Federal contract award
693C7325F00027N
PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000019 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $961.8K |
| Current contract value | $961.8K |
| Potential contract value / ceiling | $961.8K |
| Start date | Jan 10, 2025 |
| Current end date | Jul 31, 2027 |
| Potential end date | Jul 31, 2027 |
| Latest award activity | Jun 23, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 3 of 3 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Jun 23, 2026 | P00002 | $0 | PA ERFO FW CHV 2020-1(1) - CM #2: 693C7320D000019/693C7325F00027N THE PURPOSE OF THIS CONTRACT MODIFICATION (CM) IS TO: 1) EXTEND THE PERIOD OF PERFORMANCE FOR PA ERFO FW CHV 2020-1(1) TO JULY 31, 2027 |
| Sep 16, 2025 | P00001 | $-37.1K | PROJECT: PA ERFO FW CHV 2020-1(1) CONTRACT MODIFICATION #1 1. TO DECREASE CONTRACT AMOUNT BY $37,071.91 2. TO EXTEND CONTRACT BY 51 CALENDAR DAY 3. TO ADDRESS THE ADDITION OF ASPHALT CONCRETE PAVEMENT IN SCHEDULE B. 4. TO ADDRESS OVERRUNS AND UND |
| Jan 10, 2025 | 0 | $998.9K | PROJECT PA ERFO FW CHV 2020-1(1): THE PROJECT CONSISTS OF THE REHABILITATION OF BACK NINE TRAIL, RIDGE NATURE TRAIL AND RIDGE NATURE PARKING AREA. THE WORK INCLUDES REMOVING AND REPLACING ASPHALT CONCRETE PAVEMENT, ROADWAY EXCAVATION, ROADBED RECOND |
Estimated positioning window
Oct 25, 2026 – Jan 31, 2027
80/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 80/100. Available recorded signals: 75 points.
- Contract end 2027-07-31 (279 days from calculation)
- +35 points
- 221 historical awards in this buyer and category group
- +15 points
- 3 recorded award transactions
- +5 points
- Latest award action: 2026-06-23
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.