Federal contract award
47QFCA20C0019
COSMIC AES SBIR III CONTRACT 47QFCA20C0019. THIS CONTRACT IS FOR OTHER FUNCTIONS.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | General Services Administration |
| Office | GSA FAS AAS FEDSIM |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AC21 — NATIONAL DEFENSE R&D SERVICES; ATOMIC ENERGY DEFENSE ACTIVITIES; BASIC RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | COST PLUS FIXED FEE |
| Obligations | $363.2M |
| Current contract value | $466.3M |
| Potential contract value / ceiling | $466.3M |
| Start date | Jun 11, 2020 |
| Current end date | Jun 10, 2027 |
| Potential end date | Jun 10, 2027 |
| Latest award activity | Aug 31, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 72 of 72 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 31, 2026 | P00071 | $724.6K | USAF USSF COSMIC AES SBIR III |
| Aug 10, 2026 | P00070 | $3.5M | USAF USSF COSMIC AES SBIR III |
| Jul 23, 2026 | P00069 | $0 | USAF USSF COSMIC AES SBIR III |
| Jun 17, 2026 | P00068 | $8.5M | INCREMENTAL FUNDING |
| Jun 9, 2026 | P00067 | $193.2K | INCREMENTAL FUNDING |
| Jun 1, 2026 | P00066 | $6.6M | EXERCISE OPTION. EO 14398 |
| May 14, 2026 | P00065 | $2.9M | INCREMENTAL FUNDING |
| Apr 21, 2026 | P00064 | $610.7K | INCREMENTAL FUNDING |
| Apr 6, 2026 | P00063 | $830.9K | INCREMENTAL FUNDING |
| Mar 13, 2026 | P00062 | $1.6M | INCREMENTAL FUNDING |
| Feb 5, 2026 | P00061 | $-2.1M | USAF USSF COSMIC AES SBIR III |
| Jan 23, 2026 | P00060 | $676.3K | USAF USSF COSMIC AES SBIR III |
| Dec 10, 2025 | P00059 | $1.1M | USAF USSF COSMIC AES SBIR III |
| Sep 16, 2025 | P00058 | $6.3M | USAF USSF COSMIC AES SBIR III |
| Aug 21, 2025 | P00057 | $3.4M | USAF USSF COSMIC AES SBIR III |
| Jul 17, 2025 | P00056 | $3.9M | USAF USSF COSMIC AES SBIR III |
| Jul 9, 2025 | P00055 | $486.0K | USAF USSF COSMIC AES SBIR III |
| Jun 27, 2025 | P00054 | $9.9M | USAF USSF COSMIC AES SBIR III |
| Jun 9, 2025 | P00053 | $253.0K | USAF USSF COSMIC AES SBIR III THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| May 28, 2025 | P00052 | $8.1M | USAF USSF COSMIC AES SBIR III THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| May 7, 2025 | P00051 | $0 | USAF USSF COSMIC AES SBIR III THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Apr 15, 2025 | P00050 | $12.6M | MOD 50 FOR IF ONLY. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Mar 25, 2025 | P00049 | $2.1M | MOD 49 FOR IF ONLY. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 26, 2025 | P00048 | $3.4M | MOD 48 FOR REALIGNMENT OF FUNDS AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 7, 2025 | P00047 | $5.8M | MOD 47 FOR IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jan 30, 2025 | P00046 | $0 | MOD 46 FOR REALIGNMENT OF FUNDS. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Dec 5, 2024 | P00045 | $1.8M | MOD 45 FOR IF & REALIGN FUNDING. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Nov 6, 2024 | P00044 | $6.8M | MOD 44 FOR IF & REALIGN CEILING. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 30, 2024 | P00043 | $275.9K | MOD 43 FOR IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 23, 2024 | P00042 | $2.1M | MOD 42 FOR IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 13, 2024 | P00041 | $3.4M | MOD 41 IF AND UPDATE COR. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Aug 30, 2024 | P00040 | $0 | MOD 40 REALIGN EXPIRED FUNDS OY1 AND OY3. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jul 15, 2024 | P00039 | $10.8M | MOD 39 REALIGN FUNDING AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jun 7, 2024 | P00038 | $12.6M | OPTION EXERCISE AND ADD CLAUSE 52.204-30 TO THIS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE III EFFORT WHICH IS A FOLLOW ON TO COSMIC SBIR PHASE I AND II CONTRACTS ISSUED UNDER THE SBIR TOPIC NUMBERS AF171-069 AND AF192-001. |
| Apr 22, 2024 | P00037 | $0 | THIS SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE III EFFORT IS A FOLLOW ON TO COSMIC SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Apr 10, 2024 | P00036 | $2.3M | THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Mar 21, 2024 | P00035 | $3.9M | THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 26, 2024 | P00034 | $0 | THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 16, 2024 | P00033 | $12.0M | USAF USSF COSMIC AES SBIR III |
