Federal contract award

693C7325F00023N

PROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC

Research the contractorView USAspending sourceSave to my pursuit research

Award details

Obligations, current value and potential value describe different measures; they are never added together.

FieldReported value
AgencyDepartment of Transportation
Office693C73 EASTERN FED LANDS DIVISION
NAICS237310 — Highway, Street, and Bridge Construction
PSCY1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Parent award / vehicle693C7320D000015
Set-asideNot reported
Pricing typeFIRM FIXED PRICE
Obligations$14.7M
Current contract value$14.7M
Potential contract value / ceiling$14.7M
Start dateDec 26, 2024
Current end dateDec 31, 2027
Potential end dateDec 31, 2027
Latest award activityNov 17, 2025
Source loadedSep 26, 2026

Funding and modification history

Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.

DateModificationObligation changeDescription
Nov 17, 2025P00005$0NC ERFO NP BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #5 NO CHANGE TO CONTRACT AMOUNT NO CHANGE TO CONTRACT TIME EXTEND PERIOD OF PERFORMANCE TO DECEMBER 31, 2027
Sep 3, 2025P00004$999.5KNC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #4 INCREASE CONTRACT AMOUNT BY $999,501.00 NO CHANGE TO CONTRACT TIME
Jul 22, 2025P00003$444.9KNC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #3 INCREASE CONTRACT AMOUNT BY $444,850.00 NO CHANGE TO CONTRACT TIME
Jun 30, 2025P00002$5.9MNC ERFO NP-BLRI 2024-1(1) 693C7320D000015/693C7325F00023N CM #2 INCREASE CONTRACT AMOUNT BY $5,865,200.00 EXTEND CONTRACT TIME BY 54 CALENDAR DAYS
Jan 13, 2025P00001$0PROJECT NC ERFO NP BLRI 2024-1(1) THE PURPOSE OF THIS NO-COST, ADMINISTRATIVE MODIFICATION IS TO CORRECT THE CONTRACT NUMBER LISTED ON THE COVER PAGE OF THE TASK ORDER BOOK. THE CORRECT CONTRACT NUMBER IS 693C73-20-D-000015. ALL OTHER TERMS AND
Dec 26, 20240$7.4MPROJECT NC ERFO NP BLRI 2024-1(1): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES TWO SLIDE REPAIRS WITH REINFORCED SOIL SLOPE (RSS), DEEP PATCH, MINIMAL TREE REMOVAL FOR ACCESS, DITC

Estimated positioning window

Dec 31, 2026 – Jun 30, 2027

Recompete signal:
75/100

Why this recompete signal

Contract timing and recorded acquisition signals at the time of calculation.

Stored score: 75/100. Available recorded signals: 70 points.

Contract end 2027-12-31 (432 days from calculation)
+25 points
221 historical awards in this buyer and category group
+15 points
6 recorded award transactions
+10 points
Latest award action: 2025-11-17
+5 points
Parent award identifier recorded
+5 points
Solicitation identifier recorded
+10 points
Linked official forecast
+0 points
Calculated on
2026-10-25 10:18:04.631876+00:00

The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.

Rule-based research score; it does not measure your chance of winning.

This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.

USAspending award record

. Rule-based research score; positioning dates are estimates.

Recompete score calculated Oct 25, 2026.

Research next steps

  1. Check the linked forecast or SAM for a confirmed solicitation and current timing.
  2. Confirm the ordering vehicle and your eligibility or a qualified teaming route.
  3. Review the award scope and buyer evidence before making a bid/no-bid decision.