Federal contract award
6913G625C100017
X-WAVE INNOVATIONS, INC. PHASE II SBIR AWARD UNDER TOPIC 24-FH3: LOW-COST, RAPID ASSESSMENT OF BRIDGE DECK CHLORIDE CONTENT IN CONCRETE
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 6913G6 VOLPE NATL. TRANS. SYS CNTR |
| NAICS | 541715 — Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) |
| PSC | AS12 — TRANSPORTATION R&D SERVICES; SURFACE TRANSPORTATION, PUBLIC TRANSIT, AND RAIL; APPLIED RESEARCH |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $1.5M |
| Current contract value | $1.5M |
| Potential contract value / ceiling | $1.5M |
| Start date | Sep 26, 2025 |
| Current end date | Sep 25, 2027 |
| Potential end date | Sep 25, 2027 |
| Latest award activity | Jul 9, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 9, 2026 | P00003 | $0 | ADD FAR 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026).X-WAVE INNOVATIONS, INC. PHASE II SBIR AWARD UNDER TOPIC 24-FH3: LOW-COST, RAPID ASSESSMENT OF BRIDGE DECK CHLORIDE CONTENT IN CONCRETE |
| Jan 21, 2026 | P00002 | $0 | CHANGE OF PRINCIPAL INVESTIGATOR - KEY PERSONNEL - X-WAVE INNOVATIONS, INC. PHASE II SBIR AWARD UNDER TOPIC 24-FH3: LOW-COST, RAPID ASSESSMENT OF BRIDGE DECK CHLORIDE CONTENT IN CONCRETE |
| Oct 20, 2025 | P00001 | $0 | SBIR PHASE II AWARD UNDER TOPIC 24-FH3: LOW-COST, RAPID ASSESSMENT OF BRIDGE DECK CHLORIDE CONTENT IN CONCRETE. MODIFICATION TO CORRECT INFORMATION IN SECTION B OF THE CONTRACT. |
| Sep 26, 2025 | 0 | $1.5M | X-WAVE INNOVATIONS, INC. PHASE II SBIR AWARD UNDER TOPIC 24-FH3: LOW-COST, RAPID ASSESSMENT OF BRIDGE DECK CHLORIDE CONTENT IN CONCRETE |
Estimated positioning window
Nov 1, 2026 – Mar 25, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-09-25 (328 days from calculation)
- +35 points
- 81 historical awards in this buyer and category group
- +15 points
- 4 recorded award transactions
- +10 points
- Latest award action: 2026-07-09
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Buyer contacts from matching notices
Matched on exact award/solicitation identifier and awarding agency. Source dates describe the notice, not current contact verification.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.