Federal contract award
68HE0320F0072
TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Environmental Protection Agency |
| Office | REGION 3 CONTRACTING OFFICE |
| NAICS | 541620 — Environmental Consulting Services |
| PSC | F108 — Hazardous Substance Removal, Cleanup, and Disposal Services and Operational Support |
| Parent award / vehicle | 68HE0320D0003 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $8.4M |
| Current contract value | $8.4M |
| Potential contract value / ceiling | $8.4M |
| Start date | Aug 6, 2020 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | Jul 21, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 83 of 83 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 9, 2026 | P00082 | $96.4K | MODIFICATION P00082 ADDS FUNDING IN THE AMOUNT OF $96,357.60 TO EXPAND THE SCOPE TO INVESTIGATE, CHARACTERIZE, AND DOCUMENT BURIED DRUMS AT THE LOWER DARBY CREEK AREA SITE. TD NUMBER: T605-26-07-001 TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACT |
| Jul 21, 2026 | P00081 | $50.4K | MODIFICATION P00081 ADDS FUNDING IN THE AMOUNT OF $50,361.42 TO INVESTIGATE, CHARACTERIZE, AND DOCUMENT BURIED DRUMS AT THE LOWER DARBY CREEK AREA SITE. TD NUMBER: T605-26-07-001 TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SU |
| Jul 7, 2026 | P00080 | $0 | MODIFICATION P00080 EXTENDS THE TASK ORDER AND ITS ASSOCIATED TECHNICAL DIRECTIONS FOR FOR SIX (6) MONTHS FROM 07/01/2026 TO 12/31/2026 IAW FAR PART 6.103-2 (DEVIATION), UNUSUAL AND COMPELLING URGENCY TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT A |
| Jun 10, 2026 | P00079 | $6.7K | MODIFICATION P00079 ADDS FUNDING IN THE AMOUNT OF $6,689.00 FOR TECHNICAL ASSISTANCE TO COMPLETE THE GROUNDWATER SAMPLING TRIP REPORT (1, 4-DIOXANE AND PFAS) AT THE GREENWOOD CHEMICAL (03P5) OU00 SITE TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT A |
| Feb 6, 2026 | P00078 | $0 | MODIFICATION P00078 EXTENDS THE PERIOD OF PERFORMANCE FOR FIVE MONTH FROM 01/31/2026 TO 06/30/2026. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI) |
| Jan 15, 2026 | P00076 | $5.9K | MODIFICATION P00076 ADDS FUNDING IN THE AMOUNT OF $5,941.00 FOR CONTRACTOR SUPPORT TO PERFORM FOLLOW-UP GROUNDWATER SAMPLING TO COMPLY WITH FIVE YEAR REVIEW RECOMMENDATION AT THE GREENWOOD CHEMICAL 03P5 OU00 SITE. TASK ORDER #05 - REMEDIAL ASSESS |
| Jan 15, 2026 | P00077 | $35.3K | MODIFICATION P00077 ADDS FUNDING IN THE AMOUNT OF $35,333.86 TO CONTINUE FIELD WORK FOR COLLECTION OF DRINKING WATER PRODUCTION WELL SAMPLES AND DISTRIBUTION SYSTEM POINT OF ENTRY SAMPLES, AND TO ARRANGE FOR TIER IV ANALYTICAL SERVICES AT THE EAST BA |
| Dec 29, 2025 | P00075 | $0 | MODIFICATION P00075 EXTENDS THE PERIOD OF PERFORMANCE FOR ONE MONTH FROM 12/31/2025 TO 01/31/2026. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI) |
| Sep 25, 2025 | P00074 | $32.2K | MODIFICATION P00074 ADDS FUNDING IN THE AMOUNT OF $32,151.34 FOR THE COLLECTION OF SAMPLES FROM MUNICIPAL AND COMMERCIAL DRINKING WATER SUPPLY WELLS AT THE EAST BASIN ROAD (A36K) OU01 SITE. TD NUMBER: T605-25-09-002 TASK ORDER #05 - REMEDIAL ASSES |
| Sep 17, 2025 | P00073 | $52.8K | MODIFICATION P00073 ADDS FUNDING IN THE AMOUNT OF $52,834.00 FOR CONTRACTOR SUPPORT TO PERFORM GROUNDWATER SAMPLING FOR THE PRESENCE OF PFAS AT THE GREENWOOD CHEMICAL 03P5 OU00 SITE AS A FOLLOW-UP RECOMMENDATION DOCUMENTED IN THE FIVE-YEAR REVIEW. TD |
