Federal contract award
69056726C000001
FUNDS CONSTRUCTION CONTRACT OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. WORK INCLUDES CLEARING, EXCAVATION, GRADING, WALLS, BRIDGE, DRAINAGE, AND PAVING.
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 690567 WESTERN FEDERAL LANDS DIV |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.3M |
| Current contract value | $6.3M |
| Potential contract value / ceiling | $6.3M |
| Start date | Nov 4, 2025 |
| Current end date | Dec 31, 2026 |
| Potential end date | Dec 31, 2026 |
| Latest award activity | Aug 6, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 6, 2026 | P00006 | $0 | OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. THIS CONTRACT MODIFICATION DELETES THE MICRO PILE FOUNDATIONS AT MITCHELL CREEK BRIDGE AND REPLACES THEM WITH AN H-PILE DESIGN. THIS CHANGE WAS PR |
| Aug 3, 2026 | P00005 | $228.6K | OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. THIS CONTRACT MODIFICATION INCORPORATES IN-WATER WORK AT MITCHELL CREEK. IT REIMBURSES THE CONTRACTOR TO TEMPORARILY DIVERT MITCHELL CREEK, RES |
| Jul 13, 2026 | P00004 | $167.9K | OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. THIS CONTRACT MODIFICATION REIMBURSES THE CONTRACTOR FOR ADDITIONAL WORK TO INSTALL TEMPORARY SHORING PER REVISED DRAWING SUBMITTALS. |
| Jun 15, 2026 | P00003 | $33.5K | OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. THIS MODIFICATION INCORPORATES MASTERWORKS SPEC LANGUAGE INTO THE CONTRACT. THIS MODIFICATION ALSO DELETES THE BID ITEMS A0360 AND A0740 AND ADDS |
| Mar 26, 2026 | P00002 | $25.6K | FUNDS CONSTRUCTION CONTRACT OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. WORK INCLUDES CLEARING, EXCAVATION, GRADING, WALLS, BRIDGE, DRAINAGE, AND PAVING. HOOD RIVER OFFICE LEASE. |
| Feb 23, 2026 | P00001 | $0 | FUNDS CONSTRUCTION CONTRACT OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. WORK INCLUDES CLEARING, EXCAVATION, GRADING, WALLS, BRIDGE, DRAINAGE, AND PAVING. HOOD RIVER OFFICE LEASE. |
| Nov 4, 2025 | 0 | $5.9M | FUNDS CONSTRUCTION CONTRACT OR FLAP DOT CRGNSA 100(9), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, PERHAM CREEK TO MITCHELL POINT. WORK INCLUDES CLEARING, EXCAVATION, GRADING, WALLS, BRIDGE, DRAINAGE, AND PAVING. |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2026-12-31 (60 days from calculation)
- +35 points
- 134 historical awards in this buyer and category group
- +15 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-08-06
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.