Federal contract award
68HE0419F0082
EMERGENCY RESPONSE ACTIVITIES
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Environmental Protection Agency |
| Office | REGION 5 CONTRACTING OFFICE |
| NAICS | 541620 — Environmental Consulting Services |
| PSC | R429 — SUPPORT- PROFESSIONAL: EMERGENCY RESPONSE/DISASTER PLANNING/PREPAREDNESS SUPPORT |
| Parent award / vehicle | 68HE0519D0006 |
| Set-aside | Not reported |
| Pricing type | TIME AND MATERIALS |
| Obligations | $4.1M |
| Current contract value | $4.1M |
| Potential contract value / ceiling | $4.1M |
| Start date | Sep 25, 2019 |
| Current end date | Oct 14, 2026 |
| Potential end date | Oct 14, 2026 |
| Latest award activity | Jul 13, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 96 of 96 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 13, 2026 | P00095 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) - REGION 4. |
| Jan 14, 2026 | P00094 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) - REGION 4. MODIFICATION 94; EXTEND THE PERIOD OF PERFORMANCE FROM 1/14/2026 TO 7/14/2026. |
| Dec 2, 2025 | P00093 | $250.0K | EMERGENCY RESPONSE ACTIVITIES (START V) - REGION 4. MODIFICATION 93; OBLIGATE FUNDS. |
| Jul 18, 2025 | P00092 | $150.0K | EMERGENCY RESPONSE ACTIVITIES (START V) - REGION 4 -TO OBLIGATE FUNDING IN THE AMOUNT OF $150,000.00 |
| Apr 29, 2025 | P00091 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) - REGION 4 -TOLIN ALLOCATION & PERIOD OF PERFORMANCE EXTENSION (P00091) |
| Jan 29, 2025 | P00090 | $0 | 68HE0519D0006 68HE0419F0082 START V; REGION 4 THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR THIS TASK ORDER FROM 1/14/2025 TO 7/14/2025, PER FAR 6.302-2, UNUSUAL AND COMPELLING URGENCY. |
| Jan 6, 2025 | P00089 | $250.0K | 68HE0519D0006 68HE0419F0082 START V; REGION 4. THIS TASK ORDER MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $250,000.00. |
| Sep 19, 2024 | P00088 | $200.0K | 68HE0519D0006 68HE0419F0082 START V; REGION 4. THIS TASK ORDER MODIFICATION IS TO OBLIGATE FUNDING IN THE AMOUNT OF $200,000.00. |
| Jun 6, 2024 | P00087 | $500.0K | 68HE0519D0006 68HE0419F0082 START - THIS MODIFICATION IS TO ADD FUNDING AND EXTEND THE PERIOD OF PERFORMANCE THROUGH 1/14/25. |
| Jan 23, 2024 | P00086 | $300.0K | 68HE0519D0006 68HE0419F0082 START FUNDING ONLY ACTION MODIFICATION |
| Dec 7, 2023 | P00085 | $0 | 68HE0519D0006 68HE0419F0082 START CORRECTIVE MOD |
| Dec 6, 2023 | P00084 | $0 | 68HE0519D0006 68HE0419F0082 START MODIFY/INCREASE TOLINS |
| Oct 24, 2023 | P00083 | $0 | 68HE0519D0006 68HE0419F0082 START TOLIN MOD CLOSEOUT AND INCREASE TOLINS |
| Oct 12, 2023 | P00082 | $0 | 68HE0519D0006 68HE0419F0082 START TOLIN MOD |
| Sep 7, 2023 | P00081 | $0 | ADMINISTRATIVE MODIFICATION |
| Sep 6, 2023 | P00080 | $0 | 68HE0519D0006 68HE0419F0082 START IPP MOD |
| Aug 23, 2023 | P00079 | $0 | INCREASE THE AMOUNT FOR TOLIN 0082059 MOODY LANDFILL FIRE: INITIATE TOLIN 0082067 MCBRIEN ROAD TRACTOR TRAILER INITIATE TOLIN 0082068 APPLEGATE LANE CONTAINERS |
| Jul 25, 2023 | P00078 | $0 | INITIATE TOLIN VALENCE SURFACE TECHNOLOGY FIRE |
| Jul 19, 2023 | P00077 | $300.0K | FUNDING |
| Jun 28, 2023 | P00076 | $0 | INITIATE TOLIN 82064 |