| Jul 22, 2025 | P00072 | $0 | MODIFICATION P00072 CORRECTS THE TASK ORDER CEILING AMOUNT THAT WAS ENTERED IN ERROR UNDER MODIFICATION P00071. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI) |
| Jul 17, 2025 | P00071 | $52.3K | MODIFICATION P00071 EXTENDS THE TASK ORDER END DATE FROM 06/30/2025 TO 12/31/2025; ADDS FUNDING IN THE AMOUNT OF $52,254; AND UPDATES THE PRIMARY COR/INVOICE APPROVER AND ALTERNATE TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 |
| May 22, 2025 | P00070 | $0 | MODIFICATION P00070 CHANGES THE ALTERNATE TASK ORDER COR AND ALTERNATE INVOICE APPROVER TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SUPERFUND TECHNICAL ASSESSMENT & RESPONSE TEAM VI (START VI) |
| Apr 9, 2025 | P00069 | $5.3K | MODIFICATION P00069 ADDS FUNDING FOR ADMINISTRATIVE SUPPORT TO ARRANGE FOR, ANNOUNCE, AND DOCUMENT A ROD AMENDMENT PUBLIC MEETING AT THE SHARON STEEL FAIRMONT COKE (036E) OU01. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES REGION 3 SUPE |
| Mar 26, 2025 | P00068 | $1.5K | MODIFICATION P00068 FUNDING TO PROCURE A STENOGRAPHER OR OTHER RECORDING/TRANSCRIPTION SERVICE TO DOCUMENT THE PUBLIC MEETING FOR THE STRASBURG LANDFILL SITE ON APRIL 2, 2025 IAW WITH THE SOW AND TD NUMBER T605-23-10-001. TASK ORDER #05 - REMEDIAL |
| Mar 25, 2025 | P00067 | $41.7K | MODIFICATION P00067 PROVIDES FUNDING IN THE AMOUNT OF $41,696.00 TO PROVIDE TECHNICAL SUPPORT FOR PFAS SAMPLING ACTIVITIES AT THE HIDDEN LANE LANDFILL (03MN) OU01 SITE IN SUPPORT OF TD NUMBER T605-24-03-001. TASK ORDER #05 - REMEDIAL ASSESSMENT S |
| Dec 4, 2024 | P00065 | $87.6K | MODIFICATION P00065 PROVIDES FUNDING IN THE AMOUNT OF $87,588.00 TO PERFORM A THIRD-ROUND SAMPLING OF RESIDENTIAL MONITORING WELLS FOR PFAS CONTAMINATION AT THE STRASBURG LANDFILL (03T6) OU00 SITE IN SUPPORT OF TD NUMBER T605-23-10-001. |
| Dec 4, 2024 | P00066 | $63.0K | MODIFICATION P00066 PROVIDES FUNDING IN THE AMOUNT OF $63,035.00 TO PROVIDE TECHNICAL SUPPORT FOR PFAS SAMPLING INCLUDING RESIDENTIAL AND MONITORING WELL SAMPLING AT THE HIDDEN LANE LANDFILL (03MN) OU01 SITE IN SUPPORT OF TD NUMBER T605-24-03-001. |
| Sep 27, 2024 | P00064 | $0 | MODIFICATION P00064 IS AN ADMINISTRATIVE MODIFICATION THAT CORRECTS A TYPO/ERROR UNDER MODIFICATION P00063 ON PAGE 3, PARAGRAPH A. |
| Sep 26, 2024 | P00063 | $35.6K | MODIFICATION P00063 PROVIDES FUNDING IN THE AMOUNT OF 35,630.00 FOR PROJECT COMPLETION INCLUDING ONSITE SUPPORT UNTIL NOVEMBER 2024 AND RACR AT THE HIDDEN LANE LANDFILL (03MN) OU03 SITE IN SUPPORT OF TD NUMBER T605-23-09-001. |
| Sep 23, 2024 | P00062 | $55.1K | MODIFICATION P00062 PROVIDES FUNDING IN THE AMOUNT OF $55,118.00 FOR TECHNICAL SUPPORT FOR PFAS SAMPLING INCLUDING RESIDENTIAL AND MONITORING WELL SAMPLING AT THE HIDDEN LANE LANDFILL (03MN) OU01 SITE IN SUPPORT OF TD NUMBER T605-24-03-001. |
| Sep 10, 2024 | P00061 | $899.2K | MODIFICATION P00061 PROVIDES FUNDING IN THE AMOUNT OF $899,208.00 TO CONTINUE REMEDIAL DESIGN IMPLEMENTATION SUPPORT FOR ONGOING ACTION, GROUNDWATER INVESTIGATION, MONITORING WELL INSTALLATION, MODELLING, AND REPORT DEVELOPMENT FOR NTCRA AT THE HAVER |
| Sep 5, 2024 | P00060 | $100.0K | MODIFICATION P00060 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $100,000.00 FOR INSTALLATION OF MONITORING WELLS AND SITE-WIDE GROUNDWATER SAMPLING AT THE SAFETY LIGHT (03DG) OU02 SITE IN SUPPORT OF TD T605-22-05-001. |
