLIDATED SCIF (TO INCLUDE IT, SECURITY SYSTEMS, EQUIPMENT, FURNITURE, AND AUDIO VISUAL). |
Estimated positioning window
Nov 30, 2026 – May 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-11-30 (401 days from calculation)
- +25 points
- 5 historical awards in this buyer and category group
- +15 points
- 5 recorded award transactions
- +10 points
- Latest award action: 2026-08-26
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.