Federal contract award

69056721F000094

WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ENVIRONMENTAL ASSESSMENT AND 30% DESIGN

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office690567 WESTERN FEDERAL LANDS DIV
NAICS541330 — Engineering Services
PSCC211 — Architect - Engineer Services (including landscaping, interior layout, and designing)
Parent award / vehicle69056721D000007
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$7.5M
Current contract value$7.5M
Potential contract value / ceiling$7.5M
Start dateSep 14, 2021
Current end dateDec 16, 2026
Potential end dateDec 16, 2026
Latest award activityApr 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Apr 2, 2026P00013$233.6KTHIS MODIFICATION IS FOR PRELIMINARY DESIGN ACTIVITIES, PER THE ATTACHED STATEMENT OF WORK (SOW). THIS MODIFICATION ALSO CORRECTS A TYPOGRAPHICAL ERROR ON FORM SF30 FOR MODIFICATIONS P00010 AND P00012.
Aug 22, 2025P00012$260.2KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD TO ADDS SURVEYS AND REPORTS, EXTENDS POP.
Jun 3, 2025P00011$0WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD CORRECTS POP DATES IN PRISM AGREED UPON IN MOD P00010
May 16, 2025P00010$772.0KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD EXTENDS THE PERIOD OF PERFORMANCE
Apr 14, 2025P00009$0WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD EXTENDS THE PERIOD OF PERFORMANCE
May 13, 2024P00008$265.7KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ADDS PREVIOUSLY ELIMINATED WORK FOR LAMAR CONFLUENCE, SEEP BRIDGE, WARM CREEK BRIDGE, SODA BUTTE PICNIC AREA, REINCORPORATE MT NPS YELL 12(5), NER MP PROJECT INTO CP1, EARTHWORK QUANTITIES AND OTHER MINOR C
Apr 10, 2024P00007$706.9KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ADDS SCOPE TO THE PROJECT AND EXTENDS THE FIXED COMPLETION DATE
Mar 18, 2024P00006$0WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD EXTENDS THE FIXED COMPLETION DATE
Sep 14, 2023P00005$1.5MWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD NEPA TASKS
Jan 17, 2023P00004$1.2MWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD GEOTECHNICAL AND 30% DESIGN PHASES
Sep 12, 2022P00003$233.9KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ADDS DRAFT NARRATIVE AND CHARACTERIZATION OF THREATS, NARRATIVE METHODOLOGY TO CONSIDER CLIMATE CHANGE AND OTHER MINOR CHANGES
Aug 16, 2022P00002$0WY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD CHANGES COR
Jun 6, 2022P00001$613.9KWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ADDS FURTHER DETAIL FOR WETLAND DELINEATION, TOPOGRAPHICAL SURVEY, GEOTECHNICAL INVESTIGATION PLAN, AND LIDAR ANALYSIS
Sep 14, 20210$1.7MWY NPS YELL 12(3), NORTHEAST ENTRANCE ROAD ENVIRONMENTAL ASSESSMENT AND 30% DESIGN

Estimated positioning window

Oct 25, 2026 – Jan 23, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-12-16 (52 days from calculation)
+35 points
170 historical awards in this buyer and category group
+15 points
14 recorded award transactions
+10 points
Latest award action: 2026-04-02
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.