| Aug 21, 2024 | P00059 | $10.0K | MODIFICATION P00059 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $10,000.00 TO CONTINUE RESIDENTIAL PFAS SAMPLING AT THE CHEM-FAB (03DR) OU02 SITE. |
| Aug 9, 2024 | P00058 | $47.0K | MODIFICATION P00058 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $46,952.00 TO COMPLETE AN ADDITIONAL ROUND OF ASBESTOS AIR MONITORING, WHICH INCLUDES STATIONARY AIR MONITORS AND ACTIVITY-BASED SAMPLING AT THE AMBLER ASBESTOS (0396) OU00 SITE. |
| Jul 15, 2024 | P00056 | $11.0K | MODIFICATION P00056 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $10,977.00 FOR RESIDENTIAL PFAS SAMPLING AT THE CHEM-FAB (03DR) OU02 SITE. |
| Jul 15, 2024 | P00057 | $69.0K | MODIFICATION P00057 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $68,999.00 FOR TIER IV ANALYTICAL COSTS AND ON-SITE SUPPORT FOR PROJECT EXTENSION DUE TO DELAYS IN T&D AND ADDITIONAL VOLUME OF MATERIAL EXCAVATED AT THE HIDDEN LANE LANDFILL (03MN |
| Apr 16, 2024 | P00055 | $299.6K | MODIFICATION P00055 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $299,598.00 FOR REMEDIAL DESIGN IMPLEMENTATION SUPPORT FOR ONGOING ACTION, GROUNDWATER INVESTIGATION, MONITORING WELL INSTALLATION, MODELLING AND REPORT DEVELOPMENT FOR NTCRA AT THE HA |
| Apr 10, 2024 | P00054 | $98.3K | MODIFICATION P00053 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $260,000.00 FOR NEW TD FUNDING FOR RA OVERSIGHT, SAMPLING AND TECHNICAL ASSISTANCE AT THE RYLAND RD ARSENIC SITE (03G5) OU01 SITE. (TD NUMBER: UNKNOWN) TASK ORDER #05 - REMEDIAL ASS |
| Mar 12, 2024 | P00053 | $260.0K | MODIFICATION P00053 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $260,000.00 FOR NEW TD FUNDING FOR RA OVERSIGHT, SAMPLING AND TECHNICAL ASSISTANCE AT THE RYLAND RD ARSENIC SITE (03G5) OU01 SITE. (TD NUMBER: UNKNOWN) TASK ORDER #05 - REMEDIAL ASS |
| Mar 11, 2024 | P00052 | $29.9K | MODIFICATION P00052 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $29,856.00 FOR NEW TD TO PROVIDE THE NECESSARY TECHNICAL SUPPORT TO EPA FOR PFAS SAMPLING AT THE HIDDEN LANE LANDFILL (03MN) OU01 SITE. (TD NUMBER: UNKNOWN) TASK ORDER #05 - REMEDIA |
| Feb 14, 2024 | P00051 | $23.8K | MODIFICATION P00051 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $23,814.00 FOR SAMPLING OF LANDFILL MONITORING WELLS FOR PFAS CONTAMINATION IN OU4 (GROUNDWATER) AT THE STRASBURG LANDFILL (03T6) OU00. (TD NUMBER: T605-23-10-001) TASK ORDER #05 - |
| Feb 13, 2024 | P00050 | $26.3K | MODIFICATION P00050 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $26,268.00 FOR AN ADDITIONAL ROUND OF PFAS RESIDENTIAL WELL SAMPLING TO INCLUDE ANALYTES AT THE MOYERS LANDFILL (0353) OU00 SITE. (TD NUMBER: T605-23-01-001) TASK ORDER #05 - REMEDI |
| Jan 25, 2024 | P00048 | $25.0K | MODIFICATION P00048 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $25,000.00 FOR THE ADDITIONAL SUBCONTRACTING COSTS ASSOCIATED WITH GEOPHYSICAL DRILLING AND ANALYTICAL FOR DEEP EXCAVATION PLAN AT THE HIDDEN LANE LANDFILL (03MN) OU03 SITE. (TD NUMBER |
| Jan 25, 2024 | P00049 | $199.8K | MODIFICATION P00049 IS ISSUED TO PROVIDE FUNDING IN THE AMOUNT OF $199,842.00 FOR GROUNDWATER SAMPLING IN SUPPORT OF THE OU02 RIFS AT THE SAFETY LIGHT (03DG) OU02 SITE. (TD NUMBER: T605-22-05-001). TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACT |
