Federal contract award

693C7322C000007

PROJECT NP-BLRI 2D17 THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LAUREL FORK BRIDGE OF THE BLUE RIDGE PARKWAY LOCATED AT MILEPOST 248.85. THE WORK INCLUDES PRECAST SEGMENTAL CONCRETE, STRUCTURAL CONCRETE, POST-TENSIONING SYSTEM, REINFORCING STEEL

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$28.0M
Current contract value$28.0M
Potential contract value / ceiling$28.0M
Start dateApr 11, 2022
Current end dateDec 31, 2027
Potential end dateDec 31, 2027
Latest award activityJul 27, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 27, 2026P00014$-701.5KNP-BLRI 2D17 - CM #14: 693C7322C000007 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE CONTRACT AMOUNT BY $701,509.49 FROM $28,680,061.86 TO $27,978,552.37. 2) ADD LIQUIDATED DAMAGES OF $5,200.00 PER DAY FOR 27 DAYS, TOTALING $140
Nov 18, 2025P00013$0NP-BLRI 2D17 693C7322C000007 CM #13 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2027
Aug 7, 2025P00012$-53.8KNP-BLRI 2D17 693C7322C000007 CM #12 DECREASE CONTRACT AMOUNT BY $53,767.59 NO CHANGE TO CONTRACT TIME
Nov 25, 2024P00011$0NP-BLRI 2D17 693C7322C000007 CM #11 NO CHANGE TO CONTRACT AMOUNT INCREASE CONTRACT TIME BY 47 CALENDAR DAYS TIME EXTENSION FOR WINTER SHUTDOWN
Jul 17, 2024P00010$80.9KNP-BLRI 2D17 693C7322C000007 CM #10 INCREASE CONTRACT AMOUNT BY $80,927.00 NO CHANGE TO CONTRACT TIME
Jun 4, 2024P00009$0NP-BLRI 2D17 693C7322C000007 CM #9 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2025
May 17, 2024P00008$-7.6KNP-BLRI 2D17 693C7322C000007 CM #8 DECREASE CONTRACT AMOUNT BY $7,642.12 NO CHANGE TO CONTRACT TIME
Mar 25, 2024P00007$0NP-BLRI 2D17 693C7322C000007 CM #7 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME CHANGE LINES OF ACCOUNTING
Nov 28, 2023P00006$-570NP-BLRI 2D17 693C7322C000007 CM #6 DECREASE CONTRACT AMOUNT BY $569.95 EXTEND CONTRACT TIME BY 27 CALENDAR DAYS
Nov 16, 2022P00005$14.2KNP-BLRI 2D17 693C7322C000007 CM# 5 INCREASE CONTRACT AMOUNT BY $14,206.11 NO CHANGE TO CONTRACT TIME
Sep 15, 2022P00004$0NP-BLRI 2D17 693C7322C000007 CM# 4 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME POST-TENSIONED SEGMENTAL CONCRETE PIERS TO BE RE-DESIGNED AS CAST-IN-PLACE PIERS THE TOTAL OBLIGATED CONTRACT AMOUNT REMAINS UNCHANGED AT $28,646,9
Jul 27, 2022P00003$-13NP-BLRI 2D17 CM# 3 DECREASE CONTRACT AMOUNT BY $13.33 NO CHANGE TO CONTRACT TIME
May 26, 2022P00002$0NP-BLRI 2D17 CM# 2 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME
Apr 26, 2022P00001$0PROJECT NP-BLRI 2D17: THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO: 1. REPLACE THE CONTRACT BID SCHEDULE (B PAGES 1 - 8) WITH A REVISED BID SCHEDULE TO REFLECT THE CORRECT TOTAL AMOUNTS OF FOUR SEPARATE ITEM NUMBERS: A0120; A01
Apr 11, 20220$28.6MPROJECT NP-BLRI 2D17 THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LAUREL FORK BRIDGE OF THE BLUE RIDGE PARKWAY LOCATED AT MILEPOST 248.85. THE WORK INCLUDES PRECAST SEGMENTAL CONCRETE, STRUCTURAL CONCRETE, POST-TENSIONING SYSTEM, REINFORCING STEEL

Estimated positioning window

Dec 31, 2026 – Jun 30, 2027

Recompete signal:
70/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 70/100. Available recorded signals: 65 points.

Contract end 2027-12-31 (432 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
15 recorded award transactions
+10 points
Latest award action: 2026-07-27
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.