| Apr 28, 2023 | P00075 | $0 | INITIATE TOLIN 82064 |
| Mar 27, 2023 | P00074 | $0 | EXTEND POP DATE AND INCREASE FUNDING ON TOLIN |
| Mar 8, 2023 | P00073 | $0 | EXTEND POP DATES AND INCREASE FUNDING ON TOLINS |
| Mar 2, 2023 | P00072 | $400.0K | FUNDING ACTION |
| Feb 21, 2023 | P00071 | $0 | INITIATE TOLIN 82061 AND TOLIN 82062 |
| Feb 8, 2023 | P00070 | $0 | TOLIN 82059 AND INITIATE TOLIN 82060 |
| Feb 1, 2023 | P00069 | $100.0K | INCREMENTAL FUNDING |
| Jan 24, 2023 | P00068 | $0 | START TOLIN ALLOCATION/INITIATION MOD |
| Dec 8, 2022 | P00067 | $0 | START TOLIN ALLOCATION/INITIATION MOD |
| Nov 29, 2022 | P00066 | $0 | START TOLIN ALLOCATION/INITIATION MOD |
| Nov 9, 2022 | P00065 | $100.0K | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE TASK ORDER IN THE AMOUNT OF $100,000.00. |
| Nov 1, 2022 | P00064 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO: 1) INITIATE TOLIN 82054 - HUDSON BRIDGE ROAD HF IN THE AMOUNT OF $10,000.00; 2) INITIATE TOLIN 82055 - JETT STREET DRUM IN THE AMOUNT OF $10,000.00; 3) INITIATE TOLIN 82056 - OLD CASTLE STYRENE RELEASE IN |
| Oct 13, 2022 | P00063 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INITIATE TOLIN 0082053 CLAIRFIELD SCHOOL MERCURY SPILL IN THE AMOUNT OF $10,000.00. |
| Oct 3, 2022 | P00062 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INITIATE TOLIN 0082052 COUNTY ROAD 139 CYANIDE IN THE AMOUNT OF $10,000.00. |
| Sep 21, 2022 | P00061 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO AMEND TOLIN 0082046 AND INITIATE 2 NEW TOLINS 0082050 AND 0082051. |
| Sep 8, 2022 | P00060 | $0 | THE PURPOSE OF THIS MODIFICATION IS CORRECT THE CEILING FOR TOLIN 0082044 MARION STREET MERCURY AND INITIATE TOLIN 0082049 KING CROYDON COURT MERCURY SPILL. |
| Aug 1, 2022 | P00059 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INITIATE A NEW TOLIN 0082048- CARTERSVILLE TIRE FIRE. |
| Jul 25, 2022 | P00057 | $100.0K | INCREMENTAL FUNDING |
| Jul 25, 2022 | P00058 | $0 | THIS MODIFICATION INCREASES TOLIN 0082045 - AEROSPACE DEFENSE COATINGS RESPONSE FIRE; INITIATE A NEW TOLIN 0082046- CELINA TIRE FIRE; AND INITIATE A NEW TOLIN 0082047 - TAILORED CHEMICAL DUMPING. |
| Jun 23, 2022 | P00056 | $0 | EXTENSION OF POP FOR TOLIN 82040 - WEAVER FERTILIZER PLANT FIRE AND INITIATION FOR TOLIN 82044 - MARION STREET MERCURY AND TOLIN 82045 AEROSPACE DEFENSE COATINGS. |
| Apr 29, 2022 | P00055 | $0 | FUNDING ALLOCATION MOD FOR TOLIN 82027 - SKYBOX CONDOMINIUM AND EXTENSION OF POP FOR TOLIN 82029 |
| Apr 21, 2022 | P00054 | $-10.0K | THE PURPOSE OF THIS MODIFICATION IS TO ADDRESS A PROCESSING ERROR RTP FINANCE MADE WITH MODIFICATION NO. 49 SIGNED ON 2/16/2022. |
| Apr 15, 2022 | P00053 | $0 | TOLIN INITIATION #82043 FOR ASSET RECYCLING AND RECOVERY BATTERY FIRE |
| Mar 15, 2022 | P00052 | $0 | ADMIN MOD |
| Mar 9, 2022 | P00051 | $0 | ADMIN MOD |
| Mar 2, 2022 | P00050 | $0 | ADMIN MOD |
| Feb 16, 2022 | P00048 | $100.0K | FUNDING MOD |
| Feb 16, 2022 | P00049 | $0 | NEW TOLIN FOR HICKS RD MERCURY 82041 |
| Feb 8, 2022 | P00047 | $0 | 68HE0419F0082 TOLIN INITIATION |
| Feb 3, 2022 | P00046 | $400.0K | FUNDING ACTION |
| Jan 26, 2022 | P00045 | $0 | INITIATE TOLIN 82038 |
