Federal contract award

693C7325C000018

THIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicleNot reported
Set-asideNO SET ASIDE USED.
Pricing typeFIRM FIXED PRICE
Obligations$44.4M
Current contract value$44.4M
Potential contract value / ceiling$44.4M
Start dateNov 3, 2025
Current end dateMay 31, 2029
Potential end dateMay 31, 2029
Latest award activityJul 17, 2026
Source loadedSep 19, 2026

Funding and modification history

Showing the latest 5 of 5 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Jul 17, 2026P00004$0PROJECT VA NP GWMP MVT(4): THE PURPOSE OF THIS NO COST MODIFICATION IS TO INCORPORATE NEW FAR CLAUSE 52.222-90 - ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION APR 2026) PURSUANT TO EXECUTIVE ORDER (E.O.) 14398. ALL
Jun 1, 2026P00003$1.4MTHE PURPOSE OF THIS MODIFICATION IS TO: 1. ADD CLIN 00303 IN THE AMOUNT OF $1,367,320.10. 2. TOTAL CONTRACT AMOUNT IS INCREASED FROM $42,998,841.87 BY $1,367,320.10 TO $44,366,161.97. 3. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
May 28, 2026P00002$-1.4MTHE PURPOSE OF THIS MODIFICATION IS TO: 1. CANCEL ITEM 00302 IN ITS ENTIRETY IN THE AMOUNT OF $1,367,320.10. 2. TOTAL CONTRACT AMOUNT IS DECREASED FROM $44,366,161.97 BY $1,367,320.10 TO $42,998,841.87. 3. ALL OTHER TERMS AND CONDITIONS REMAIN U
Mar 4, 2026P00001$0THE PURPOSE OF THIS MODIFICATION IS TO: 1. DECREASE CLIN 00301 OBLIGATED TOTAL FROM $4,894,632.51 BY $1,367,320.10 TO $3,527,312.41. 2. ADD A NEW FUNDING CLIN 00302 IN THE AMOUNT OF $1,367,320.10 UNDER ACCOUNTING CODE 15A5513300076.R45.CN.15G0.51.
Sep 23, 20250$44.4MTHIS REQUEST FOR PROPOSAL (DESIGN BUILD) FOR GEORGE WASHINGTON MEMORIAL PARKWAY MOUNT VERNON TRAIL RECONSTRUCTION, PROJECT NO. VA NP GWMP MVT(4) LOCATED IN ARLINGTON COUNTY AND THE CITY OF ALEXANDRIA, VIRGINIA AND THE DISTRICT OF COLUMBIA, WASHINGTON

Estimated positioning window

May 31, 2028 – Nov 30, 2028

Recompete signal:
60/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 60/100. Available recorded signals: 55 points.

Contract end 2029-05-31 (949 days from calculation)
+15 points
221 historical awards in this buyer and category group
+15 points
5 recorded award transactions
+10 points
Latest award action: 2026-07-17
+5 points
Parent award identifier recorded
+0 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Check the stated set-aside against the solicitation and current certifications.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.