69056724C000002

OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: THIS 2.6-MILE PROJECT INCLUDES REPAIR OF TWO HISTORIC REINFORCED CONCRETE VIADUCTS. ONE VIADUCT IS A 86-SPAN, 863-FOOT LONG STRUCTURE AND THE OTHER IS A 20-SPAN, 403-FOOT LONG STRUCTURE.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office690567 WESTERN FEDERAL LANDS DIV
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$14.2M
Current contract value$14.2M
Potential contract value / ceiling$14.2M
Start dateNov 17, 2023
Current end dateJun 19, 2026
Potential end dateJun 19, 2026
Latest award activityMay 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 26 of 26 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
May 27, 2026P00025$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: THIS CONTRACT MODIFICATION DEFINITIZES CONTRACT MODIFICATION (CM) #00020 AND CONSISTS OF ADDITIONAL CLASS 2 CONCRETE REPAIR ON BOTH EAST VIADUCT (EV) AND WEST VIADUCT (WV) DECKS AND ADDI
Apr 2, 2026P00024$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: THIS CONTRACT MODIFICATION (CM) #00020 AND ADDRESSES THE CONTRACTOR'S TYPE 2 DIFFERING SITE CONDITIONS (DSC) ASSERTION ENCOUNTERED DURING CORE DRILLING FOR SHEAR ANCHORS ON THE WEST VIA
Mar 27, 2026P00023$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING ACTION ADDITIONAL CONCRETE DECK THICKNESS ON THE EAST VIADUCT AND CLARIFYING METHOD OF PAYMENT AND QUANTITY FOR ADDITIONAL STIRRUP INSTALLATION ON THE EAST VIADUCT NORTH LONGITUDI
Sep 18, 2025P00022$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING ACTION MISCELLANEOUS WORK ITEMS ON BOTH THE WEST AND EAST VIADUCTS.
Sep 9, 2025P00021$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING ACTION TEMPORARY SHORING FOR THE EAST VIADUCT, ADDITIONAL REPAIR CONCRETE WORK ITEMS WITH ADDED LABOR/EQUIPMENT HOURS.
Aug 1, 2025P00020$375.0KOR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING ACTION
Jul 2, 2025P00019$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY. THIS MODIFICATION UPDATES THE CONTRACT CLAUSES TO INCORPORATE FEDERAL ACQUISITION REGULATION (FAR) DOT CLASS DEVIATIONS NO. 2025-01 AND 2025-
May 27, 2025P00017$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: STEEL CURBING (EAST & WEST VIADUCT)
May 27, 2025P00018$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY. ADDITIONAL QUANTITIES ON THE EAST VIADUCT AND A CREDIT TO THE GOVERNMENT OF CONTRACTOR TESTING.
Apr 8, 2025P00015$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY. THIS CONTRACT MODIFICATION DEFINITIZES UNILATERAL CM P00010.
Apr 8, 2025P00016$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY. THIS CHANGE ORDER DIRECTS THE CONTRACTOR TO INITIATE THE ENGINEERING DESIGN FOR THE TEMPORARY SHORING SYSTEM REQUIRED TO SUPPORT THE NORTH
Mar 26, 2025P00014$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY. THIS MODIFICATION ADDS WORK FOR INSTALLING AND REMOVING STRAIN GAUGES ON THE WEST VIADUCT AND ALSO ADDS WORK FOR INSTALLING RESIN BOND ANCHOR
Jan 24, 2025P00013$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: EXPAND LIMITS OF THE WEST VIADUCT DECK OVERLAY.
Dec 17, 2024P00012$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: MOD TO REPAIR POTHOLES, MOBILIZATION FOR ADDITIONAL MATERIAL FOR EAST VIADUCT.
Sep 24, 2024P00011$430.0KOR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: DEFINITIZE CHANGE ORDER
Sep 11, 2024P00010$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING OBLIGATION CHANGE ORDER - TRACK COSTS FOR SCENIC HIGHWAY (GORGE)
Sep 10, 2024P00009$3.4MOR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: FUNDING OBLIGATION
Sep 9, 2024P00008$115.5KOR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: CONCRETE REPAIR ON BEAMS AT THE WEST VIADUCT
Jul 19, 2024P00007$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: DEFINITIZE CHANGE ORDER
Jul 12, 2024P00005$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: SUPPLEMENTAL
Jul 11, 2024P00006$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: ADMIN MOD
Jun 14, 2024P00004$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: SUPPLEMENTAL
Jun 12, 2024P00002$0THIS CHANGE ORDER DIRECTS THE CONTRACTOR TO PERFORM THE WORK AS DESCRIBED ON THE FOLLOWING PAGES. THE CONTRACTOR IS TO TRACK AND SEGREGATE COSTS ASSOCIATED WITH THIS WORK. A SUCCESSOR CONTRACT MODIFICATION WILL DEFINITIZE THE WORK, PRICES, AND ANY TI
Jun 12, 2024P00003$670.0KTHIS CHANGE ORDER DIRECTS THE CONTRACTOR TO PERFORM THE WORK AS DESCRIBED ON THE FOLLOWING PAGES. THE CONTRACTOR IS TO TRACK AND SEGREGATE COSTS ASSOCIATED WITH THIS WORK. A SUCCESSOR CONTRACT MODIFICATION WILL DEFINITIZE THE WORK, PRICES, AND ANY TI
May 3, 2024P00001$0OR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: SUPPLEMENTAL
Nov 17, 20230$9.2MOR FLAP DOT CRGNSA 100(8), MULTNOMAH FALLS VIADUCTS REPAIR: THIS 2.6-MILE PROJECT INCLUDES REPAIR OF TWO HISTORIC REINFORCED CONCRETE VIADUCTS. ONE VIADUCT IS A 86-SPAN, 863-FOOT LONG STRUCTURE AND THE OTHER IS A 20-SPAN, 403-FOOT LONG STRUCTURE.

Buyer contacts from matching notices

Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.

ContactRolePublished contact methodsEvidenceSource date
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceNov 17, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceOct 6, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceOct 5, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceOct 3, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceOct 2, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceOct 2, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 25, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 25, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 25, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 21, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 21, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 18, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 6, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceSep 5, 2023
Contracts G. OfficeContactwfl.contracts@dot.gov
3606197520
SourceAug 17, 2023