| Jan 3, 2022 | P00044 | $0 | INCREASE THE ALLOCATION FOR TOLIN 0082035 LAKES PARKWAY LITHIUM BATTERY FIRE AND TOLIN 0082036 MAYFIELD CONSUMER PRODUCTS AND INITIATE A NEW TOLIN 0082037 CITY OF STONE MOUNTAIN ABANDONED DRUM. |
| Dec 21, 2021 | P00043 | $0 | MODIFICATION TO INITIATE NEW TOLINS 0082036 |
| Dec 16, 2021 | P00042 | $0 | MODIFICATION TO MODIFY EXISTING TOLIN 0082027 AND INITIATE 2 NEW TOLINS 0082034 AND 0082035 |
| Dec 8, 2021 | P00040 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE FOR TOLIN 82026, EXTEND THE PERIOD OF PERFORMANCE FOR TOLIN 82029 AND INCREASE THE FUNDING ALLOCATION FOR TOLIN 82029. |
| Dec 8, 2021 | P00041 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO UPDATE THE PERIOD OF PERFORMANCE IN EAS TO REFLECT THE EXTENSION OUTLINED IN THE PRIOR MODIFICATION. |
| Oct 28, 2021 | P00039 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE FUNDING ALLOCATION FOR TOLIN 82025 FLEETWOOD DRIVE DRUM AND INITIATE A NEW TOLIN 82033 - HIAWASSEE PACKAGING FIRE. |
| Sep 8, 2021 | P00038 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INITIATE A NEW TOLIN 82032 - GREEN EARTH LANDFILL FIRE |
| Sep 7, 2021 | P00037 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO INCREASE THE FUNDING ALLOCATION FOR 3 TOLINS: TOLIN 82029 - HICKMAN CREEK FISH KILL; TOLIN 82030 - MONTAUK ROAD MERCURY; AND TOLIN 82031 - ROCK SPRING DRUM. |
| Aug 31, 2021 | P00036 | $300.0K | THE PURPOSE OF THIS MODIFICATION IS TO OBLIGATE FUNDING TO THE TASK ORDER. |
| Aug 25, 2021 | P00035 | $0 | THE PURPOSE OF THIS MODIFICATION IS TO CLOSEOUT 5 TOLINS, INCREASE THE FUNDING ALLOCATION FOR 1 EXISTING TOLIN AND INITIATE 2 NEW TOLINS. |
| Aug 19, 2021 | P00034 | $0 | NEW TOLIN FOR 82029 HICKMAN CREEK FISH KILL AND INCREASE ALLOCATION FOR 82021 KNOX COUNTY DRUM |
| Jul 14, 2021 | P00033 | $0 | NEW TOLIN 82028 STONEWALL TELL ROAD ILLEGAL DUMP |
| Jul 13, 2021 | P00032 | $0 | NEW TOLIN 82027 SKYBOX CONDOMINIUM |
| Jun 23, 2021 | P00031 | $0 | INCREASE ALLOCATION FOR TOLIN 82026 |
| Jun 16, 2021 | P00030 | $0 | INITIATE NEW TOLIN 82026 |
| Jun 15, 2021 | P00029 | $0 | INITIATE NEW TOLIN 82025 |
| Jun 2, 2021 | P00028 | $0 | INCREASE TOLIN 82020 AND INITIATE NEW TOLIN 82024 |
| May 26, 2021 | P00027 | $0 | INITIATE NEW TOLIN 82023 |
| May 11, 2021 | P00026 | $0 | MODIFICATION 25 TO INCREASE FUNDING. EMERGENCY RESPONSE ACTIVITIES (START V) |
| May 4, 2021 | P00025 | $150.0K | MODIFICATION 25 TO INCREASE FUNDING. EMERGENCY RESPONSE ACTIVITIES (START V) |
| Apr 12, 2021 | P00024 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) MODIFICATION TO CLOSE TOLINS 82-002 CUSTOM PLASTICS AND INNOVATION FIRE, 82-003 NORFOLK SOUTHERN TALLOW DISCHARGE AND 82-006 CAMPBELL STREET MERCURY AND REALLOCATE BULK FUNDS. |
| Mar 24, 2021 | P00023 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) MODIFICATION TO CLOSE TOLINS 82-002 CUSTOM PLASTICS AND INNOVATION FIRE, 82-003 NORFOLK SOUTHERN TALLOW DISCHARGE AND 82-006 CAMPBELL STREET MERCURY AND REALLOCATE BULK FUNDS. |
| Feb 24, 2021 | P00022 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) MODIFICATION TO CLOSE TOLINS 82-002 CUSTOM PLASTICS AND INNOVATION FIRE, 82-003 NORFOLK SOUTHERN TALLOW DISCHARGE AND 82-006 CAMPBELL STREET MERCURY AND REALLOCATE BULK FUNDS. |