| Jan 17, 2024 | P00047 | $199.6K | MODIFICATION P00047 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $199,567.00 FOR SOIL, SEDIMENT AND SURFACE WATER SAMPLING IN SUPPORT OF THE OU03 RI/FS AT THE SAFETY LIGHT (03DG) OU03 SITE. (TD NUMBER: T605-22-08-001). REFERENCE TD |
| Dec 13, 2023 | P00045 | $250.0K | MODIFICATION P00045 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $250,000.00 FOR SOIL, SEDIMENT, SURFACE WATER SAMPLING IN SUPPORT OF OU3 RI/FS AT THE SAFETY LIGHT OU03 SITE. REFERENCE TD NUMBER T605-22-08-001 TASK ORDER #05 - REMED |
| Dec 13, 2023 | P00046 | $54.9K | MODIFICATION P00046 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $54,887.00 FOR THE SAMPLING OF LANDFILL MONITORING WELLS FOR PFAS CONTAMINATION IN GROUNDWATER AT THE STRASBURG LANDFILL (03T6) OU00 SITE. REFERENCE TD NUMBER T605-23-10- |
| Nov 29, 2023 | P00044 | $51.0K | MODIFICATION P00044 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $51,046.00 TO PROVIDE ADDITIONAL FUNDING FOR START LOE HOURS FOR RD REVISIONS AND ADDITIONAL SITE WORK PRIOR TO EXCAVATION AT THE RYELAND ROAD (03G5) OU01 SITE. TASK ORD |
| Nov 3, 2023 | P00043 | $22.4K | MODIFICATION P00043 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $22,413.00 TO PROVIDE ADDITIONAL FUNDING FOR START LOE HOURS FOR THE REMEDIAL DESIGN COMPLETION AT THE RYELAND ROAD (03G5) OU01 SITE. TASK ORDER #05 - REMEDIAL ASSESSMEN |
| Oct 23, 2023 | P00042 | $56.6K | MODIFICATION P00042 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $56,626.00 TO PROVIDE NECESSARY TECHNICAL SUPPORT AT THE STRASBURG LANDFILL (03H6) OU00 SITE FOR SAMPLING OF LANDFILL MONITORING WELLS FOR PFAS CONTAMINATION IN GROUNDWATER |
| Sep 13, 2023 | P00041 | $295.8K | MODIFICATION P00041 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $295,781.00 TO PROVIDE NECESSARY TECHNICAL SUPPORT TO EPA THROUGHOUT THE REMEDIAL ACTION (RA) AT THE HIDDEN LANE LANDFILL OU-3 SUPERFUND SITE IN STERLING, LOUDOUN COUNTY, V |
| Sep 11, 2023 | P00039 | $139.2K | MODIFICATION P00039 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $139,157.00 FOR ADDITIONAL RESIDENTIAL PFAS SAMPLE COLLECTIONS AND TO INSTALL AND SAMPLE SIX TEMPORARY WELLS ON OR AROUND THE PROPERTY AT THE MOYERS LANDFILL SITE. AS A RE |
| Sep 11, 2023 | P00040 | $1.0K | MODIFICATION P00040 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $1,014.00 TO FUND 12 ADDITIONAL LABOR HOURS FOR THE GIS/MAPPING SPECIALIST TO COMPLETE THE EE/CA AT THE BEAR CREEK SEDIMENTS SITE. TASK ORDER #05 - REMEDIAL ASSESSMENT S |
| Jul 27, 2023 | P00038 | $27.0K | MODIFICATION P00038 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $27,000.00 TO FUND UNEXPECTED ANALYTICAL COST INCREASE ASSOCIATED WITH AMBIENT AIR AND ACTIVITY-BASED SAMPLING AT THE AMBLER ASBESTOS SITE. AS A RESULT OF THIS MODIFICATION |
| Jul 26, 2023 | P00037 | $4.4K | MODIFICATION P00037 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $4,432.00 FOR TECH ASSIST TO INCREASE GIS ENVIRONMENTAL TECHNICIAN LOE AND COVER 3 ADDITIONAL MOBILIZATIONS FOR SAMPLING PURPOSES. AS A RESULT OF THIS MODIFICATION, THE TAS |
