THE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office692M15 ACQUISITION & GRANTS, AAQ600
NAICS541330 — Engineering Services
PSCC1HA — ARCHITECT AND ENGINEERING- CONSTRUCTION: GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) R&D FACS
Parent award / vehicle692M1520D00002
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.3M
Current contract value$1.3M
Potential contract value / ceiling$1.3M
Start dateAug 26, 2021
Current end dateJul 14, 2028
Potential end dateJul 14, 2028
Latest award activityJul 15, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 15, 2026P00006$9.3KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
May 21, 2025P00005$26.9KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
Apr 4, 2024P00004$279.8KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
Mar 1, 2023P00003$45.8KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
Sep 23, 2022P00002$74.7KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
Mar 9, 2022P00001$102.8KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.
Aug 26, 20210$798.3KTHE A/E SHALL PROVIDE DESIGN, ENGINEERING AND CONSTRUCTION SUPPORT SERVICES IN ACCORDANCE WITH THE REQUIREMENTS, SCHEDULES, GUIDANCE AND INFORMATION CONTAINED OR REFERENCED HEREIN FOR THE RENOVATION OF THE MAIN SUBSTATION 69KV YARD.

Estimated positioning window

Jul 14, 2027 – Jan 14, 2028

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-07-14 (621 days from calculation)
+25 points
13 historical awards in this buyer and category group
+15 points
7 recorded award transactions
+10 points
Latest award action: 2026-07-15
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.