| Dec 21, 2023 | P00032 | $3.9M | THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Dec 7, 2023 | P00031 | $0 | MOD 31 FOR FUND REALIGNMENT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Nov 7, 2023 | P00030 | $23.2M | MOD 30 FOR IF AND FUND REALIGNMENT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Oct 20, 2023 | P00029 | $338.2K | MOD 29 FOR IF AND FUND REALIGNMENT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 21, 2023 | P00028 | $12.7M | MOD 28 IF, DPAS, UPDATE COR. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jun 30, 2023 | P00027 | $13.6M | MOD 27 FOR IF, ADD CLAUSE AND SBIR DISCLOSURE. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jun 9, 2023 | P00026 | $19.1M | KRATOS MOD 26 TO EXERCISE OP3. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| May 22, 2023 | P00025 | $-3.4M | KRATOS MOD 25 FOR IF AND ADD ACOR. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Apr 7, 2023 | P00024 | $14.5M | KRATOS S2 MOD 24 FOR IF, CEILING REALIGNMENT AND ADMIN CHANGE. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 24, 2023 | P00023 | $7.8M | KRATOS S2 MOD 23 FOR IF, CEILING REALIGNMENT AND ADMIN CHANGE. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 9, 2023 | P00022 | $8.5M | KRATOS S2 SBIR III MOD 22 FOR IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jan 10, 2023 | P00021 | $1.4M | KRATOS S2 SBIR III MOD 21 DEOB FUNDING AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Nov 14, 2022 | P00020 | $14.6M | KRATOS S2 SBIR III MOD 20 TO DEOB FUNDING AND UPDATE CONTRACT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Oct 25, 2022 | P00019 | $0 | KRATOS S2 SBIR III MOD 19 FOR FUNDING REALIGNMENT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 12, 2022 | P00018 | $115.9K | KRATOS S2 SBIR III MOD 18 FOR REALIGNMENT AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 6, 2022 | P00017 | $8.7M | KRATOS S2 SBIR III MOD 17 IS FOR REALIGNMENT AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jul 29, 2022 | P00016 | $13.9M | KRATOS S2 SBIR III MOD 16 FOR CEILING REALIGN AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jun 10, 2022 | P00015 | $10.7M | USAF USSF COSMIC AES SBIR III MOD 15 IS FOR IF AND EXERCISE OP2. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Jun 8, 2022 | P00014 | $20.7M | MOD 14 IS FOR CEILING AND FUNDING REALIGNMENTS AND IF. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Apr 14, 2022 | P00013 | $640.0K | USAF USSF COSMIC AES SBIR III MOD 13 IS FOR IF AND NAME CHANGE. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Mar 25, 2022 | P00012 | $12.2M | USAF USSF COSMIC AES SBIR III MOD 12 IS FOR IF AND UPDATE FEDSIM COR. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR R&D TOPIC NUMBERS AF171-069 AND AF192-001. |
| Feb 3, 2022 | P00011 | $8.5M | COSMIC AES SBIR III MOD 11 FOR IF AND CEILING REALIGNMENT. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Dec 20, 2021 | P00010 | $3.0M | USAF USSF COSMIC AES SBIR III MOD 10 IS FOR INCREMENTAL FUNDING. THIS SBIR PHASE III EFFORT IS A FOLLOW ON TO COSMIC AES SBIR PHASE I AND PHASE II CONTRACTS ISSUED UNDER THE SBIR RESEARCH AND DEVELOPMENT (R&D) TOPIC NUMBERS AF171-069 AND AF192-001. |
| Nov 10, 2021 | P00009 | $0 | USAF USSF COSMIC AES SBIR III MOD 09 IS FOR THE EXECUTIVE ORDER 14042 BY ADDING IN FAR CLAUSE 52.223-99 AND DFARS CLAUSE 252.223-7999. THIS SBIR PHASE III EFFORT IS A FOLLOW ON PHASE I/II CONTRACTS TOPIC NUMBERS AF171-069 AND AF192-001. |
| Sep 29, 2021 | P00008 | $2.9M | MIGRATED 35155 USAF USSF COSMIC AES SBIR III. MODIFICATION 08 IS FOR REALIGNMENT OF CEILING AND FUNDS. |
| Jul 9, 2021 | P00007 | $-4.7M | MIGRATED 35155 USAF USSF COSMIC AES SBIR III. MODIFICATION 07 WAS TO DEOBLIGATE FUNDS. |
| Jun 10, 2021 | P00006 | $62.2K | MIGRATED 35155 USAF USSF COSMIC AES SBIR III. MODIFICATION 06 WAS FOR INCREMENTAL FUNDING. |
| Jun 9, 2021 | P00005 | $0 | MIGRATED 35155 USAF USSF COSMIC AES SBIR III. MODIFICATION 12 IS A TRUE UP MOD. NO CHANGES TO CEILING OR FUNDING. |
| Mar 18, 2021 | P00004 | $10.8M | MODIFICATION 04 FOR INCREMENTAL FUNDING AND ADDED IN SOFA CONTRACT CLAUSES. |
| Dec 31, 2020 | P00003 | $10.5M | INCREMENTAL FUNDING MODIFICATION 03. |
| Sep 25, 2020 | P00002 | $1.7M | FUNDING AND CEILING REALIGNMENT |
| Aug 24, 2020 | P00001 | $1.2M | COSMIC AES CONTRACT 47QFCA20C0019, MODIFICATION 01 FOR IF, CEILING REALIGN, UPDATE CLAUSE. |
| Jun 11, 2020 | 0 | $8.8M | COSMIC AES SBIR III CONTRACT 47QFCA20C0019. THIS CONTRACT IS FOR OTHER FUNCTIONS. |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
55/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 55/100. Available recorded signals: 50 points.
- Contract end 2027-06-10 (228 days from calculation)
- +35 points
- 1 historical awards in this buyer and category group
- +0 points
- 72 recorded award transactions
- +10 points
- Latest award action: 2026-08-31
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.