Federal contract award
693C7325F00025N
PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000015 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $4.9M |
| Current contract value | $4.9M |
| Potential contract value / ceiling | $4.9M |
| Start date | Dec 31, 2024 |
| Current end date | Nov 30, 2027 |
| Potential end date | Nov 30, 2027 |
| Latest award activity | Aug 6, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 8 of 8 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 6, 2026 | P00007 | $-1.9M | NC ERFO NP-BLRI 2024-1(3) - CM #7: 693C7320D000015/693C7325F00025N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE CONTRACT AMOUNT BY $1,941,973.80 FROM $6,808,135.00 TO $4,866,161.20. 2) ADJUST THE FINAL QUANTITIES OF CONTRACT |
| Oct 15, 2025 | P00006 | $0 | PROJECT: NC ERFO NP BLRI 2024-1(3) - CONTRACT MODIFICATION #6 THE PURPOSE OF THIS MODIFICATION IS TO: 1) EXTEND PERIOD OF PERFORMANCE TO NOVEMBER 30, 2027 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Sep 8, 2025 | P00005 | $-1.2M | NC ERFO NP-BLRI 2024-1(3) 693C7320D000015/693C7325F00025N CM #5 DECREASE CONTRACT AMOUNT BY $1,200,010.00 NO EFFECT ON CONTRACT TIME |
| Jul 23, 2025 | P00004 | $2.8M | NC ERFO NP-BLRI 2024-1(3) 693C7320D000015/693C7325F00025N CM #4 INCREASE CONTRACT AMOUNT BY $2,820,000.00 EXTEND CONTRACT TIME TO AUGUST 8, 2025 |
| Jul 7, 2025 | P00002 | $241.4K | NC ERFO NP-BLRI 2024-1(3) 693C7320D000015/693C7325F00025N CM #2 INCREASE CONTRACT AMOUNT BY $241,425.00 NO CHANGE TO CONTRACT TIME |
| Jul 7, 2025 | P00003 | $100.0K | NC ERFO NP BLRI 2024-1(3) 693C7320D000015/693C7325F00025N CM #3 ADMINISTRATIVE CM TO SHOW CONTRACT INCREASE AMOUNT OF $100,000.00 FOR LINE 00101 |
| Apr 16, 2025 | P00001 | $0 | NC ERFO NP BLRI 2024-1(3) 693C7320D000015/693C7325F00025N CM #1 INCREASE CONTRACT AMOUNT BY $100,000.00 NO CHANGE TO CONTRACT TIME |
| Dec 31, 2024 | 0 | $4.8M | PROJECT NC ERFO NP BLRI 2024-1(3): THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN |
Estimated positioning window
Nov 30, 2026 – May 30, 2027
75/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 75/100. Available recorded signals: 70 points.
- Contract end 2027-11-30 (401 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 8 recorded award transactions
- +10 points
- Latest award action: 2026-08-06
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.