Federal contract award

68HE0923F0072

THE CONTRACTOR SHALL SUPPORT REQUIREMENTS FOR DEVELOPING A CONCEPTUAL SITE MODEL (CSM), A REMEDIAL INVESTIGATION (RI), A RISK ASSESSMENT (RA), AND A FEASIBILITY STUDY (FS), COLLECTIVELY REFERRED TO AS AN RI/FS, AT THE LUKACHUKAI MOUNTAINS MINING DIST

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyEnvironmental Protection Agency
OfficeREGION 9 CONTRACTING OFFICE
NAICS541620 — Environmental Consulting Services
PSCB510 — Environmental Studies and Assessments
Parent award / vehicle68HE0923D0002
Set-asideNot reported
Pricing typeTIME AND MATERIALS
Obligations$6.5M
Current contract value$6.5M
Potential contract value / ceiling$6.5M
Start dateAug 16, 2023
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityJul 10, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 9 of 9 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 10, 2026P00009$450.0KTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO INCREASE THE LEVEL-OF-EFFORT AND FUNDING; TO 16 UNDER RAES 2 CONTRACT #68HE0923D0002.
Dec 5, 2025P00008$0THE PURPOSE OF THIS NO-COST, BILATERAL MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE; TO 16 UNDER RAES 2 CONTRACT #68HE0923D0002.
May 22, 2025P00007$1.5MTHE PURPOSE OF THIS BILATERAL MODIFICATION IS TO ADD SCOPE AND FUNDING TO TO 16 UNDER RAES 2 CONTRACT #68HE0923D0002.
Aug 2, 2024P00005$0THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO REMOVE THE ALTERNATE TOCOR FOR TO 16 UNDER RAES 2 CONTRACT #68HE0923D0002.
May 31, 2024P00004$0THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO CHANGE THE PRIMARY TOCOR UNDER RAES 2 CONTRACT #68HE0923D0002.
May 29, 2024P00003$0THE PURPOSE OF THIS UNILATERAL MODIFICATION IS TO CHANGE THE PRIMARY AND ALTERNATE TOCORS UNDER RAES 2 CONTRACT #68HE0923D0002.
May 6, 2024P00002$3.2MTHE PURPOSE OF THIS MODIFICATION IS TO EXTEND THE POP AND ADD TASKS AND FUNDING TO SUPPORT FOR PHASE 2 OF THE LUKACHUKAI MOUNTAINS MINING DISTRICT (LLMD) PROJECT INCLUDING CSM,RI/FS UNDER RAES 2 CONTRACT #68HE0923D0002.
Dec 21, 2023P00001$896.8KTHE PURPOSE OF THIS MODIFICATION IS TO ADD FUNDING FOR THE CONTRACTOR TO SUPPORT REQUIREMENTS FOR DEVELOPING A CONCEPTUAL SITE MODEL (CSM), A REMEDIAL INVESTIGATION (RI), A RISK ASSESSMENT (RA), AND A FEASIBILITY STUDY (FS), COLLECTIVELY REFERRED TO
Aug 16, 20230$500.0KTHE CONTRACTOR SHALL SUPPORT REQUIREMENTS FOR DEVELOPING A CONCEPTUAL SITE MODEL (CSM), A REMEDIAL INVESTIGATION (RI), A RISK ASSESSMENT (RA), AND A FEASIBILITY STUDY (FS), COLLECTIVELY REFERRED TO AS AN RI/FS, AT THE LUKACHUKAI MOUNTAINS MINING DIST

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-12-31 (67 days from calculation)
+35 points
30 historical awards in this buyer and category group
+15 points
9 recorded award transactions
+10 points
Latest award action: 2026-07-10
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.