| Jun 23, 2023 | P00036 | $0 | MODIFICATION P00036 IS ISSUED TO CORRECT ERRORS IN CDW BY REMOVING THE SPECIAL CHARACTERS IN DESCRIPTION BOX OF THE TASK ORDER'S LINE ITEMS. THE TASK ORDER CEILING REMAINS UNCHANGED AT $4,651,851.06. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPO |
| Jun 16, 2023 | P00035 | $24.0K | MODIFICATION P00035 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $24,000.00 FOR THE COMPLETION OF EE/CA AND PROVIDE TECHNICAL SUPPORT FOR EE/CA RELATED TO SEDIMENT REMEDIATION AT THE BEAR CREEK SEDIMENTS SITE. AS A RESULT OF THIS MODIFIC |
| Jun 7, 2023 | P00034 | $8.6K | MODIFICATION P00034 IS ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $8,558.00 FOR THE PREPARATORY WORK NEEDED TO DELINEATE ARSENIC CONTAMINATION IN SUBSURFACE SOIL IN THE NORTHERN AND SOUTHERN SOURCE AREAS AT THE RYELAND ROAD SITE. AS A RES |
| Apr 28, 2023 | P00033 | $846 | MODIFICATION P00033: THIS TASK ORDER MODIFICATION # P00033 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $845.60 TO INCREASE THE GIS SPECIALIST LOE FOR ADDITIONAL WORK REQUESTED BY THE TECHNICAL TEAM TO SUPPORT PFAS INVESTIGATION I |
| Apr 26, 2023 | P00032 | $650.0K | MODIFICATION P00032: THIS TASK ORDER MODIFICATION # P00032 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $310,688.00 $650,000.00 HAVERTOWN PCP (0354) OU03 SITE FOR REMEDIAL DESIGN IMPLEMENTATION SUPPORT FOR TO #68HE0320F0072 SPECIF |
| Apr 14, 2023 | P00031 | $310.7K | MODIFICATION P00031: THIS TASK ORDER MODIFICATION # P00031 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $310,688.00 SAFETY LIGHT IN SUPPORT OF OU2 AND OU3 FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDAN |
| Mar 3, 2023 | P00030 | $0 | MODIFICATION P00030: THIS TASK ORDER MODIFICATION IS HEREBY ISSUED TO ADD SAMIR SUBEDI AS AN ALT COR/ALT INVOICE APPROVER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Feb 21, 2023 | P00029 | $200.0K | THIS TASK ORDER MODIFICATION # P00029 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $200,000.00 NORTH PENN 6 JW REX PROPERTY FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEM |
| Feb 8, 2023 | P00028 | $37.4K | THIS TASK ORDER MODIFICATION # P00028 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $37,407.00 RYELAND ROAD SITE FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEMENT OF WORK. |
| Jan 25, 2023 | P00027 | $43.9K | THIS TASK ORDER MODIFICATION # P00027 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $43,940.00 MOYERS LANDFILL SITE FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEMENT OF WO |
| Jan 11, 2023 | P00026 | $-39.2K | MODIFICATION P00026 DE-OBLIGATES FUNDS IN THE AMOUNT OF $39,239.54 |
| Nov 29, 2022 | P00025 | $25.8K | THIS TASK ORDER MODIFICATION # P00025 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $25,765.00 SAFETY LIGHT CORP SITE FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEMENT OF |
| Sep 15, 2022 | P00024 | $50.0K | THIS TASK ORDER MODIFICATION # P00024 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $50,000.00 BEAR CREEK SEDIMENT SITE FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEMENT O |
| Aug 23, 2022 | P00023 | $559.6K | THIS TASK ORDER MODIFICATION # P00023 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $359,617.00 FOR RYELAND ROAD ARSENIC SITE AND $200,000.00 FOR NORTH PENN AREA 6 FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN |
