Federal contract award

693C7320F000072

ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: NP ROCR 503(1) 24(2) TO REHABILITATE WATERSIDE DRIVE AND PINEY BRANCH PARKWAY, LOCATED IN ROCK CREEK

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS541330 — Engineering Services
PSCC1LB — ARCHITECT AND ENGINEERING- CONSTRUCTION: HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleDTFH7015D00005
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$1.3M
Current contract value$1.3M
Potential contract value / ceiling$1.3M
Start dateSep 9, 2020
Current end dateMay 31, 2027
Potential end dateMay 31, 2027
Latest award activityAug 11, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 11, 2026P00007$0THE PURPOSE FOR THIS NO COST MODIFICATION IS TO: 1. EXTEND THE PERIOD OF PERFORMANCE END DATE UNTIL MAY 31, 2027, FOR THE CONTINUATION OF DESIGN SUPPORT SERVICES DURING CONSTRUCTION - PHASE VII. 2. REMOVE MR. SHOUKAT NAWAZ AS THE TASK ORDER CONTR
Sep 15, 2025P00006$8.6KTHE PURPOSE FOR THIS NO COST ADMINISTRATIVE MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM JUNE 19, 2025, UNTIL JUNE 30, 2026, DUE TO THE PROJECT CONSTRUCTION AWARD BEING UNDERWAY AND DESIGN SUPPORT SERVICES DURING CONSTRUCTION - P
Jun 3, 2025P00005$0THE PURPOSE FOR THIS NO COST ADMINISTRATIVE MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE FROM JUNE 19, 2025, UNTIL JUNE 30, 2026, DUE TO THE PROJECT CONSTRUCTION AWARD BEING UNDERWAY AND DESIGN SUPPORT SERVICES DURING CONSTRUCTION - P
Mar 11, 2024P00004$175.0KTHE PURPOSE OF THIS MODIFICATION IS TO ADD AND FULLY FUND NEW CONTRACT LINE-ITEM NUMBERS (CLIN) FOR ADDITION WORK IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK AS FOLLOWS: 1. ADD AND FULLY FUND CLIN 00507 IN THE TOTAL OBLIGATED AMOUNT OF $130,55
Dec 28, 2022P00003$0THE REASON FOR THIS NO COST ADMINISTRATIVE MODIFICATION IS TO EXTEND THE PERIOD OF PERFORMANCE END DATE UNTIL JUNE 19, 2025, DUE TO THE DESIGN WORK BEING ON HOLD FOR 9-10 MONTHS FOR SIDEWALK WORK CONTRACT MODIFICATION AND ALSO, REQUIRE ADDITIONAL TIM
Sep 1, 2022P00002$232.5KTHE PURPOSE OF THIS MODIFICATION IS TO ADD SIDEWALK FROM 17TH STREET NW TO PINEY BRANCH PARKWAY FOR PROJECT: NP ROCR 503(1) 24(2) AS FOLLOWS AND IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK: 1. ADD AND FULLY FUND CONTRACT LINE ITEM NUMBER(CLIN)
Mar 1, 2021P00001$524.6KTHE PURPOSE OF THIS MODIFICATION IS TO: 1. CANCEL CONTRACT LINE ITEM NUMBER(CLIN)00003 IN ITS ENTIRETY AND REPLACE WITH AND FULLY FUND CLIN 00101 IN THE AMOUNT OF $253,196.22. 2. CANCEL CLIN 00004 IN ITS ENTIRETY AND REPLACE WITH AND FULLY FUND CLI
Sep 9, 20200$326.9KENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: NP ROCR 503(1) 24(2) TO REHABILITATE WATERSIDE DRIVE AND PINEY BRANCH PARKWAY, LOCATED IN ROCK CREEK

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-05-31 (211 days from calculation)
+35 points
96 historical awards in this buyer and category group
+15 points
8 recorded award transactions
+10 points
Latest award action: 2026-08-11
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+0 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.