693C7321C000023

THE PROJECT CONSISTS OF REPAIRING TWO LANDSLIDES AT MILE POST 1.1 OF FS ROUTE 27 (FS-27) WITHIN EL YUNQUE NATIONAL FOREST FOR THE FEDERAL AVIATION ADMINISTRATION. THE WORK INCLUDES CONSTRUCTING AN ANCHORED SOLDIER PILE WALL, GABION WALL, ROCK BUTTRE

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$6.9M
Current contract value$6.9M
Potential contract value / ceiling$6.9M
Start dateAug 30, 2021
Current end dateOct 31, 2028
Potential end dateOct 31, 2028
Latest award activityJun 2, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 14 of 14 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 2, 2026P00013$70.3KPR FS ROUTE 27 SLIDE FAA CM #13 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT FROM $6,790,929.62 BY $70,310.27 TO $6,861,239.89. 2) NO CHANGE TO CONTRACT TIME. ALL OTHER TERMS AND CONDITIONS
Apr 17, 2026P00012$1.1MPR FS ROUTE 27 SLIDE FAA - CM #12: 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $1,098,376.95 FROM $5,692,552.67 TO $6,790,929.62. 2) EXTEND CONTRACT TIME BY 600 CALENDAR DAYS. 3) ADDRESS TIME
Mar 13, 2026P00011$404.6KPR FS ROUTE 27 SLIDE FAA CM #11 693C7321C000023 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT FROM $5,287,904.82 BY $404,647.85 TO $5,692,552.67. 2) EXTEND CONTRACT BY 245 CALENDAR DAYS. 3) TO ADDRESS THE REQUES
Apr 3, 2025P00010$0PR FS ROUTE 27 SLIDE FAA CM #10 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO OCTOBER 31, 2026
Jul 10, 2024P00009$0PR FS ROUTE 27 SLIDE FAA CM #9 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME ADMINISTRATIVE CM TO CORRECT ACCOUNTING IN SCHEDULE A
Apr 17, 2024P00008$0PR FS ROUTE 27 SLIDE FAA CM #8 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO JUNE 30, 2025
Dec 19, 2023P00007$498.4KPR FS ROUTE 27 SLIDE FAA CM #7 INCREASE CONTRACT AMOUNT BY $498,356.02 INCREASE CONTRACT TIME BY 73 CALENDAR DAYS
Sep 7, 2023P00006$-618.8KPR FS ROUTE 27 SLIDE FAA CM #6 DECREASE CONTRACT AMOUNT BY $618,800.00 NO CHANGE TO CONTRACT TIME
Apr 19, 2023P00005$221.4KPR FS ROUTE 27 SLIDE FAA CM #5 INCREASE CONTRACT AMOUNT BY $221,399.75 NO CHANGE TO CONTRACT TIME
Feb 9, 2023P00004$0PR FS ROUTE 27 SLIDE SITE FAA 693C7321C000023 CM #4 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO APRIL 7, 2024
Dec 12, 2022P00003$680.0KPR FS ROUTE 27 SLIDE FAA 693C7321C000023 CM #3 INCREASE CONTRACT AMOUNT BY $680,000.00 NO CHANGE TO CONTRACT TIME
Aug 30, 2022P00002$31.7KPR FS ROUTE 27 SLIDE SITE FAA CM #2 INCREASE CONTRACT AMOUNT BY $31,722.56 NO CHANGE TO CONTRACT TIME
Jul 21, 2022P00001$468.2KPR FS ROUTE 27 SLIDE SITE FAA CM #1 INCREASE CONTRACT AMOUNT BY $468,226.49 NO CHANGE TO CONTRACT TIME
Aug 30, 20210$4.0MTHE PROJECT CONSISTS OF REPAIRING TWO LANDSLIDES AT MILE POST 1.1 OF FS ROUTE 27 (FS-27) WITHIN EL YUNQUE NATIONAL FOREST FOR THE FEDERAL AVIATION ADMINISTRATION. THE WORK INCLUDES CONSTRUCTING AN ANCHORED SOLDIER PILE WALL, GABION WALL, ROCK BUTTRE

Estimated positioning window

Oct 31, 2027 – Apr 30, 2028

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2028-10-31 (730 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
14 recorded award transactions
+10 points
Latest award action: 2026-06-02
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.