| Aug 10, 2022 | P00022 | $449.9K | THIS TASK ORDER MODIFICATION # P00022 IS HEREBY ISSUED TO PROVIDE INCREMENTAL FUNDING IN THE AMOUNT OF $449,912.00FOR TO #68HE0320F0072 SPECIFICALLY IDENTIFIED IN THE TASK ORDER IN ACCORDANCE WITH THE CONTRACT AND STATEMENT OF WORK. AS A RESULT OF TH |
| Aug 1, 2022 | P00021 | $899.2K | MODIFICATION # P00021 IS TO ADD FUNDS IN THE AMOUNT OF $899,239.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Jun 30, 2022 | P00020 | $79.6K | MODIFICATION # P00020 IS TO ADD FUNDS IN THE AMOUNT OF $79,640.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| May 19, 2022 | P00019 | $399.6K | MODIFICATION # P00019 IS TO ADD FUNDS IN THE AMOUNT OF $399,560.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Mar 30, 2022 | P00018 | $254.1K | MODIFICATION # P00018 IS TO ADD FUNDS IN THE AMOUNT OF $254,074.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Mar 15, 2022 | P00017 | $25.0K | MODIFICATION # P00017 IS TO ADD FUNDS IN THE AMOUNT OF $25,000.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Feb 14, 2022 | P00016 | $21.3K | MODIFICATION # P00016 IS TO ADD FUNDS IN THE AMOUNT OF $21,251.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Feb 8, 2022 | P00015 | $34.6K | MODIFICATION # P00015 IS TO ADD FUNDS IN THE AMOUNT OF $34,597.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Jan 28, 2022 | P00014 | $45.0K | MODIFICATION # P00014 IS TO ADD FUNDS IN THE AMOUNT OF $45,000 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Jan 4, 2022 | P00013 | $25.0K | MODIFICATION # P00013 IS TO ADD FUNDS IN THE AMOUNT OF $25,000 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Dec 2, 2021 | P00012 | $15.0K | MODIFICATION # P00012 IS TO ADD FUNDS IN THE AMOUNT OF $15,000 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Sep 23, 2021 | P00011 | $233.0K | MODIFICATION # P00011 IS TO ADD FUNDS IN THE AMOUNT OF 233,038 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 19, 2021 | P00010 | $15.3K | MODIFICATION # P00010 IS TO ADD FUNDS IN THE AMOUNT OF $15,257.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Jul 14, 2021 | P00009 | $73.0K | MODIFICATION # P00009 IS TO ADD FUNDS IN THE AMOUNT OF $73016.00 TO THE TASK ORDER. TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Jan 7, 2021 | P00008 | $75.0K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Nov 10, 2020 | P00007 | $67.5K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Oct 30, 2020 | P00006 | $0 | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Sep 29, 2020 | P00005 | $3.7K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 20, 2020 | P00003 | $54.5K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 20, 2020 | P00004 | $-80.0K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 18, 2020 | P00002 | $10.0K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 6, 2020 | 0 | $0 | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
| Aug 6, 2020 | P00001 | $80.0K | TASK ORDER #05 - REMEDIAL ASSESSMENT SUPPORT ACTIVITIES |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2026-12-31 (67 days from calculation)
- +35 points
- 9 historical awards in this buyer and category group
- +15 points
- 83 recorded award transactions
- +10 points
- Latest award action: 2026-07-21
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +0 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.