Federal contract award
693C7325F00021N
NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000015 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $2.3M |
| Current contract value | $2.3M |
| Potential contract value / ceiling | $2.3M |
| Start date | Dec 23, 2024 |
| Current end date | Oct 31, 2027 |
| Potential end date | Oct 31, 2027 |
| Latest award activity | Aug 10, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 10, 2026 | P00003 | $0 | NC ERFO NP BLRI 2024-1(2) - CM #3: 693C7320D000015/693C7325F00021N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR NC ERFO NP BLRI 2024-1(2) TO OCTOBER 31, 2027. ALL OTHER TERMS AND CONDITIONS REMAIN |
| Sep 17, 2025 | P00002 | $0 | NC ERFO NP BLRI 2024-1(2) 693C7320D000015/693C7325F00021N CM #2 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO OCTOBER 31, 2026 |
| Jul 23, 2025 | P00001 | $49.2K | NC ERFO NP BLRI 2024-1(2) 693C7320D000015/693C7325F00021N CM #1 INCREASE CONTRACT AMOUNT BY $49,200.00 NO CHANGE TO CONTRACT TIME |
| Dec 23, 2024 | 0 | $2.2M | NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO |
Estimated positioning window
Nov 1, 2026 – Apr 30, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2027-10-31 (364 days from calculation)
- +35 points
- 221 historical awards in this buyer and category group
- +15 points
- 4 recorded award transactions
- +10 points
- Latest award action: 2026-08-10
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-11-01 10:17:53.997580+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Nov 1, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.