Federal contract award
693C7326C000019
PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL, RECONSTRUCTION OF THE ROADWAY SECTION WITH ASPH
Award details
Obligations, current value and potential value describe different measures; they are never added together.
| Field | Reported value |
|---|---|
| Agency | Department of Transportation |
| Office | 693C73 EASTERN FED LANDS DIVISION |
| NAICS | 237310 — Highway, Street, and Bridge Construction |
| PSC | Y1LB — CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS |
| Parent award / vehicle | Not reported |
| Set-aside | NO SET ASIDE USED. |
| Pricing type | FIRM FIXED PRICE |
| Obligations | $5.3M |
| Current contract value | $5.3M |
| Potential contract value / ceiling | $5.3M |
| Start date | Sep 1, 2026 |
| Current end date | Mar 7, 2028 |
| Potential end date | Mar 7, 2028 |
| Latest award activity | Sep 1, 2026 |
| Source loaded | Sep 26, 2026 |
Funding and modification history
Showing the latest 1 of 1 loaded transactions. Negative values are deobligations.
| Date | Modification | Obligation change | Description |
|---|---|---|---|
| Sep 1, 2026 | 0 | $5.3M | PROJECT WV NP NERI 107(3) THE PROJECT CONSISTS OF THE REPAIR OF A SLIDE ON CUNARD RIVER ACCESS ROAD USING AN ANCHORED SOLDIER PILE WALL. THE WORK INCLUDES CONSTRUCTION OF AN ANCHORED SOLDIER PILE WALL, RECONSTRUCTION OF THE ROADWAY SECTION WITH ASPH |
Estimated positioning window
Mar 7, 2027 – Sep 7, 2027
60/100
Why this recompete signal
Contract timing and recorded acquisition signals at the time of calculation.
Stored score: 60/100. Available recorded signals: 55 points.
- Contract end 2028-03-07 (499 days from calculation)
- +25 points
- 221 historical awards in this buyer and category group
- +15 points
- 1 recorded award transactions
- +0 points
- Latest award action: 2026-09-01
- +5 points
- Parent award identifier recorded
- +0 points
- Solicitation identifier recorded
- +10 points
- Linked official forecast
- +0 points
- Calculated on
- 2026-10-25 10:18:04.631876+00:00
The historical group combines buyer, NAICS, and PSC. Multiple awards in this group do not by themselves establish repeated competitions.
Rule-based research score; it does not measure your chance of winning.
This older calculation does not retain a complete reproducible breakdown. Missing or changed inputs are not assigned invented points: Original award-value bonus input.
Recompete score calculated Oct 25, 2026.
Research next steps
- Check the linked forecast or SAM for a confirmed solicitation and current timing.
- Check the stated set-aside against the solicitation and current certifications.
- Review the award scope and buyer evidence before making a bid/no-bid decision.