Federal contract award
693C7323C000014
THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | 8(A) SOLE SOURCE |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $6.1M |
| Current contract value | $6.1M |
| Potential contract value / ceiling | $6.1M |
| Start date | Jul 21, 2023 |
| Current end date | Jun 30, 2027 |
| Potential end date | Jun 30, 2027 |
| Latest award activity | Jul 1, 2026 |
| Source loaded | Sep 19, 2026 |
Funding and modification history
Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jul 1, 2026 | P00006 | $30.0K | PR ER DOT PRMNT RPR (19) CM #6: 693C7323C000014 THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT BY $30,000.00 FROM $6,116,565.00 TO $6,146,565.00. 2) EXTEND CONTRACT TIME BY 135 DAYS. 3) ADJUST EXISTING PAY ITEM QUA |
| Sep 23, 2025 | P00005 | $1.4M | PR ER DOT PRMNT RPR (19) CM #5 INCREASE CONTRACT AMOUNT BY $1,427,500.00 EXTEND CONTRACT TIME BY 179 CALENDAR DAYS. |
| Sep 11, 2025 | P00004 | $233.7K | PROJECT PR ER DOT PRMNT RPR (19) CONTRACT MODIFICATION #4: THE PURPOSE OF THIS MODIFICATION IS TO: 1. TO INCREASE THE CONTRACT AMOUNT FROM $4,455,365.00 BY $233,700.00 TO $4,689,065.00. 2. TO EXTEND THE CONTRACT BY 60 CALENDAR DAYS. 3. TO CREA |
| Apr 10, 2025 | P00003 | $0 | PR ER DOT PRMNT RPR (19) CM #3 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO JUNE 30, 2027 |
| Feb 19, 2025 | P00002 | $28.0K | PR ER DOT PRMNT RPR (19) CM #2 INCREASE CONTRACT AMOUNT BY $28,000.00 NO CHANGE TO CONTRACT TIME |
| Aug 7, 2024 | P00001 | $47.0K | PR ER DOT PRMNT RPR (19) CM #1 INCREASE CONTRACT AMOUNT BY $47,025.00 NO CHANGE TO CONTRACT TIME |
| Jul 21, 2023 | 0 | $4.4M | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S |
Estimated positioning window
Nov 1, 2026 – Jan 30, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-06-30 (241 days from calculation)
- +35 points
- 221 historical awards in this buyer and category group
- +15 points
- 7 recorded award transactions
- +10 points
- Latest award action: 2026-07-01
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.