Federal contract award
693C7321C000023
THE PROJECT CONSISTS OF REPAIRING TWO LANDSLIDES AT MILE POST 1.1 OF FS ROUTE 27 (FS-27) WITHIN EL YUNQUE NATIONAL FOREST FOR THE FEDERAL AVIATION ADMINISTRATION. THE WORK INCLUDES CONSTRUCTING AN ANCHORED SOLDIER PILE WALL, GABION WALL, ROCK BUTTRE
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | SMALL BUSINESS SET ASIDE - TOTAL |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.9M |
| Current contract value | $6.9M |
| Potential contract value / ceiling | $6.9M |
| Start date | Aug 30, 2021 |
| Current end date | Oct 31, 2028 |
| Potential end date | Oct 31, 2028 |
| Latest award activity | Jun 2, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 2, 2026 | P00013 | $70.3K | PR FS ROUTE 27 SLIDE FAA CM #13 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT FROM $6,790,929.62 BY $70,310.27 TO $6,861,239.89. 2) NO CHANGE TO CONTRACT TIME. ALL OTHER TERMS AND CONDITIONS |
| Apr 17, 2026 | P00012 | $1.1M | PR FS ROUTE 27 SLIDE FAA - CM #12: 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $1,098,376.95 FROM $5,692,552.67 TO $6,790,929.62. 2) EXTEND CONTRACT TIME BY 600 CALENDAR DAYS. 3) ADDRESS TIME |
| Mar 13, 2026 | P00011 | $404.6K | PR FS ROUTE 27 SLIDE FAA CM #11 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT FROM $5,287,904.82 BY $404,647.85 TO $5,692,552.67. 2) EXTEND CONTRACT BY 245 CALENDAR DAYS. 3) TO ADDRESS THE REQUES |
| Apr 3, 2025 | P00010 | $0 | PR FS ROUTE 27 SLIDE FAA CM #10 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO OCTOBER 31, 2026 |
| Jul 10, 2024 | P00009 | $0 | PR FS ROUTE 27 SLIDE FAA CM #9 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME ADMINISTRATIVE CM TO CORRECT ACCOUNTING IN SCHEDULE A |
| Apr 17, 2024 | P00008 | $0 | PR FS ROUTE 27 SLIDE FAA CM #8 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO JUNE 30, 2025 |
| Dec 19, 2023 | P00007 | $498.4K | PR FS ROUTE 27 SLIDE FAA CM #7 INCREASE CONTRACT AMOUNT BY $498,356.02 INCREASE CONTRACT TIME BY 73 CALENDAR DAYS |
| Sep 7, 2023 | P00006 | $-618.8K | PR FS ROUTE 27 SLIDE FAA CM #6 DECREASE CONTRACT AMOUNT BY $618,800.00 NO CHANGE TO CONTRACT TIME |
| Apr 19, 2023 | P00005 | $221.4K | PR FS ROUTE 27 SLIDE FAA CM #5 INCREASE CONTRACT AMOUNT BY $221,399.75 NO CHANGE TO CONTRACT TIME |
| Feb 9, 2023 | P00004 | $0 | PR FS ROUTE 27 SLIDE SITE FAA 693C7321C000023 CM #4 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO APRIL 7, 2024 |
| Dec 12, 2022 | P00003 | $680.0K | PR FS ROUTE 27 SLIDE FAA 693C7321C000023 CM #3 INCREASE CONTRACT AMOUNT BY $680,000.00 NO CHANGE TO CONTRACT TIME |
| Aug 30, 2022 | P00002 | $31.7K | PR FS ROUTE 27 SLIDE SITE FAA CM #2 INCREASE CONTRACT AMOUNT BY $31,722.56 NO CHANGE TO CONTRACT TIME |
| Jul 21, 2022 | P00001 | $468.2K | PR FS ROUTE 27 SLIDE SITE FAA CM #1 INCREASE CONTRACT AMOUNT BY $468,226.49 NO CHANGE TO CONTRACT TIME |
| Aug 30, 2021 | 0 | $4.0M | THE PROJECT CONSISTS OF REPAIRING TWO LANDSLIDES AT MILE POST 1.1 OF FS ROUTE 27 (FS-27) WITHIN EL YUNQUE NATIONAL FOREST FOR THE FEDERAL AVIATION ADMINISTRATION. THE WORK INCLUDES CONSTRUCTING AN ANCHORED SOLDIER PILE WALL, GABION WALL, ROCK BUTTRE |
Estimated positioning window
Oct 31, 2027 – Apr 30, 2028
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2028-10-31 (730 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 14 recorded award transactions
- +10 points
- Latest award action: 2026-06-02
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.