Federal contract award
693C7322C000007
PROJECT NP-BLRI 2D17 THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LAUREL FORK BRIDGE OF THE BLUE RIDGE PARKWAY LOCATED AT MILEPOST 248.85. THE WORK INCLUDES PRECAST SEGMENTAL CONCRETE, STRUCTURAL CONCRETE, POST-TENSIONING SYSTEM, REINFORCING STEEL
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $28.0M |
| Current contract value | $28.0M |
| Potential contract value / ceiling | $28.0M |
| Start date | Apr 11, 2022 |
| Current end date | Dec 31, 2027 |
| Potential end date | Dec 31, 2027 |
| Latest award activity | Jul 27, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 15 of 15 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 27, 2026 | P00014 | $-701.5K | NP-BLRI 2D17 - CM #14: 693C7322C000007 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE CONTRACT AMOUNT BY $701,509.49 FROM $28,680,061.86 TO $27,978,552.37. 2) ADD LIQUIDATED DAMAGES OF $5,200.00 PER DAY FOR 27 DAYS, TOTALING $140 |
| Nov 18, 2025 | P00013 | $0 | NP-BLRI 2D17 693C7322C000007 CM #13 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2027 |
| Aug 7, 2025 | P00012 | $-53.8K | NP-BLRI 2D17 693C7322C000007 CM #12 DECREASE CONTRACT AMOUNT BY $53,767.59 NO CHANGE TO CONTRACT TIME |
| Nov 25, 2024 | P00011 | $0 | NP-BLRI 2D17 693C7322C000007 CM #11 NO CHANGE TO CONTRACT AMOUNT INCREASE CONTRACT TIME BY 47 CALENDAR DAYS TIME EXTENSION FOR WINTER SHUTDOWN |
| Jul 17, 2024 | P00010 | $80.9K | NP-BLRI 2D17 693C7322C000007 CM #10 INCREASE CONTRACT AMOUNT BY $80,927.00 NO CHANGE TO CONTRACT TIME |
| Jun 4, 2024 | P00009 | $0 | NP-BLRI 2D17 693C7322C000007 CM #9 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2025 |
| May 17, 2024 | P00008 | $-7.6K | NP-BLRI 2D17 693C7322C000007 CM #8 DECREASE CONTRACT AMOUNT BY $7,642.12 NO CHANGE TO CONTRACT TIME |
| Mar 25, 2024 | P00007 | $0 | NP-BLRI 2D17 693C7322C000007 CM #7 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME CHANGE LINES OF ACCOUNTING |
| Nov 28, 2023 | P00006 | $-570 | NP-BLRI 2D17 693C7322C000007 CM #6 DECREASE CONTRACT AMOUNT BY $569.95 EXTEND CONTRACT TIME BY 27 CALENDAR DAYS |
| Nov 16, 2022 | P00005 | $14.2K | NP-BLRI 2D17 693C7322C000007 CM# 5 INCREASE CONTRACT AMOUNT BY $14,206.11 NO CHANGE TO CONTRACT TIME |
| Sep 15, 2022 | P00004 | $0 | NP-BLRI 2D17 693C7322C000007 CM# 4 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME POST-TENSIONED SEGMENTAL CONCRETE PIERS TO BE RE-DESIGNED AS CAST-IN-PLACE PIERS THE TOTAL OBLIGATED CONTRACT AMOUNT REMAINS UNCHANGED AT $28,646,9 |
| Jul 27, 2022 | P00003 | $-13 | NP-BLRI 2D17 CM# 3 DECREASE CONTRACT AMOUNT BY $13.33 NO CHANGE TO CONTRACT TIME |
| May 26, 2022 | P00002 | $0 | NP-BLRI 2D17 CM# 2 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME |
| Apr 26, 2022 | P00001 | $0 | PROJECT NP-BLRI 2D17: THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO: 1. REPLACE THE CONTRACT BID SCHEDULE (B PAGES 1 - 8) WITH A REVISED BID SCHEDULE TO REFLECT THE CORRECT TOTAL AMOUNTS OF FOUR SEPARATE ITEM NUMBERS: A0120; A01 |
| Apr 11, 2022 | 0 | $28.6M | PROJECT NP-BLRI 2D17 THE PROJECT CONSISTS OF THE REPLACEMENT OF THE LAUREL FORK BRIDGE OF THE BLUE RIDGE PARKWAY LOCATED AT MILEPOST 248.85. THE WORK INCLUDES PRECAST SEGMENTAL CONCRETE, STRUCTURAL CONCRETE, POST-TENSIONING SYSTEM, REINFORCING STEEL |
Estimated positioning window
Dec 31, 2026 – Jun 30, 2027
70/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 70/100. Available recorded signals: 65 points.
- Contract end 2027-12-31 (432 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 15 recorded award transactions
- +10 points
- Latest award action: 2026-07-27
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.