Federal contract award

693C7325F00021N

NC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicle693C7320D000015
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$2.3M
Current contract value$2.3M
Potential contract value / ceiling$2.3M
Start dateDec 23, 2024
Current end dateOct 31, 2027
Potential end dateOct 31, 2027
Latest award activityAug 10, 2026
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 4 of 4 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Aug 10, 2026P00003$0NC ERFO NP BLRI 2024-1(2) - CM #3: 693C7320D000015/693C7325F00021N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR NC ERFO NP BLRI 2024-1(2) TO OCTOBER 31, 2027. ALL OTHER TERMS AND CONDITIONS REMAIN
Sep 17, 2025P00002$0NC ERFO NP BLRI 2024-1(2) 693C7320D000015/693C7325F00021N CM #2 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO OCTOBER 31, 2026
Jul 23, 2025P00001$49.2KNC ERFO NP BLRI 2024-1(2) 693C7320D000015/693C7325F00021N CM #1 INCREASE CONTRACT AMOUNT BY $49,200.00 NO CHANGE TO CONTRACT TIME
Dec 23, 20240$2.2MNC ERFO NP BLRI 2024-1(2): THE PROJECT CONSISTS OF STABILIZING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES STABILIZING AN EMBANKMENT WITH NC DOT SHOT ROCK, INSTALLING GEOMEMBRANE WITH SANDBAGS, PLACING BARRIERS TO

Estimated positioning window

Nov 1, 2026 – Apr 30, 2027

Recompete signal:
85/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 85/100. Available recorded signals: 80 points.

Contract end 2027-10-31 (364 days from calculation)
+35 points
221 historical awards in this buyer and category group
+15 points
4 recorded award transactions
+10 points
Latest award action: 2026-08-10
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-11-01 10:17:53.997580+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Nov 1, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.