Federal contract award
693C7325F00023N
PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000015 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $14.7M |
| Current contract value | $14.7M |
| Potential contract value / ceiling | $14.7M |
| Start date | Dec 26, 2024 |
| Current end date | Dec 31, 2027 |
| Potential end date | Dec 31, 2027 |
| Latest award activity | Nov 17, 2025 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Nov 17, 2025 | P00005 | $0 | NC ERFO NP BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #5 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2027 |
| Sep 3, 2025 | P00004 | $999.5K | NC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #4 INCREASE CONTRACT AMOUNT BY $999,501.00 NO CHANGE TO CONTRACT TIME |
| Jul 22, 2025 | P00003 | $444.9K | NC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #3 INCREASE CONTRACT AMOUNT BY $444,850.00 NO CHANGE TO CONTRACT TIME |
| Jun 30, 2025 | P00002 | $5.9M | NC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #2 INCREASE CONTRACT AMOUNT BY $5,865,200.00 EXTEND CONTRACT TIME BY 54 CALENDAR DAYS |
| Jan 13, 2025 | P00001 | $0 | PROJECT NC ERFO NP BLRI 2024-1(1) THE PURPOSE OF THIS NO-COST, ADMINISTRATIVE MODIFICATION IS TO CORRECT THE CONTRACT NUMBER LISTED ON THE COVER PAGE OF THE TASK ORDER BOOK. THE CORRECT CONTRACT NUMBER IS 693C73-20-D-000015. ALL OTHER TERMS AND |
| Dec 26, 2024 | 0 | $7.4M | PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC |
Estimated positioning window
Dec 31, 2026 – Jun 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-12-31 (432 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2025-11-17
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.