Federal contract award

69056723F00021N

WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office690567 WESTERN FEDERAL LANDS DIV
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicle69056719D000006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$120.7M
Current contract value$120.7M
Potential contract value / ceiling$120.7M
Start dateJan 24, 2023
Current end dateNov 30, 2026
Potential end dateNov 30, 2026
Latest award activityAug 17, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 24 of 24 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 17, 2026P00023$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - THIS MODIFICATION PROVIDES COMPENSATION FOR MODIFICATIONS TO THE GARNET HILL EQUESTRIAN BRIDGE DECKING, EXPANSION JOINT DOWELING DEFINITIZATION, TEMPORARY STEEL PLATE RENTAL, AND INSTALLATION OF EXPAN
Aug 13, 2026P00022$70.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - THIS MODIFICATION PROVIDES FOR FURNISHING AND INSTALLATION OF A COMPLETE FLASHING BEACON SYSTEM AT THE STAGECOACH ROAD CROSSING IN ACCORDANCE WITH SERIAL LETTER HK-106.
Jul 15, 2026P00021$400.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - THIS MODIFICATION CORRECTS THE PROJECT OVERRUN FOR FLAGGING, PILOT CAR AND TCS.
Sep 9, 2025P00020$200.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - FUNDING OBLIGATION FOR FUTURE WORK. INCLUDING POSSIBLE TEMPORARY TRAFFIC CONTROL.
Jul 10, 2025P00019$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE OTHER - DOT COMPLIANCE WITH PRESIDENT TRUMP'S PRIORITIES AND AGENDA
Jan 29, 2025P00018$144.5KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE OTHER
Jan 23, 2025P00017$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - SUPPLEMENTAL
Sep 19, 2024P00016$35.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE OTHER ADMINISTRATIVE ACTION
Sep 17, 2024P00015$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - OTHER ADMINISTRATIVE ACTION
Sep 16, 2024P00014$958.5KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - FUNDING FOR TRAFFIC CONTROL OVERRUNS
Sep 12, 2024P00013$267.8KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE OTHER ADMINISTRATIVE ACTION
Sep 5, 2024P00011$-188.6KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - PARTIAL DEPTH PRECAST DECK PANELS
Sep 5, 2024P00012$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - VALUE ENGINEERING TO LEAVE SOIL NAILS IN PLACE THIS CM COVERS ALL CHANGES ASSOCIATED WITH THE CHANGE OF THE SPECIFICATION LANGUAGE FOR SCR 555.18 AND 586.22.
Aug 6, 2024P00010$-18.6KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - VALUE ENGINEERING TO LEAVE SOIL NAILS IN PLACE
Jul 29, 2024P00009$42.3KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - MRB HAULING RESTRICTIONS THIS MODIFICATION COVERS ALL REIMBURSABLE DAMAGES THAT THE CONTRACTOR INCURRED WITH THE DELAYS RELATED TO THE MADISON RIVER BRIDGE (MRB).
Mar 19, 2024P00008$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - GARDINER RIVER HIGH BRIDGE APPROACH SLABS.
Mar 18, 2024P00007$10.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - GARDINER RIVER FUNDING ONLY ACTION
Sep 26, 2023P00006$200.1KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - GARDINER RIVER HIGH BRIDGE APPROACH SLABS.
Aug 3, 2023P00004$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - INSERT BASE PRICE INDEX (BPI) INTO CONTRACT SCR 109.06A.(A).(1)
Aug 3, 2023P00005$152.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - PROVIDE TWO AFAD-AUTOMATED FLAGGER ASSISTANCE DEVICES
Aug 1, 2023P00003$35.9KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - SUPPLEMENTAL FURNISH & MAINTAIN PORTABLE CHANGEABLE MESSAGE SIGNS.
May 19, 2023P00002$0WY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - SUPPLEMENTAL ADD PROVIDED SECTION 154.04A LABORATORY TRAILER AND TEST EQUIPMENT TO THE SCR'S. PERIOD OF PERFORMANCE: 1/24/2023 - 11/30/2026
Apr 28, 2023P00001$200.0KWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE - CHANGE ORDER FOR CORRECTIVE REPAIR ON GARDINER RIVER BRIDGE EAST APPROACH SLAB
Jan 24, 20230$118.2MWY NPS YELL 12(2), YELLOWSTONE RIVER BRIDGE

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2026-11-30 (29 days from calculation)
+35 points
134 historical awards in this buyer and category group
+15 points
24 recorded award transactions
+10 points
Latest award action: 2026-08-17
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.