| Feb 8, 2021 | P00021 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) INCREASE ALLOCATION FOR TOLIN #82013 - NEW HOPE OIL DUMP |
| Jan 20, 2021 | P00020 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) INITIATE NEW TOLIN #82020 CELADON RECYCLING SOLUTIONS IN THE AMOUNT OF $ 15,000.00 |
| Dec 21, 2020 | P00019 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) INITIATE NEW TOLIN #82019 STEVENS ROAD MERCURY IN THE AMOUNT OF $ 10,000.00 |
| Nov 23, 2020 | P00018 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) INCREASE ALLOCATION FOR TOLIN #82-017 AMERICAN CREOSOTE IN THE AMOUNT OF $ 5,195.00 |
| Oct 22, 2020 | P00017 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) INCORPORATE CLAUSE -52.204-25, PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT AND INCORPORATE CLAUSE 1552.232-70, SUBMISSION OF INVOICES |
| Oct 15, 2020 | P00016 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLIN 82018 FOR CSX DERAILMENT AT LILBURN. |
| Oct 9, 2020 | P00015 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLIN 82017 FOR POSSIBLE RELEASE AT AMERICAN CREOSOTE SITE. |
| Sep 24, 2020 | P00014 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLIN 82015. |
| Aug 27, 2020 | P00013 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLIN 82015. |
| Aug 25, 2020 | P00012 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO INCREASE ALLOCATION FOR TOLINS 82008 AND 82013. |
| Aug 13, 2020 | P00011 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO INITIATE NEW TOLIN #82013. |
| Jul 24, 2020 | P00010 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO INITIATE NEW TOLIN #82013. |
| Jul 1, 2020 | P00009 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLINS #82010 GREENSBORO TRICHLOROACETALDEHYDE AND #82011 CATES RIDGE ROAD MERCURY, AND MODIFIES TOLIN #82005 MONTCO RESEARCH PRODUCTS. THE TOLIN FORMS FOR EACH |
| Apr 17, 2020 | P00008 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) THE PURPOSE OF THIS MODIFICATION IS TO ISSUE NEW TOLINS #82010 GREENSBORO TRICHLOROACETALDEHYDE AND #82011 CATES RIDGE ROAD MERCURY, AND MODIFIES TOLIN #82005 MONTCO RESEARCH PRODUCTS. THE TOLIN FORMS FOR EACH |
| Mar 19, 2020 | P00007 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) FUNDING ALLOCATION FOR PINE RIDGE TRUCKING TOLIN #82008 IN THE AMOUNT OF $20,000.00(BASE) + $29,930.00(AMEND 1)FOR A TOTAL OF $49,930.00 AND BALDRIGE EXPLOSION TOLIN #82009 IN THE AMOUNT OF $20,000.00. |
| Jan 29, 2020 | P00006 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) FUNDING ALLOCATION FOR TOLIN 82-007 IN THE AMOUNT OF $20,000.00 |
| Nov 26, 2019 | P00005 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) FUNDING ALLOCATION FOR TOLIN 82-003 IN THE AMOUNT OF $5,000.00 |
| Nov 15, 2019 | P00004 | $0 | EMERGENCY RESPONSE ACTIVITIES (START V) FUNDING ALLOCATION FOR TOLIN 82-003 IN THE AMOUNT OF $5,000.00 |
| Oct 29, 2019 | P00003 | $0 | EMERGENCY RESPONSE ACTIVITIES |
| Oct 17, 2019 | P00002 | $0 | EMERGENCY RESPONSE ACTIVITIES |
| Sep 27, 2019 | P00001 | $200.0K | EMERGENCY RESPONSE ACTIVITIES |
| Sep 25, 2019 | 0 | $300.0K | EMERGENCY RESPONSE ACTIVITIES |
Research next steps
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.