Federal contract award
693C7325F00037N
PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | 693C7320D000016 |
| Set-aside | Not reported |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $3.8M |
| Current contract value | $3.8M |
| Potential contract value / ceiling | $3.8M |
| Start date | Feb 26, 2025 |
| Current end date | Jun 30, 2027 |
| Potential end date | Jun 30, 2027 |
| Latest award activity | Aug 27, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 6 of 6 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Aug 27, 2026 | P00005 | $-0 | NC ERFO NP-BLRI 2024-1(4) - CM #5: 693C7320D000016/693C7325F00037N THE PURPOSE OF THIS CONTRACT MODIFICATION IS TO: 1) DECREASE CONTRACT AMOUNT BY -$0.43 FROM $3,777,134.53 TO $3,777,134.10. 2) EXTEND CONTRACT TIME BY 482 CALENDAR DAYS. 3) AD |
| Dec 22, 2025 | P00004 | $0 | NC ERFO NP BLRI 2024-1(4) / 693C7320D000016/693C7325F00037N - CM #4 THE PURPOSE OF THIS CM IS TO: 1. EXTEND PERIOD OF PERFORMANCE TO JUNE 30, 2027 ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. |
| Sep 10, 2025 | P00003 | $-1 | NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #3 DECREASE CONTRACT AMOUNT BY -$0.52 EXTEND CONTRACT TIME BY 15 CALENDAR DAYS |
| Aug 6, 2025 | P00002 | $288.1K | NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #2 INCREASE CONTRACT AMOUNT BY $288,137.60 EXTEND CONTRACT TIME BY 40 CALENDAR DAYS |
| Jun 24, 2025 | P00001 | $500.0K | NC ERFO NP-BLRI 2024-1(4) 693C7320D000016/693C7325F00037N CM #1 INCREASE CONTRACT AMOUNT BY $499,997.45 NO CHANGE TO CONTRACT TIME |
| Feb 26, 2025 | 0 | $3.0M | PROJECT NC ERFO NP BLRI 2024-1(4) THE PROJECT CONSISTS OF REPAIRING DAMAGE TO THE BLUE RIDGE PARKWAY CAUSED BY HURRICANE HELENE. THE WORK INCLUDES A SLIDE REPAIR WITH REINFORCED SOIL SLOPE (RSS), MINIMAL TREE REMOVAL FOR ACCESS, DITCH RECONDITIONIN |
Estimated positioning window
Oct 25, 2026 – Jan 23, 2027
85/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 85/100. Available recorded signals: 80 points.
- Contract end 2027-06-30 (248 days from calculation)
- +35 points
- 221 historical awards in this buyer and category group
- +15 points
- 6 recorded award transactions
- +10 points
- Latest award action: 2026-08-27
- +5 points
- Parent award identifier recorded
- +5 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Confirm the ordering vehicle and your eligibility or a qualified teaming route.
- Review the award scope and buyer evidence before making a bid/no-bid decision.