Federal contract award

693C7325C000011

PROJECT CATO 10(5), 11(2), ETC: THE PROJECT CONSISTS OF ROAD RECONSTRUCTION AND RESURFACING OF ROUTE 11 FOXVILLE-DEERFIELD AND ROUTE 10 PARK CENTRAL ROADS. THE WORK INCLUDES FULL DEPTH RECONSTRUCTION, 2.5 TO 4-INCH MILLING AND RESURFACING, PARTIAL A

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideSMALL BUSINESS SET ASIDE - TOTAL
Pricing typeFIRM FIXED PRICE
Obligations$3.7M
Current contract value$3.7M
Potential contract value / ceiling$3.7M
Start dateMay 6, 2025
Current end dateMay 31, 2028
Potential end dateMay 31, 2028
Latest award activityJun 4, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jun 4, 2026P00002$442.0KTHE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) INCREASE CONTRACT AMOUNT FROM $3,214,889.86 BY $441,976.23 TO $3,656,866.09. 2) FINALIZE EXISTING PAY ITEM QUANTITIES IN SCHEDULE A 3) INCREASE SUBEXCAVATION QUANTITIES AND CREATE A NEW PAY ITEM
Sep 15, 2025P00001$283.6KPROJECT CATO 10(5), 11(2), ETC: CONTRACT MODIFICATION #1 THE PURPOSE OF THIS MODIFICATION IS TO: 1. TO INCREASE THE CONTRACT AMOUNT FROM $2,931,301.73 BY $283,588.13 TO $3,214,889.86. 2. NO CHANGE TO CONTRACT TIME 3. SUBGRADE STABILIZATION
May 6, 20250$2.9MPROJECT CATO 10(5), 11(2), ETC: THE PROJECT CONSISTS OF ROAD RECONSTRUCTION AND RESURFACING OF ROUTE 11 FOXVILLE-DEERFIELD AND ROUTE 10 PARK CENTRAL ROADS. THE WORK INCLUDES FULL DEPTH RECONSTRUCTION, 2.5 TO 4-INCH MILLING AND RESURFACING, PARTIAL A

Estimated positioning window

May 31, 2027 – Nov 30, 2027

Recompete signal:
65/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 65/100. Available recorded signals: 60 points.

Contract end 2028-05-31 (577 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
3 recorded award transactions
+5 points
Latest award action: 2026-06-04
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.