Federal contract award

693C7322C000001

NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIXED PRICE WITH ECONOMIC PRICE ADJUSTMENT
Obligations$173.1M
Current contract value$173.1M
Potential contract value / ceiling$175.2M
Start dateDec 7, 2021
Current end dateDec 31, 2026
Potential end dateDec 31, 2026
Latest award activityAug 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 16 of 16 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 27, 2026P00015$-57.8KNP-GWMP 1(3), 2(5) CM #15: 693C7322C000001 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) TO DECREASE THE CONTRACT AMOUNT BY $57,817.85 FROM $173,110,572.21 TO $173,052,754.36. 2) DELETE OLD LINES OF ACCOUNTING AND CREATE NEW LINES OF
Sep 9, 2025P00014$8.2MPROJECT NP GWMP 1(3) 2(5): THE PURPOSE OF THIS MODIFICATION IS TO: 1. TO INCREASE THE CONTRACT AMOUNT FROM $164,885,039.47 BY $8,225,532.74 TO $173,110,572.21. 2. TO ADDRESS THE ADDITION OF AN ASPHALT MILL AND OVERLAY ON GWMP BETWEEN SPOUT RUN A
Aug 11, 2025P00013$460.6KNP-GWMP 1(3), 2(5) 693C7320C000001 CM #13 INCREASE CONTRACT AMOUNT BY $460,633.22 NO CHANGE TO CONTRACT TIME ENVIRONMENTAL ASSESSMENT AND BRIDGE RAIL REPAIR
Jun 2, 2025P00012$1.3MNP-GWMP 1(3), 2(5) CM #12 INCREASE CONTRACT AMOUNT BY $1,340,400.95 NO CHANGE TO CONTRACT TIME STEEL BACKED TIMBER RUB RAIL, I-495 RAMP REHABILITATION, AND UNDER BRIDGE PLATFORMS
Feb 24, 2025P00011$0NP-GWMP 1(3), 2(5) CM #11 ADMINISTRATIVE CM NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME
Aug 26, 2024P00010$66.7KNP-GWMP 1(3), 2(5) CM #10 INCREASE CONTRACT AMOUNT BY $66,731.89 NO CHANGE TO CONTRACT TIME REPAIR OF ROADWAY DEPRESSION
Aug 8, 2024P00009$149.9KNP-GWMP 1(3), 2(5) CM #9 INCREASE CONTRACT AMOUNT BY $149,866.85 NO CHANGE TO CONTRACT TIME TEMPORARY GIRDER SUPPORT FOR GULF BRANCH AND DONALDSON RUN BRIDGES
Apr 4, 2024P00008$80.8KNP-GWMP 1(3), 2(5) CM #8 INCREASE CONTRACT AMOUNT BY $80,765.00
Jan 18, 2024P00007$751.8KNP-GWMP 1(3), 2(5) CM #7 INCREASE CONTRACT AMOUNT BY $751,754.33
Sep 11, 2023P00006$0THE PURPOSE OF THIS ADMINISTRATIVE MODIFICATION IS TO: 1. REDUCE CONTRACT LINE ITEM NUMBER (CLIN) 00801 - SCHEDULE D - EMERGENCY/MOT GUARDRAIL REPAIRS FROM $174,767.04 BY $113,280.55 TO $61,486.49. 2. ADD AND FULLY FUND CONTRACT LINE ITEM NUMBER
Jul 18, 2023P00005$154.9KNP-GWMP 1(3), 2(5) 693C7322C000001 CM# 5 INCREASE CONTRACT AMOUNT BY $154,888.64
Mar 7, 2023P00004$270.0KNP-GWMP 1(3), 2(5) 693C7322C000001 CM# 4 INCREASE CONTRACT AMOUNT BY $270,000.00
Sep 15, 2022P00003$220.8KNP-GWMP 1(3), 2(5) 693C7322C000001 CM# 3 INCREASE CONTRACT AMOUNT BY $220,787.83
May 16, 2022P00002$64.7KNP-GWMP 1(3),2(5) CM #2 INCREASE CONTRACT AMOUNT BY $64,706.05 NO CHANGE TO CONTRACT TIME
Dec 17, 2021P00001$0NORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL
Dec 7, 20210$161.3MNORTH SECTION REHABILITATION OF GEORGE WASHINGTON MEMORIAL HIGHWAY- THE PROJECT CONSISTS OF THE RECONSTRUCTION OF APPROXIMATELY 7.5 MILES OF THE NORTHERN SECTION OF THE GEORGE WASHINGTON MEMORIAL PARKWAY (GWMP) BETWEEN SPOUT RUN AND THE I-495/CAPITAL

Estimated positioning window

Nov 1, 2026 – Jan 30, 2027

Recompete signal:
80/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 80/100. Available recorded signals: 75 points.

Contract end 2026-12-31 (60 days from calculation)
+35 points
221 historical awards in this buyer and category group
+15 points
16 recorded award transactions
+10 points
Latest award action: 2026-08-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.