Federal contract award

693C7324F00075N

PROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicle693C7320D000006
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.0M
Current contract value$2.0M
Potential contract value / ceiling$2.0M
Start dateAug 6, 2024
Current end dateApr 21, 2026
Potential end dateApr 21, 2026
Latest award activityJun 12, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 7 of 7 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 12, 2026P00006$0THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO FINANCIALLY AND CONTRACTUALLY CLOSE THIS TASK ORDER CONTRACT IN ITS ENTIRETY IN THE AMOUNT OF $2,039,750.16.
Mar 18, 2026P00005$0THE PURPOSE OF THIS NO COST ADMINISTRATIVE MODIFICATION IS TO RECLASSIFY FUNDS FOR REIMBURSING FLTP FUNDS WITH DISASTER SUPPLEMENTAL FUNDS USING NEW ACCOUNTING INFORMATION 15A522ER20001.A40.CN.15F0.22.1522000000 AS FOLLOWS: 1. REDUCE CONTRACT LINE I
Jan 27, 2026P00004$39.8KTO INCREASE CONTRACT AMOUNT BY $39,809.48 FOR PROJECT LA ERFO FW SBN 2020-2(1).
Jun 17, 2025P00003$130.0KLA ERFO FW SBN 2020-2(1) CM #3 INCREASE CONTRACT AMOUNT BY $129,965.68 EXTEND CONTRACT TIME BY 33 CALENDAR DAYS ADDITIONAL REPAIRS AND TIME EXTENSION
Feb 20, 2025P00002$0LA ERFO FW SBN 2020-2(1) 693C7320D000006/693C7324F00075N CM #2 NO CHANGE TO CONTRACT AMOUNT EXTEND CONTRACT TIME BY 14 CALENDAR DAYS
Aug 14, 2024P00001$0PROJECT LA ERFO FW SBN 2020-2(1): THE PURPOSE OF THIS MODIFICATION IS TO: 1. REPLACE THE TABLE OF CONTENTS PAGE TO REFLECT THE ADDITION OF THE CORRECT 17-PAGE STATEMENT OF WORK DOCUMENT. 2. REPLACE THE INCORRECT 1-PAGE STATEMENT OF WORK DOCUME
Aug 6, 20240$1.9MPROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA